API 650 STORAGE TANK ERECTION PROCEDURE- PART 2- SHELL ERECTION.
Вставка
- Опубліковано 26 вер 2021
- API 650 storage tank, annular plate, bottom plate fabrication, erection, shell erection, replacement.
Donate paypal.me/Technicalstudies502
explain about storage tank, pressure vessels, piping fabrication, erection, welding, piping isometric,
ndt,welding,cutting,pipe fit-up,fabrication,erection, elbow cutting,elbow center calculation, welding process,valves,
pressure gauge, hydro testing details, welding calculation, pipe supports,equipment,pumps,Trigonometric formula
application, pipe offset calculation, fitter, fabricator training etc. @technicalstudies.
Thanks for the valuable information on building tanks If possible, explain the civil works under the tanks, such as laying the reinforcing steel and pouring the foundations
Bro. I dont have any authenticable knowledge about civil work.
Excellent videos.
Thank you Bro.
Great work
Thank yu
Very informative
Thank you.
Amazing
Video
Thank you.
Amazing
Thank you.
Woww
Thank you.
Well done
Thank you.
Superb 🙏
Thank you.
Nice
Thank you.
what software did you use for drawing ilustration ?
Sketchup.
hopefully if provided with pictures
Next time Bro.
Sir,Please provide Pdf of tank fabrication, erection and construction procedure.
Bro, check my facebook page.
@@technicalstudies. Thank you