Yeah that's true we cant able to see properly, its good that he gave some information for us but let it be small and show it for 15 to 20 seconds. Thank You.
That new track work happening is for suburban line... But catch here is, once one track is laid, existing train operations of SWR will be shifted to new suburban line. Once remaining three track works are finished. Left hand side 2 tracks will be handed over to suburban and right hand side tracks will be handed over to SWR as doubled track
Thank you for this video. It would be helpful if more infra enthusiasts show updates in Bengaluru Suburban Rail Project.
Glad to see this getting shape. Hope to ride on K-Rail this lifetime of mine. Thanks for the video update.
Information on yellow background blocking the view 😊
Yeah that's true we cant able to see properly, its good that he gave some information for us but let it be small and show it for 15 to 20 seconds.
Thank You.
what about whitefeld kengeri line any update???
Will there be a doubling of the SWR line? Or all the space for expansion has been handed out to K-Ride?
That new track work happening is for suburban line...
But catch here is, once one track is laid, existing train operations of SWR will be shifted to new suburban line.
Once remaining three track works are finished.
Left hand side 2 tracks will be handed over to suburban and right hand side tracks will be handed over to SWR as doubled track