200 Amp Service Upgrade

Поділитися
Вставка
  • Опубліковано 17 жов 2024

КОМЕНТАРІ • 85

  • @electricianron_New_Jersey
    @electricianron_New_Jersey 2 роки тому +15

    Great work brother! You killed it here. I love being an electrician and doing 200A upgrades too but we do them differently here in NJ. It still cracks me up that the distribution panels are on the outside of the house. One bit of advice is to stand facing away from the panel when you energize the main breaker and the branch circuit circuit breakers because you never know when an arc might occur and that shit would fck you up good.

  • @evandennard773
    @evandennard773 2 роки тому +7

    AWESOME JOB!!! WE ALL FEEL YOUR "POST-INSPECTOR" THUMBS UP! GREAT WORK, CLEAN, AND PROFESSIONAL!!! ID GIVE YOU A RAISE!

  • @dubbys
    @dubbys Рік тому +2

    I do what you do. It's tough sometimes. Props on the inspectors help. I've never had that. Keep it up Brother. Nice work.

  • @DanielGonzalez-os1kl
    @DanielGonzalez-os1kl 6 місяців тому

    Great work! In this case if Edison didn’t come on time, can you hook up yourself and they later make their own splice?
    Same thing for disconnecting? Thanks

  • @Juantorres-xc3ko
    @Juantorres-xc3ko 2 роки тому +3

    Good clean work man 👍🏼

  • @kolamango6097
    @kolamango6097 8 місяців тому

    Great work how did you unhook that power line though it will shock ??

  • @paaao
    @paaao 8 днів тому

    Only recommendation I have for you is to invest in a few pairs of safety glasses. Especially if you love your job. Blind guys don't make for good electricians.
    Old guy I know clipped a stranded #10 wire to smooth it out before landing it, and just dumb luck, a handful of those little copper clippings flew right into his eyes. He almost lost his ability to see. Doctor managed to get everything out after two separate procedures and 6 months of no work. 2 to 3 weeks of no vision in one eye.
    Good luck out there. Stay safe, stay alive!

  • @willpartin622
    @willpartin622 Рік тому +1

    A great video! I've been asking this all over the web.
    HELP! I'm replacing an old Federal Pacific 100-amp panel with a 200-amp Square D Hameline panel, so I will need to upgrade the service entrance cable and want to use 2/0 THHN copper.
    The outdoor meter can/box is mounted low, (30" off the ground at bottom edge of can) outside, so if I use the bottom rear 2-inch knockout of the meter can, it will put the hole through the wall below the bottom edge of the new breaker panel by about 8 inches, so I will have to make a vertical 90 upwards turn from hole in wall to bottom knockout of the new panel. I cannot find a 2" close 90 PVC electrical fitting so I'm guessing they don't make one.
    My question is: how do I make that vertical 90 turn upwards? It will eventually be covered in drywall. Do I need to have the inside copper leads in conduit at all? If I use switch to 4/0 aluminum, do I need conduit inside the wall cavity? thanks in advance!.

    • @matthewellis3004
      @matthewellis3004 9 місяців тому

      new 200 amp panel is being mounted on interior if I'm understanding correctly.. for that 90, I would think you can use an LB

  • @OscarBenitez-n3v
    @OscarBenitez-n3v Місяць тому

    What did you use in the mc ground rod? and what size wire did you use to the main breakder? looks like edison used way smaller wire.

  • @FernandoLopez-vo7ky
    @FernandoLopez-vo7ky 2 роки тому +1

    All respects to electrician and my dad he’s an electrician but I wanted to say it takes balls to cut live wire while it’s on and that’s what my dad does respects👌🏾👍🏽

  • @sp3165
    @sp3165 Рік тому +1

    Do you have a flush panel ag your house? Semi flush is the way to go. That will be a fun job when someone decides to upgrade the wires that go thru two boxes. Or yes i know you can just run conduit on the exterior. Be safe out there broskie

  • @adolfoestrada8991
    @adolfoestrada8991 2 роки тому +2

    Wow. Great job my dude.

  • @im1-z2x
    @im1-z2x 10 місяців тому

    This video is super dope 🔥🔥🇺🇸 keep it up bro

  • @williamstewart7598
    @williamstewart7598 2 роки тому +1

    Hey I’m from Florida and my question is… your grounding wire is just sleeved in the metal flex right?

    • @R900DZ
      @R900DZ Рік тому

      Correct

    • @r8rmartin
      @r8rmartin  Рік тому

      Yes it’s a #4 armored ground

  • @PragneshPatel-kc9du
    @PragneshPatel-kc9du Рік тому

    Thanks for the video. what is Christmas tree term for electricians?

  • @solargod3671
    @solargod3671 Рік тому +1

    Great video bro and work . Keep it up .

  • @renep.l.1580
    @renep.l.1580 2 роки тому +1

    You should explain every step...
    What city and state you in?

  • @precant9756
    @precant9756 Рік тому +1

    Do you work in California if so what county? I had three electricians say they'll take the job to upgrade, I excepted their offers and it's been a year when I started taking offers and they haven't communicated on when they'll be here. Any advice?

  • @DAT-TEXAS-DUDE
    @DAT-TEXAS-DUDE 5 місяців тому

    How much would it cost to have that pipe that is extended throught the roof ? I need that done to my home

  • @RR-vf2bd
    @RR-vf2bd Рік тому

    Great video! Professional installation. How much is project cost?

  • @ChemysteryKids
    @ChemysteryKids Рік тому +2

    Hi I’m looking to setup a 200 amp panel 100 ft away (above ground, through the attic) I’m wondering which phase sub panel I need for that? Running 4-5 20 amp 110v lines and 2x 20-30 amp 220v lines. Also I’m wondering if this cable will be the correct cable for me to run box to box?:
    4/0-4/0-4/0-4/0 Appaloosa Quadruplex Overhead Aluminum Conductor

  • @MexDurango11
    @MexDurango11 8 місяців тому

    how much do you charge for something like this?

  • @Karl-by6ub
    @Karl-by6ub Рік тому +2

    Nice work 👍🏻

  • @juliandominguez7853
    @juliandominguez7853 Рік тому

    Nice job. question how long does it take to get a permit to do a job like this in California.

    • @Nicetrybrobro
      @Nicetrybrobro Рік тому

      Permit is usually instant online, and post-work inspection takes 1-2 weeks. Getting power company out to fix connections takes >1 month. Most electricians do the main line detachment and reattachment themselves

  • @martinserena9314
    @martinserena9314 2 роки тому

    I often see videos of all of the house wires passing through one large knockout in the back of the panel. I installed a panel where the breakers are in a bottom section rather than side-by-side, and I separated the cables into different knockouts. Do you get any feedback from inspectors on grouping all of the wires together?

    • @dtnineninety9406
      @dtnineninety9406 Рік тому

      I kinda want to know too. What he did was pretty ghetto but I guess the inspector allows it.

    • @karlhicks2557
      @karlhicks2557 28 днів тому

      I'm curious how that complies with 312.5 (C) NEC with the bundled NM cable in a 2" knock out. If the inspector is cool with it, so am I.

  • @victorserna9039
    @victorserna9039 Рік тому +1

    Good job.

  • @CarlosOrtiz-kg4vg
    @CarlosOrtiz-kg4vg Рік тому +1

    Never seen bx used for grounding a service before working for Com Ed in Chicago.

  • @johndavies2949
    @johndavies2949 8 місяців тому +1

    MC sheath is not recognized as an approved grounding electrode conductor. Are you guys licensed?

    • @tomnorman5461
      @tomnorman5461 6 місяців тому

      I was wondering about that myself...never seen that done before!

    • @alexrenteria289
      @alexrenteria289 6 місяців тому

      Most likely a 6 bare ground wire inside that

    • @dakotacallison9445
      @dakotacallison9445 2 місяці тому +1

      @@alexrenteria289it’s a #4 bare copper inside

  • @ranchoelbamboo4068
    @ranchoelbamboo4068 11 місяців тому

    What areas do you cover ?

  • @sanchezvh
    @sanchezvh Рік тому

    What size of wire you used for the riser?

  • @R900DZ
    @R900DZ Рік тому

    What are the big wires at the bottom for? They look capped off?

    • @r8rmartin
      @r8rmartin  Рік тому

      They’re not in use they went to an old shed

  • @drake.junior28
    @drake.junior28 2 роки тому +1

    Do you know how to disconnect and connect the head I always see electricians disconnected it and connect it back on the low ? With out Edison

    • @r8rmartin
      @r8rmartin  2 роки тому +1

      Yeah we’re having to do it ourselves now because Edison is so busy. They gave us the ok to do it.

    • @drake.junior28
      @drake.junior28 2 роки тому +1

      @@r8rmartin in the future can u plz show a video on how to wire it up thanks boss

  • @jamesreeves1672
    @jamesreeves1672 2 роки тому

    How was wondering what type of wire you used inside of your metal conduit ?Urd?

  • @juanpablomarcelvivancomeri9310
    @juanpablomarcelvivancomeri9310 3 місяці тому

    How much for this work

  • @eliyah.mmuhammad3602
    @eliyah.mmuhammad3602 2 роки тому

    You in los angeles ? I have a friend who needs these fix and I gonna try and do it

  • @TheCompton1963
    @TheCompton1963 2 роки тому

    Great job!! Were any of the old homeruns too short? ⚡️⚡️

    • @r8rmartin
      @r8rmartin  2 роки тому

      Thanks, no not on this one

  • @cavalos1997
    @cavalos1997 Рік тому

    Est cost for something like this ? Thank you

  • @joseolivia8852
    @joseolivia8852 2 роки тому +1

    Are u located in Socal enterested in getting this done

    • @dubbys
      @dubbys Рік тому

      If you still interested message me.

    • @r8rmartin
      @r8rmartin  Рік тому

      Central Cali bro

  • @FrancisWong
    @FrancisWong 2 роки тому

    Nice work!! Would you consider coming to Oakland, CA to do a very similar job?!

    • @edlopez510ify
      @edlopez510ify Рік тому

      I can help you, I work in that area

    • @zuckerbergcarpenter
      @zuckerbergcarpenter Рік тому

      @@edlopez510ify How much would u charge for a service like this, im in san pablo, ca area

  • @kingofslotsmillion3263
    @kingofslotsmillion3263 Рік тому

    What bit do u use to drive that ground rod

    • @r8rmartin
      @r8rmartin  Рік тому

      That rod fits right into the roto hammer, but they do sell bits for it

  • @AngelPerez-nw5cd
    @AngelPerez-nw5cd Рік тому

    Is that MC cable outside?

    • @r8rmartin
      @r8rmartin  Рік тому

      It’s an armored ground wire

  • @GCSalinas
    @GCSalinas Рік тому

    I’m a apprentice lineman and I’m usually the one doing the disconnect reconnects but I’m interested in making my own company doing mpu

    • @Freddy1-
      @Freddy1- Рік тому +1

      Where are you located. I’m
      An electrician of 15 years mostly commercial I do a lot of residential but never done a a panel upgrade. I’m f you I. The bay I’ll cut you in. If you teach me 🙂

  • @jasonrwilliams2573
    @jasonrwilliams2573 Рік тому

    The riser 2 or 2.5 rigid?

  • @DanielGonzalez-os1kl
    @DanielGonzalez-os1kl 2 роки тому

    Did you call the city to disconnect at the head?

    • @r8rmartin
      @r8rmartin  2 роки тому

      Yes, scheduled with Edison to cut the power and called city to schedule inspection

    • @jbsierra9109
      @jbsierra9109 2 роки тому

      Nunca había visto lo que usaste para ground parece mc que fue eso nuevo para mi en 30 años de servicio (

  • @carloscasi3879
    @carloscasi3879 24 дні тому

    Good clean work no like Armenias

  • @jaimenieto5658
    @jaimenieto5658 2 роки тому

    Where are you located??

  • @johndavies2949
    @johndavies2949 8 місяців тому

    That connection to your ground rod isn't right. It should have been #4 copper, solid bare or stranded insulated. You just clamped to the mc sheath.

    • @M3thodbombz
      @M3thodbombz Місяць тому

      He took a mc cutter to expose the #4 copper and then crimped to that with the ground clamp. You can see it in the video …

  • @Karl-by6ub
    @Karl-by6ub Рік тому

    To bad your not in the Bay area 🤔

  • @simplescents3309
    @simplescents3309 2 роки тому

    Yo si i land the grounding system to the nutral bar

  • @SORGIGERMANICO
    @SORGIGERMANICO Рік тому

    I would have added paint to that plywood just for extra protection from the elements, but that's just me I guess

  • @kanpolero3808
    @kanpolero3808 Рік тому +1

    I see the 4/0 aluminum but the service is smaller

    • @r8rmartin
      @r8rmartin  Рік тому

      Yeah, Utility companies have different standards

  • @saileshp2903
    @saileshp2903 Рік тому

    Nice video... what's you contact number? Do you estimate of SFR in San Fernando Valley?