Glad you liked it. Track almost completed on mainline all the way around layout on lower level. There are still lots of areas for scenery, yards and structures😀 to be completed.
The lower level mainline track work is complete now. You can run all the way around the layout, not the scenery nor industry/yard tracks though. Thanks for watching.
I'm very intrigued by that helix construction. Could I request a short feature video on its design and construction ? The treaded rod looks interesting
Thanks for the ride-a-long tour. Nice work.
Glad you liked it. Track almost completed on mainline all the way around layout on lower level. There are still lots of areas for scenery, yards and structures😀 to be completed.
Once again you've created an excellent video to highlight the club!
We try, thanks again for checking it out.
Never forget these Changingtimes and The My Bad RR!
Love the view Ralph.
The lower level mainline track work is complete now. You can run all the way around the layout, not the scenery nor industry/yard tracks though. Thanks for watching.
I'm very intrigued by that helix construction. Could I request a short feature video on its design and construction ?
The treaded rod looks interesting
That might be a while if possible? As I will have to consult with the builders of the helix and gather information.
@@ralphjmejia1692 even just some footage focused on the interior of it would be appreciated 👍 👌
Thanks though