Each service for High rise Buildings MEP Basics please share Drainage, HVAC, Staircase, Pump room, Basement Ventilation, Heat Exchangers, Calculation for Sprinkler Pump selection, Breaching Inlet, Hot Water Sarculation Pump, Etc., Expected more Ji. I Love your friendly advise.
1:26 "Gulf countries ALL OVER THE WORLD" wow sounds amazing. Except that all Gulf countries only exist in the Middle east. If anyone can find me a Gulf country in N/S America, Africa, East Asia - I will salute them.
you are absolute;y wrong engineer,. high rise buildings are using pneumatic pump to maintain the hot and cold water from basments directly to the floor, ythere is no need service floor my dear engineer ..
U are right sir, Service slab not at all required. Even 40 stories building we doing gravity distribution system. Some of the projects we have done. Combination of both gravity and hydropneumatic pneumatic system.
Nice explanation shibin. Because u had a huge experience in Dubai metro, high rise building etc. well done goahead.
Better to explain in a language you know.
Only problem is the language by the way, but information is worthy. 🤣 Your confidence is phenomenal afterall.
Shibin Anna !! Very well explained ! Thank you so much for this valuable content.
Great explained sir thank you so much sir please mechanical maintenance engineer job dutyes explain karye one time❤I am from jharkhand dhanbad
Thank u for information related to plumbing.
Each service for High rise Buildings MEP Basics please share Drainage, HVAC, Staircase, Pump room, Basement Ventilation, Heat Exchangers, Calculation for Sprinkler Pump selection, Breaching Inlet, Hot Water Sarculation Pump, Etc., Expected more Ji. I Love your friendly advise.
Pls use some slides and pictures for better understanding, thanks for the information
Nice explanation Sir.
1:26 "Gulf countries ALL OVER THE WORLD" wow sounds amazing. Except that all Gulf countries only exist in the Middle east.
If anyone can find me a Gulf country in N/S America, Africa, East Asia - I will salute them.
Please share details about drainage riser line of 25th floor commercial building and how to control that flow of drainage pipe in basement...????
Thanks, my doubts cleared 🎉
Very nicely explained sir !!! keep up the good works
Most of bulding booster pump serves to higher floor. Pls make correction and make another vedio
Sir sum pump kese lagata he pipeing kese hota he nrb gete valve kese lagata he upload karia
Isko sar Hindi mein translate kijiye
Water year problem kheya hota hey
Nice explanation sir
Very nice sir...waiting for next part.
What are doing... here...plz...go... labour work..😊
Waiting for your next video....
Sir can u show the example of schematic pf high rise building
Thanks sir besafe sir❤❤❤
Eni Malayalathil parunju theruvo
PRV means pressure reducing valve know
im waiting your next video for drainage line.
very nice sir
Well explained
i learn from you
SIR ARE U TAKING ANY ONLINE CLASSES
Sir we are waiting your next video about drainage line
Thankyou sir
Tx sir❤❤❤❤
thank u sir,
11:30
Thank you
👌👌
Kindly talk in malayalam
you are absolute;y wrong engineer,. high rise buildings are using pneumatic pump to maintain the hot and cold water from basments directly to the floor, ythere is no need service floor my dear engineer ..
U are right sir,
Service slab not at all required.
Even 40 stories building we doing gravity distribution system.
Some of the projects we have done. Combination of both gravity and hydropneumatic pneumatic system.
Very exactly said
Khand di nista baba,haha
Very good explanation👍
How can I contact you, Please share your contact details
I need some queries
Thank you
Thank you