Seaway7 Hollandse Kust Zuid Project Film

Поділитися
Вставка
  • Опубліковано 24 лип 2024
  • Seaway7's offshore works commenced in 2021, and in 2022 Seaway7 introduced their evolutionary approach to foundation installation in Dynamic Positioning (DP) mode. Efficiency and output significantly increased as a result and the remaining 106 of the total 139 foundations were installed within a five-month installation campaign. The final cables were laid at the close of January 2023.
  • Наука та технологія

КОМЕНТАРІ • 1