Thanks. What gets me on this style of step is you really have to watch your step the whole way. I rather have steps in sets of normally sized treads with longer sections of flat walkway. My sister has. Front walk like this layout, and I think it’s a hazard.
Very nice work and also very patient with your employees that is really nice of you…😊
You're amazing.☺️👍
Thanks. What gets me on this style of step is you really have to watch your step the whole way. I rather have steps in sets of normally sized treads with longer sections of flat walkway. My sister has. Front walk like this layout, and I think it’s a hazard.
Westcoast custom concrete would be proud
And pissing themselves laughing
Can you use 2x6 instead of 2x4 for a deeper floating look or would that be too much of a pain to get out after pouring
Who sells your handheld texture rollers? Great job BTW
Bad ass. I found me a new channel to learn some new tips n tricks m set ups.
I wanted to learn how to form them but probably another post will do. Also why not resurface the face of the very front steps?
If u used able flex on top n bottom of the 4x2 under the lip they should come out easier
Neat!
I have to tell my guys not to sink their screws on every job
Sounds like concrete with the hauses