We'll see if you catch that your Denver to Albuquerque should have a Supply tower AND repairs in Albuquerque...OK, Deming got you to make the repairs, now for the tower! Yay! Got the tower in just in time! Oh dear! Your throwaway express line from Denver south has a single track--that NEVER got thrown away! In fact, coal, cloth, etc. are now running over it. Was surprised you never got a warning about a long 1-way stretch. Oh my! You looked to found Raton and didn't see the single track north out of it. Later still you plopped a tower on it and didn't see it was a single line. Thought for sure the huge traffic jam would make you find it--BUT--you thought it was a supply tower issue. Wondering about your choice of the 'manual loading' line for the chemicals. First, when you made it and made all 8 slots be chemicals, that's not really using it--just make a load full and be done with it. Then you DID change it to be 4, but decided the OTHER four should be empty?? Those should have been whatever so you might have moved planks or whatever instead of dead-heading 4 cars. if they had pulled in 4 more chemicals it wouldn't have been bad, right? I only ever tried to use the manual loading when using a single train to try and drop off some goods to two separate stations along the way, say 4 grain in each of two station.
To keep it interesting for myself and to show multiple approaches, I try to come up with different designs to get the job done. Sometimes warehouses are included, sometimes not. I really liked the warehouse setup for New Mexico. It was different and effective.
Thanks for another great video good sir 👍. I remember I wasted a lot of time and resources with Texas, this was a much better build
Glad you enjoyed it
Me2 😂
We'll see if you catch that your Denver to Albuquerque should have a Supply tower AND repairs in Albuquerque...OK, Deming got you to make the repairs, now for the tower! Yay! Got the tower in just in time!
Oh dear! Your throwaway express line from Denver south has a single track--that NEVER got thrown away! In fact, coal, cloth, etc. are now running over it. Was surprised you never got a warning about a long 1-way stretch. Oh my! You looked to found Raton and didn't see the single track north out of it. Later still you plopped a tower on it and didn't see it was a single line. Thought for sure the huge traffic jam would make you find it--BUT--you thought it was a supply tower issue.
Wondering about your choice of the 'manual loading' line for the chemicals. First, when you made it and made all 8 slots be chemicals, that's not really using it--just make a load full and be done with it. Then you DID change it to be 4, but decided the OTHER four should be empty?? Those should have been whatever so you might have moved planks or whatever instead of dead-heading 4 cars. if they had pulled in 4 more chemicals it wouldn't have been bad, right? I only ever tried to use the manual loading when using a single train to try and drop off some goods to two separate stations along the way, say 4 grain in each of two station.
I had an instance where using manual with 4 of the desired item and 4 wild cards sent 2 desired and 2 wild cards when set to minimum of 4.
AGAIN : i love this new " re- doing" !
Hadji 😊
Glad you are enjoying it.
Good video! I was wondering when or if you would bring in a warehouse or not ;)
Makes sense where you put it!
To keep it interesting for myself and to show multiple approaches, I try to come up with different designs to get the job done. Sometimes warehouses are included, sometimes not. I really liked the warehouse setup for New Mexico. It was different and effective.