Це відео не доступне.
Перепрошуємо.

Building Our Dream Backyard Chicken Coop

Поділитися
Вставка
  • Опубліковано 13 сер 2024
  • MATERIAL LIST
    1 - 4x4x10’ Pressure Treated
    2 - 4x4x8’ Pressure Treated
    2 - 2x4x12’ Pressure Treated
    4 - 2x4x8’ Pressure Treated
    4 - 2x4x12’ Construction Pine
    68 - 2x4x8’ Construction Pine
    2 - 4x8x1/2” plywood
    5 - 4x8 t1-11 Plywood siding
    2 - 1x2x6’ Construction Pine
    5 - 1x3x8’ construction pine
    7 - 1x4x12’ Construction Pine
    1 - 12” x 18” shed window LINK- amzn.to/4cvC5S4
    2 - 18” x 23” shed window LINK- amzn.to/3RWHyJC
    1 - solar automatic coop door LINK- amzn.to/3zBpXAq
    2.5” nails
    3” exterior screws
    1.5” exterior screws
    Metal roofing
    2 - rolls of 4’x50’ hardware cloth LINK-
    7 - strap hinges
    3 - Leaf hinges
    4 - door pulls
    2 - barrel style door latches
    1 - hook style latch
    Basic structure cut list
    (Rear posts) 2 - PT 4x4 @ 48 1/8” L
    (Front posts) 2 - PT 4x4 @ 95” L
    (Side floor joists) 4 - 2x4 @ 53” L
    (Bottom plate) 2 - PT 2x4 @ 56 3/4” L
    (Floor support) 4 - 2x4 @ 20” L
    (Front/back floor joists) 2 - 2x4 @ 62 1/4” L
    (Floor joists) 2 - 2x4 @ 57” L
    Add 1/2” plywood floor
    *All posts and bottom plates are Pressure treated and cut at 15 degree angles at the top
    *The side floor joists are doubled up 2x4s (2 on each side of the coop
    *floor supports are cut at a 45 degree angle
    *bottom of the floor joists 2x4 should be 28” up from the ground
    Front wall Cut List (wall with the chicken door and ramp into the run)
    (Top/Bottom plates) 2 - 2x4 @ 62 1/4” L
    (Wall studs) 4 - 2x4 @ 60” L
    *top plate tilts at a 15 degree angle and the wall studs need to be cut at a 15 degree angle on the upper end with the measurement above being the longest point.
    RIGHT SIDE WALL CUT LIST
    (Bottom plate) 1- 2x4 @ 53” L
    Wall stud 1 - 2x4 @ 47 1/2” L *
    Wall stud 1 - 2x4 @ 53” L *
    Wall stud 1 - 2x4 @ 59” L *
    Top Plate 1 - 2x4 @ 46 7/16” L **
    *15 degree cut at one end
    ** 15 degree cut at both ends
    LEFT SIDE WALL CUT LIST (wall with double barn doors)
    Top plate 1 - 2x4 @ 46 7/16” L **
    Wall stud 1 - 2x4 @ 49” L *
    Wall stud 1 - 2x4 @ 31 3/4” L
    Wall stud 1 - 2x4 @ 28 3/4” L *
    Header 1 - 2x4 @ 41 1/2” L
    Wall stud 1 - 2x4 @ 19” L *
    Wall stud 1 - 2x4 @ 24 5/8” L *
    *15 degree cut at one end
    ** 15 degree cut at both ends
    The opening for the doors should be 41 1/2” Wide
    REAR WALL CUT LIST (WITH 2 WINDOWS)
    Top/middle/bottom plates 3 - 2x4 @ 62 1/4” Long **
    Wall stud 4 - 2x4 @ 19 5/8” L
    Wall stud 4 - 2x4 @ 27” L *
    Window headers 2 - 2x4 @ 18 1/2” L
    *15 degree cut on one end
    ** 15 degree cut along the long edge of top plate only
    Window openings should be 18 1/2” W x 23” H
    NESTING BOX CUT LIST
    Side top plate 2 - 2x4 @ 9 1/4” L **
    top plate 2 - 2x4 @ 62 1/4” L ***
    Right side Wall stud 1 - 2x4 @ 16 7/8” L *
    Right side Wall stud 1 - 2x4 @ 15” L *
    Left side Wall stud 1 - 2x4 @ 15 3/8” L *
    Left side Wall stud 1 - 2x4 @ 13 1/2” L *
    Front wall studs 4 - 2x4 @ 14 5/8” L *
    *15 degree cut on one end
    **15 degree cut on both ends
    ***15 degree cut along the long edges
    Each nesting box opening should be 11 1/4” W
    COOP INTERIOR CUT LIST
    Nesting box dividers 4 - 1/2” plywood @ 13 5/8”x12”
    Poop board Cleat 1 - 1 1/2” x 1” x 43 1/2” L
    Poop board Cleat 1 - 1 1/2” x 1” x 65 3/4” L
    Roosting bar cleat 4 - 3 1/2” x 6” L
    Top Roosting bar 1 - 1 1/2” x 43 1/4” L
    Bottom roosting bar 1 - 1 1/2” x 71 1/8” L
    Poop board 1 - 1/2” plywood 36” x 55” (the 36” side tapers down to 12”)
    Poop board support 1 - 2x4 @ 17 1/2” L
    Poop board edge 1 - 3/4” x3/4” x 55 3/4” L
    Poop board edge 1 - 3/4” x 3/4” x 35 7/16” L
    Poop board edge 1 - 3/4” x 1 1/2” x 61” L
    Then fill the space between the poop board and siding with leftover 1/2” plywood
    Poop board should be 17 1/2” high to be able to get a 5 gallon bucket under the end for easy clean up
    MAIN COOP ROOF CUT LIST
    Side rafter 4 - 2x4 @ 80” L (2x4s doubled up on each side)
    Horizontal rafter 5 - 2x4 @ 67 1/2” L
    Vertical rafter (high side of roof) 2 - 2x4 @ 16 1/4” L
    Vertical rafter (low side of roof) 2 - 2x4 @ 12 1/2” L
    *Metal roofing should overhang 2” on the front and back and 1” on the sides
    COOP RUN WALL CUT LIST (side with door)
    Bottom plate 1 - PT 2x4 @ 142 5/8” L
    Top plate 1 - 2x4 @ 144” L
    Studs - all 2x4 (1 at each length) 68 3/8” , 88” , 82 7/8” , 78” , 73 1/4”
    *Angled braces at the top of the wall in each opening
    *top of wall studs are all cut at 15 degree angles
    OPPOSITE SIDE COOP RUN WALL
    Bottom plate 1 - PT 2x4 @ 142 5/8” L
    Top plate 1 - 2x4 @ 144” L
    Studs - all 2x4 (1 at each length) 73 1/8”, 68 3/8” , 83” , 88” , 78”
    *angled braces at the top of the wall in each opening
    ** top of wall studs are all cut at 15 degree angles
    COOP RUN FRONT WALL CUT LIST
    Bottom plate 1 -PT 2x4 @ 87” L
    Top plate 1 - 2x4 @ 87” L
    Wall studs 3 - 2x4 @ 68 3/8” L
    horizontal braces 2 - 2x4 @ 41 1/4” L
    SMALL COOP RUN WALL EXTENDER CUT LIST
    Bottom plate 1 - PT 2x4 @ 20” L
    Top plate 1 - 2x4 @ 20” L
    Wall studs 2 - 2x4 @ 88” L
    Coop run roof structure cut list
    Side rafters 2 - 2x4 @ 144” L
    Horizontal rafters 7 - 2x4 @ 92 1/2” L
    22 1/4” spacing between each

КОМЕНТАРІ • 5

  • @anayanez9659
    @anayanez9659 Місяць тому

    Great job!!! I love it!!!🎉😊

  • @rebeccaboudreau7589
    @rebeccaboudreau7589 Місяць тому

    Thank you! It’s on my to do list now 🥰

  • @mascarobaptist
    @mascarobaptist Місяць тому +1

    look cool, but wood directly on the soil... You are not afraid about humidity ?

    • @sasserhouse
      @sasserhouse  29 днів тому

      All of the boards that touch the ground are pressure treated wood so they should last for years before rotting

  • @user-ic3vv5nv5u
    @user-ic3vv5nv5u Місяць тому

    You can build a house 😅