GAP Electric Geyser Installation

Поділитися
Вставка
  • Опубліковано 27 чер 2019
  • How to install an electric Eco Max GAP Geyser

КОМЕНТАРІ • 21

  • @matthewreid1543
    @matthewreid1543 5 місяців тому

    Fantastic video. Very clear and accurate.
    ❤❤❤

  • @tau.thebula7841
    @tau.thebula7841 3 роки тому +2

    wow! clean & clea video tnx from S.A

  • @niconine268
    @niconine268 8 місяців тому

    Thanks for the info. Great video

  • @Alimontari
    @Alimontari 4 роки тому +1

    Awesome video bro

  • @vusijiya4043
    @vusijiya4043 4 роки тому +1

    Great video!!!

  • @GrantCannon1982
    @GrantCannon1982 4 роки тому +1

    Great video

  • @khuvistrength
    @khuvistrength Рік тому

    The prv is situated outside the tray. The hot outlet does not come up and over the geyser, the vacuum breaker is outside the tray.

  • @georgewepener8860
    @georgewepener8860 3 роки тому +1

    First good video I've found! Thanks!
    Is this up to date for all current regulations?

  • @elliotronald1884
    @elliotronald1884 19 днів тому

    The Prv needs to be at least 100mm above the geyser the next person to go for maintenance on the Prv will have to drain that whole geyser because of syphon more over the Prv is outside of the tray

  • @trevorelgram846
    @trevorelgram846 6 місяців тому

    Best video ive seen so far ao easy to understand should i use copper piping or poly pipe as this is cheaper let me know thanks Trev

  • @aurethlouw8274
    @aurethlouw8274 2 роки тому

    When the thermostat is connected, is it necessary to turn it of and then set it to the required temperature? Just to make sure it switch on!

  • @stacyjoost5374
    @stacyjoost5374 4 роки тому

    shouldnt the hot water vacuum breaker be over the tray?

  • @ericscaillet2232
    @ericscaillet2232 4 роки тому +1

    Can this geyser be installed vertical?

  • @gajimafeet
    @gajimafeet 10 місяців тому

    thank you do you also have solar geyser install

  • @JaceJhb
    @JaceJhb 4 роки тому

    I noticed no mention of R1 lagging, which is required by IOPSA?

    • @hbotes5646
      @hbotes5646 4 роки тому

      The eletrical housing cover on the geyser has come lose and hot water is spraying from it (not alot). Is the geyser done or worth a fix

  • @kencorlett9323
    @kencorlett9323 4 роки тому +1

    👍👍👍👍👍👍

  • @hbotes5646
    @hbotes5646 4 роки тому

    The eletrical housing cover on the geyser has come lose and hot water is spaying from it (not alot). Is the geyser done or worth a fix

  • @sandisonkosi1934
    @sandisonkosi1934 6 місяців тому

    2:50 is that pipe left open or where does it go thereafter?

  • @AlnT100
    @AlnT100 3 роки тому +1

    Solar direct flap panel?