RTS Link Johor Singapore (August 2024)

Поділитися
Вставка
  • Опубліковано 27 гру 2024

КОМЕНТАРІ • 70

  • @SGYap
    @SGYap  5 місяців тому +24

    Hi everyone, as I will be in Singapore the next 2 weekends to film the NDP 2024 fireworks from MBS observation deck and to watch a concert, I decided to film and release the August RTS updates earlier. Happy viewing and remember to subscribe to SG Yap : ) Thank you!

    • @MingSyB
      @MingSyB 5 місяців тому +1

      Wow! So cool :› +Treat

    • @SGYap
      @SGYap  5 місяців тому +1

      @@MingSyB It was nice to have an ice cream treat especially after the outdoor filming in the hot afternoon

    • @glitchFuturre8888
      @glitchFuturre8888 4 місяці тому

      Hot afternoon evening Tea Break 2pm to 5pm eat ice cream​@@SGYap

  • @WerdnaFPV
    @WerdnaFPV 5 місяців тому +12

    my favorite design thinking teacher, thank you for nice video Mr Yap

    • @SGYap
      @SGYap  5 місяців тому +2

      Thank you very much! Hope you enjoyed the design thinking lessons

  • @skanthaadsigns
    @skanthaadsigns 4 місяці тому +2

    May Singapore & Malaysia proper together with each bringing their Economic strength together 🎉🎉

  • @hamiltonastan
    @hamiltonastan 5 місяців тому +12

    what a progress of the JB's marine viaduct with 10 complete spans! the transition pier on the JB side is finally taking shape for the final girder assembly works to the marine viaduct. hopefully, the assembly works on the entire RTS marine viaduct will be completed by the year-end of 2024. it's good to show the people going the "gotong-royong" cleaning activity at the Stulang Promenade in JB. the latest news on the KTM's EDTP project is that the ETS train service extension to Segamat is delayed to October due to ongoing testing and commissioning works along the Segamat section.

    • @SGYap
      @SGYap  5 місяців тому +2

      The launching gantry will move forward one more time to Pier #45 to hoist the SBG into positions. After that, the launching gantry will retreat all the way back to the initial starting position and complete the 2 short spans to join the marine viaduct to the land viaduct

    • @hamiltonastan
      @hamiltonastan 5 місяців тому +1

      @@SGYap looks like CCCC will follow Sunway's footsteps in terms of retreating the launching girder back to the original position and relaunching it in the opposite direction.

    • @SGYap
      @SGYap  5 місяців тому +1

      @@hamiltonastan Yes, after moving forward one more span to Pier #45, the LG will retreat back to original position to complete the remaining 2 short spans and join up with the land viaduct. Yes, looks like CCCC is following Sunway's LG footstep

  • @coolTCA
    @coolTCA 5 місяців тому +7

    Super excited for the RTS, looks like it's coming together very smoothly!

    • @SGYap
      @SGYap  5 місяців тому

      Yes, the RTS Link is on track for a Jan 2027 opening

  • @ZhangYuanYong
    @ZhangYuanYong 5 місяців тому +7

    Actually, the live cctv footage of the causeway, also available on UA-cam, also can see the RTS Link progress in real time.
    Nonetheless, I am amazed at how fast they accelerated the viaduct construction ever since they announced track access target by year end.
    Maybe after RTS Link finish construction by middle of 2025 thereabout, can move on to cover Jurong Region Line. By then JRL stage 1 already completed. But still can cover stage 2 (Tengah to Pandan Reservoir). Also an elevated rail project. And because it’s in Singapore, don’t need to go through custom.

    • @SGYap
      @SGYap  5 місяців тому +3

      Currently my plan is to provide updates on either Tanah Mehra MRT station or the Jurong Region Line once every 3 months while the RTS Link I will continue to provide monthly updates

    • @KUKUMAIL
      @KUKUMAIL 5 місяців тому +1

      Yes..especially JRL3 that link up to NTU . Is it on now? Normally the final stage commences later......🤷

    • @SGYap
      @SGYap  5 місяців тому +2

      @@KUKUMAIL There are already a lot of JRL construction activities within NTU compound. You can check out my update on JRL in this video ua-cam.com/video/8SS3N5n61sE/v-deo.html

  • @mycarnews
    @mycarnews 5 місяців тому +3

    Love ❤Malaysia
    Love ❤️ Singapore

  • @jamielim5059
    @jamielim5059 5 місяців тому +3

    They build 24 hrs none stop! Bravo to the foreign workers 👏🏻👏🏻👏🏻👏🏻

    • @SGYap
      @SGYap  5 місяців тому

      The constructions at the Bukit Chagar RTS site has been ongoing non-stop day and night including weekends

  • @Kaipochama
    @Kaipochama 4 місяці тому +1

    SG side so tidy as always, not overwhelmed by too many elevated tracks or highways

  • @CattleFarmer667
    @CattleFarmer667 5 місяців тому +2

    The construction is quite fast. Good job

    • @SGYap
      @SGYap  5 місяців тому +1

      Most of the constructions should end by end of this year and next year onwards should be the installation of the systems and testing phase

    • @rohanaahmad3175
      @rohanaahmad3175 4 місяці тому +1

      Looking forward to this phase

  • @Callsign-Blade_RunnerSG
    @Callsign-Blade_RunnerSG 5 місяців тому +2

    Please take your time to build. No rush.

  • @palmtide
    @palmtide 5 місяців тому +2

    It ia a good guide to the RTS.

    • @SGYap
      @SGYap  5 місяців тому +1

      Happy to know that the video is a good guide to the RTS

  • @KUKUMAIL
    @KUKUMAIL 5 місяців тому +4

    Thanks for your Aug update.
    1). Correct if I am wrong: The day to day operation n maintenance work of RTS will b managed by SMRT or its subsidiary directly under SMRT control is it? If yes, to it will b excellent.
    2) Looking forward for speedy completion of southern stretch of ETS train service so that I can travel down to JB more convenient n less stressful.

    • @nick_1551
      @nick_1551 5 місяців тому +3

      For 1) RTS will be operated & managed by the joint venture formed between SMRT & Prasarana known as RTS Operations Pte Ltd, also known as OpCo.

    • @KUKUMAIL
      @KUKUMAIL 5 місяців тому +3

      @@nick_1551 TQ sir for enlightening.🙏

    • @SGYap
      @SGYap  5 місяців тому +3

      I am looking forward to the speedy completion of the southern stretch of the ETS train service too so that I could travel up north more often!

    • @HanifHashim-c3p
      @HanifHashim-c3p 5 місяців тому +3

      @@SGYap don't worry it will be ready slightly late let us enjoy this occasion where travelling between Singapore to KL is longer taking a day but instead 4 hours only

    • @SGYap
      @SGYap  5 місяців тому +2

      @@HanifHashim-c3p Currently, I take the express coach from Lakin to TBS, the journey also takes around 4 hours if there are no traffic jams

  • @MohdrozlanAbdullah
    @MohdrozlanAbdullah 5 місяців тому +3

    Tetangggggaaa ketar ketir..😂😂😂😂

  • @ZhaoZimingPl
    @ZhaoZimingPl 5 місяців тому +2

    Can't wait for September 2024 when the very next update of the new Tanah Merah MRT platforms would be out!

    • @SGYap
      @SGYap  5 місяців тому +1

      Yes, I am planning to provide an update of Tanah Merah MRT platforms in September

  • @SuperValue350
    @SuperValue350 5 місяців тому +2

    Will you be updating Tanah Merah next? It's been almost 6 months since the last and there should be significant progress since then.

    • @SGYap
      @SGYap  5 місяців тому +1

      You are right, I am planning to do a Tanah Merah MRT station update in September

  • @zanzillahsaruji9966
    @zanzillahsaruji9966 5 місяців тому +3

    Two different style in making bridges between Malaysia and Singapore....next is HSR Kuala Lumpur to Singapore....👍

    • @SGYap
      @SGYap  5 місяців тому

      Yes, the construction methods are different for both countries at the marine viaduct

  • @marktan3668
    @marktan3668 5 місяців тому +5

    Bridge is there !

  • @venusyyong641
    @venusyyong641 5 місяців тому +1

    👍👍

  • @leeho-y8l
    @leeho-y8l 5 місяців тому +1

    When was this taken?

    • @SGYap
      @SGYap  5 місяців тому +1

      The video was filmed on 28 July

    • @leeho-y8l
      @leeho-y8l 5 місяців тому +2

      @@SGYap thanks for the reply

  • @erictayverystrongimaginati1662
    @erictayverystrongimaginati1662 5 місяців тому +3

    Malaysia boleh lah 👍

  • @HairiHalimah-yf2bq
    @HairiHalimah-yf2bq 4 місяці тому

    Good job bro

    • @SGYap
      @SGYap  4 місяці тому

      Thank you so much 😀

  • @ykdagamer
    @ykdagamer 5 місяців тому +1

    Will it be a single track way? I don’t know if it is just me but the sbg does not look wide enough to fit 2 tracks lol

    • @sharxM16
      @sharxM16 5 місяців тому +1

      2

    • @SGYap
      @SGYap  5 місяців тому +1

      It is dual tracks, not single track. The SBG can fit 2 trains moving in opposite directions

  • @AIMBLOXKIN
    @AIMBLOXKIN 5 місяців тому +1

    Mr Yap, the month August or July

    • @SGYap
      @SGYap  5 місяців тому +1

      I named the video August 2024 RTS Link updates. The reason is I will be in Singapore for the next 2 weekends to film the NDP 2024 fireworks from MBS observation deck and to watch a concert. Hence I decided to film and release the August RTS updates slightly earlier

    • @AIMBLOXKIN
      @AIMBLOXKIN 5 місяців тому +1

      @@SGYap oh ok

  • @plty3931
    @plty3931 5 місяців тому +2

    Hi Mr Yap 🐐❤

    • @SGYap
      @SGYap  5 місяців тому +1

      Hello : )

  • @tamachan1987
    @tamachan1987 5 місяців тому +1

    This could have been build years back thanks to special people whom cannot see far ahead.

    • @SGYap
      @SGYap  5 місяців тому +2

      The delay has also resulted in much higher cost for the project as construction cost went up a lot after the covid-19 pandemic

    • @muhammadfairuzsamsi7209
      @muhammadfairuzsamsi7209 5 місяців тому +1

      They wanted a bridge that would allow ships to pass through to access their port therefore bypassing Singapore which Singapore obviously disagree. It's a political move. back then

  • @yong9976
    @yong9976 5 місяців тому +2

    It's challengful for building cross the causeway. They can't stop the whole traffic there.

    • @nick_1551
      @nick_1551 5 місяців тому +2

      Which is why it will likely be done at midnight, where traffic will be minimal. And there will be lane closures, or even partial road closures during the period

    • @SGYap
      @SGYap  5 місяців тому +1

      Yes, MRT Corp often announced lane closures taking place late at night when traffics are the lightest

  • @mmustafaisatafa5359
    @mmustafaisatafa5359 5 місяців тому +1

    Mana konoha ketar ketir ni

  • @ottomantaiga8118
    @ottomantaiga8118 4 місяці тому

    Consider merger w Johor

  • @raymondwan-k4w
    @raymondwan-k4w 5 місяців тому +1

    still not complete yet????? haris is usa president...panda r in town n paris olympics done...trump jailed,,,,,,,,evident both countries deem low priorty 2 finish bridge..drag it out

    • @Rash7
      @Rash7 5 місяців тому +4

      Go help them build and contribute

    • @Azri-hv2tj
      @Azri-hv2tj 5 місяців тому +2

      You think build a viaduct and train station is like to be build like a lego?..

    • @raymondwan-k4w
      @raymondwan-k4w 5 місяців тому +1

      @@Rash7 " tear down the causeway """...

    • @raymondwan-k4w
      @raymondwan-k4w 5 місяців тому +1

      @@Azri-hv2tj china built 4,000 bed hospital in 14 days

    • @Azri-hv2tj
      @Azri-hv2tj 5 місяців тому

      @@raymondwan-k4w quality??