2.9k views but 158 likes. I don't understand the laziness of people to give a single like. There are few people who are sharing their experience free of cost. Lots of people who have no money or good trainers or have no time to attend classes like this. Ahmed sir is uploading exactly what is required at the site. After watching his video any person can clear any interview I know that. These are very helpful to work in any MEP Services. World is full of selfish people but we have to encourage good people work with our likes & subscribe.
That’s fine subscribed you but please make one detailed course on the fire fighting system designed and foam design safety as well with very breath and depth because most of the people throughly familiar with over view information, if we are spending 10 minutes to watch a lecture hence at the same time we can spend 20 minutes as well which will provided us detailed information.
For-example of you discussed how made Co2 fire extinguishers would be good which will be more detailed and more technical everyone would prefer to spend additional ten minutes to understand technology.
Sir please upload a video on tender work(stages from participation in tender to getting job), statutory approvals in MEP services(how many statutory approval,when to apply,where to apply,how to apply)
@@TanweerAhmed ok Sir, JB hum plumbing ke demand banaty hain to us ke hum fitting Nos sa count karty hain ya L/s % k ehsab sa laty hain etc koi b pipes ho. Waste, vent or water supply .
Great work sir, I appreciate your contribution to MEP fraternity. I need your advise on measurement of pipe length, as mentioned in rate analysis we have considered 1 m pipe and 0.15 m length for fittings so we are paying 1.15 m for every 1m pipe. I need your advice that while taking site measurements should we omit the length of fittings and measure only pipe length as the rate of fittings is already covered in 1m length of pipe? Thanks and regards, VM
Pipe measurement payment shall be included with fittings and during measuring pipe+fittings will be added because fittings install too many, joints more, time consuming and expensive therefore 15% factor included with pipe
Transportation most of the time providing by vendor with ensured quality received material without any damages incase of any damages occurs vendors is responsible to hearing the charges or replaced with correct product.
Labour cost would be considered by the contractor and material provides by client that is actually Varies from project to project and terms conditions.
2.9k views but 158 likes. I don't understand the laziness of people to give a single like. There are few people who are sharing their experience free of cost. Lots of people who have no money or good trainers or have no time to attend classes like this. Ahmed sir is uploading exactly what is required at the site. After watching his video any person can clear any interview I know that. These are very helpful to work in any MEP Services. World is full of selfish people but we have to encourage good people work with our likes & subscribe.
Thanks a lot 😊
Great Sir.👌
I learned many things from you.
Big fan of you..... 🙏
Love from India 🇮🇳🇮🇳🇮🇳
Welcome
Very nice dear very informative
Thanks
Very Good Explanation Sir, Thank you
JazakaAllah
Sir, please keep posting.
Okay noted
Assalamualaikum bhaijaan thank you for explaining ❤️❤️❤️🙏🙏 Jai Hind 🇮🇳
وعلیکم سلام ۔۔۔۔ جزاک اللہ خیراً
Big fan sir🇧🇩
Thank a lot
👍👍👍👍👍👍👍👍 nice
Thanks
That’s fine subscribed you but please make one detailed course on the fire fighting system designed and foam design safety as well with very breath and depth because most of the people throughly familiar with over view information, if we are spending 10 minutes to watch a lecture hence at the same time we can spend 20 minutes as well which will provided us detailed information.
I will try my best as per my knowledge which is sharing time by time
V greattttt fan ho geyaa
Thanks
For-example of you discussed how made Co2 fire extinguishers would be good which will be more detailed and more technical everyone would prefer to spend additional ten minutes to understand technology.
I am trying and upload in future
A/s Round duct waste collection pipe ka bhi video banaye jo textile mill me blow card me use hota hai
Okay noted
Excellent video sir
Thank you
Namskar, Bhai bidding ke baare me ek full vidio banate, starting se lekar final biding tak step by step
Ok noted
Good
Thanks
Sir ap se request ki te duct insulation thickness pe vedio Bana ye g
I have noted your request and work in progress.😊
6" , 4" pipe how you differenciate labour cost by dia inch welding?
Sorry I don't explain about cost
Sir please upload a video on tender work(stages from participation in tender to getting job), statutory approvals in MEP services(how many statutory approval,when to apply,where to apply,how to apply)
Ok noted
Thank you
Welcome
Sir AP ke videos bhot he clear hoti hain, Thanks, Sir Ap kha sa hain or Hum AP sa directly contact kr sakty hain kia...?
Yes right
@TanweerAhmed Sir how we can directly cont with you...?
@Anaskhan-cp8ve You can any questions in comments of my videos. I will reply you.
@@TanweerAhmed ok Sir, JB hum plumbing ke demand banaty hain to us ke hum fitting Nos sa count karty hain ya L/s % k ehsab sa laty hain etc koi b pipes ho. Waste, vent or water supply .
We take lump sump on % base.
Great work sir, I appreciate your contribution to MEP fraternity. I need your advise on measurement of pipe length, as mentioned in rate analysis we have considered 1 m pipe and 0.15 m length for fittings so we are paying 1.15 m for every 1m pipe. I need your advice that while taking site measurements should we omit the length of fittings and measure only pipe length as the rate of fittings is already covered in 1m length of pipe?
Thanks and regards, VM
Pipe measurement payment shall be included with fittings and during measuring pipe+fittings will be added because fittings install too many, joints more, time consuming and expensive therefore 15% factor included with pipe
Thanks Sir
Welcome
Transportation most of the time providing by vendor with ensured quality received material without any damages incase of any damages occurs vendors is responsible to hearing the charges or replaced with correct product.
Yes
Love u sirr
Welcome ❤️
Labour cost would be considered by the contractor and material provides by client that is actually Varies from project to project and terms conditions.
Yes
Bhaiya material quantities kya hote kisa nikalte site engineer HVAC mein zara uski video banao bhot badi help hoti ji
Ok noted, I will prepare video on it, InshaAllah
Shukriya ji kaisa bhi jaldi banaye bhot help hoti
Love from Kashmir
Thank you
Valves ka bhi bataiye sir
Ok noted
Sir kiya diploma houlder yeh job kr sukta hai kia?
Yes
Could You please Send the BOQ sheet link in comment section.
Ok I will share later
I have placed BOQ link in this video description. You can now download
@@TanweerAhmed Thank You Sir
Welcome
Fresher in mechanical diploma ke liye batye
Learn skills in practical works, where you are interested in work and continue learning with burning desires and finally you will get which you want
@@TanweerAhmed skills like as a ...
Can you tell me which is your favourite skill in diploma?
@@TanweerAhmed nothing special like that
However, you can learn following
1. AutoCAD (soft skill)
2. Rivet (soft skill)
3. Quantity surveyor
4. HVAC supervisor
5. Plumbing supervisor
6. Fire fighting Supervisor
7. Foreman of workshop
8. Mechanical maintenance
9. Machine design
10. Construction work incharge
11. Design assistant, etc.....
Nice sir 🇮🇳🇮🇳
Thank you
Great sir 👌
Thanks
I am from Bharat
Good
👍👍
Thanks
@@TanweerAhmed sir can you do a video on fire fighting pump flow test? A detailed video? 🙏🙏
Ok noted, I will work on this
@@TanweerAhmed thanks
I hope you put a english translation.
Ok noted
15% kese aya
It is not a hard and fixed rule. It depends on your experience
@@TanweerAhmed sir I am newly join costing engineer so I face many problem