Konkan Railway electrification| E-loco trial run day | The long wait ..

Поділитися
Вставка
  • Опубліковано 30 вер 2024
  • On the second electric locomotive trail that happened 2 weeks, I had to wait for nearly 3 hours in hot son before I could capture the trail run. Series of events that happened on that day and other rail captures are covered in the video..The loco trail took between Thokur and Bijoor (the first phase of KR electrification). The e-locomotive was AJJ WAP-4 22830 and it was coupled to a PUNE WDG-4D 70490 to avoid any risk mid way during the trail.

КОМЕНТАРІ • 102