Coach/Bitterroot (Construction Update)

Поділитися
Вставка
  • Опубліковано 7 лют 2025
  • Here's an update on Bogus Basin's 2 new Skytrac quads. All 7 towers on Coach have been flown in, as well as all 13 towers on Bitterroot have been flown in. The bottom and top terminals for Coach have been fully completed and enclosed. The top of Bitterroot is nearly completed. The shacks have been installed at both the top and bottom of Coach.
    Recorded on September 21st, 2024.

КОМЕНТАРІ • 7