Woodward EasyGen Initial Commissioning Step 2

Поділитися
Вставка
  • Опубліковано 17 жов 2024
  • One of the initial commissioning steps while starting up a Woodward EasyGen project. Load Sharing and Var Sharing Enable and menu's.

КОМЕНТАРІ • 7

  • @rfgamer67
    @rfgamer67 3 роки тому

    i am installed 2 LSG 1 for active power and 1 for reactive power
    but when check the sequencing screen reactive power lsg is showing LSG and active power LSG have stop sing

  • @rfgamer67
    @rfgamer67 3 роки тому

    hi dear can you tell me how to config the load share gatway (LSG) with easygeb2500

  • @zeusbreaker
    @zeusbreaker 7 років тому

    wich generator is controling that easygen? I mean does proportional values at the voltage and frequency controls are way to high. I have worked with easygen almost 10 year with all kind of engines (gas, diesel and crude oil) and I havent seen those values, but if it is working it must be ok

    • @drvon81
      @drvon81  7 років тому

      zeusbreaker this was a strange job where we were syncing only through a 2301D and the 2301D was doing the load sharing. This was on a 550KW Waukesha Natural Gas genset.

    • @zeusbreaker
      @zeusbreaker 7 років тому

      I was thinking about that possibility. some configuration are strange and it depends how it was concieved at the engineering design

    • @drvon81
      @drvon81  7 років тому

      You need a 2301D to control a mechanical governor. Also it was a retrofit and the 2301D was already on site.

  • @premnarayanpandey337
    @premnarayanpandey337 Рік тому

    Engine working pairamitar