"Fast Pace Expansion West Side Wash & Dispatch" Tesla Gigafactory Texas 6/1/2024 9:00AM

Поділитися
Вставка
  • Опубліковано 31 тра 2024
  • Busy Saturday at the south end expansion most work is inside with some roof work going on. West side as busy as always. Load vehicles and washing them. Model Ys don't get a wash.
    Please Like and Subscribe to this channel. Click the bell for notifications.
    Needed support can be given at this link: www.paypal.com/donate/?hosted...
    #Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #Construction #DumpTrucks, #Scrapers, #Excavators

КОМЕНТАРІ • 42

  • @DigitalSkiesvideos

    Please Like and Subscribe to this channel. Click the bell for notifications.

  • @Oldpopcorn36

    Very nice Brad. I appreciate the true speed views!

  • @DessieDoolan

    Thanks Brad

  • @lourdessilva6442

    Incrível documentário isso sim es trabalhar em prol da preservação da humanidade isso não tem preço nos mostre mas aguardo dos próximos grata por poder assistir sucesso sempre

  • @Backseatobserver0075

    Great work Brad, we need you to step up for next week and fill the missing days.

  • @benguthrie49

    Thanks Brad. nice video

  • @nathanprice4568

    306 CTs

  • @garyhenderson8178

    Great video!!

  • @michaeljohnson1805

    Thanks Brad

  • @mrjay8489

    Thanks for the flight Brad. Any bets the tunnel comes up inside the building

  • @andreandre1051

    Merci👍👍👍

  • @michaelkurtz1967

    Brad please lower your music volume.. Nice video

  • @markkennard861

    Mental big.. where does all the $ come from because there's no demand for Tesla vehicles.. lol.

  • @bigtvjunky9119

    Can we agree that they're power washing the Cybertrucks to remove road and production debris? If there was a problem with water leaks, they wouldn't be testing for it by blasting water into brand new $100k trucks. They also would've fixed the problem on the production line by now. I assume they're adding the baghouse dust collection system to casting because fine metal dust was getting into other parts of the factory.

  • @davidsalisbury50

    50-55m (180') of tunnel added since 24 May. Predicted as 245-250m (800') excavated at that time. Looking like approximately 300m (975')of tunnel built so far. Only 26 or so rings worth of segment remaining, No more than 40m (130')of tunnel left.

  • @DavidJohnson-tv2nn

    South expansion:

  • @itop1331

    This isn't a pathetic Apple with a sack of money sitting in its circular barn.

  • @joblo341

    I see the drainage/flood ponds. I'm really surprised that they are not using "permiable" pavement. It allows water to drain through the pavement into the ground below. Reduces drainage/flooding problems and recharges the aquifer/water table.

  • @BusterNoggins
    @BusterNoggins 21 день тому

    Giane Factory making vehicles no one wants to buy.