  • The contractor building DreamWorks, a 1.5-acre water park at the American Dream Meadowlands Center in NJ needed to attach pool area decorations and lighting, and paint under the 140’ roof.
    The construction was behind schedule and severely over budget, facing a fast-approaching start date for pool excavation with millions of dollars at stake. The JLG and Genie lifts could not reach the necessary heights and fit in the tight spots.
    The client engaged Alpha Platforms with its A-175, a 175’ telescopic boom lift with a side reach of 120’. Its 31’ maneuverable jib boom swiveled the generous 12’ basket to easily access all high and tight spots.
    Alpha staffed two shifts of operators to work for one week, ensuring uninterrupted work in 117-degree heat, saving the client $500,000-$600,000 on scaffolding alone.
    Find out why Alpha Platforms was the only solution suitable to slash project delays and expense.
    Read our Case Study: www.alphaplatforms.com/case-s...