A Comprehensive Guide to the Pre-Delivery Inspection (PDI) of Your Brand-New Motorcycle!"
Вставка
- Опубліковано 28 лис 2024
- In this detailed video, I am taking you through the crucial steps of performing a thorough Vehicle Pre-Delivery Inspection (VPDI) on your brand-new motorcycle. Whether you're a seasoned rider or a first-time owner, ensuring your bike is in optimal condition is key to a safe and enjoyable riding experience.
PLEASE SUBSCRIBE TO MY CHANNEL AND PRESS THE BELL ICON TO STAY NOTIFIED.
IF YOU ENJOYED WATCHING THE VIDEO THEN LIKE COMMENT AND SHARE THIS VIDEO. THANK YOU!
If my content helped you then please donate to sustain the channel.
UPI: ezmeck@barodampay
FOLLOW ME ON FACEBOOK
/ rajib.sarkar.39
FOLLOW ME ON INSTAGRAM
/ rajib_shoots_raw
Intro Track Credits:
Josef Suk, Serenade, Op 6
Summary on all the PDI Checks:
1. Colour Marking,
2. Rusting (Check all the Metal Parts)
3. Check the Engine Oil Level (Lubricants), If Liquid Cool - Coolent Level
4. Scratch Free - Headlights, Oil Tank,
5. Test Ride to check the Sitting Posture and Engine Malfunctioning
6. Date mentioned on the Chassis and on the Engine. (When the bike was produced)
7. Date on the Tyres to check the manufacturing date of the Tyre.
@@skpmunia how old can it be?
Most importantly, do not make full payment before before doing pdi. I made a huge mistake and made full payment before pdi. Thankfully, the bike was not registered before doing pdi, and I observed a few scratches at few places, one was a major one. I refused to take that vehicle and requested for another one. I had to literally fight to get another bike.
without making full payment, they will never allow PDI
@@MineITINERARY Any comments on this?
They have to, if they don't they're probably cheating you, cancel booking and choose a different dealer
i think u bought splendour bcoz
every showroom told me payment first then they will start process
@imyours777 I also made full payment before allotment but I had requested them to allow me to do the PDI before sending it for insurance and RTO work, but they didn't obliged. And because of this only I'm saying to not make complete payment before doing PDI.
Very useful. I arranged the insurance, so the dealer provided the year and month of manufacture along with chassis and engine number. Tyres have the month and year printed too, as new tyres in godowns age as is the nature of rubber to do so. Once you have paid the balance amount, little else you can do.
Glad to hear that
Booked a new cb300f 2 weeks ago and this video will be very helpful during the delivery
Cool
One of the best pdi video ever, good job
Thanks!
Thanks brother...what u said it's really true
Good information ...
Nice explanation bro, love frm ODISHA, Air Tiger
Thanks! See you in battleground
Thanks
Date of production should be how many months before delivery? 6 months is good to go?
The bike is in the warehouse and doing PDI before making payment doesn't work in most places
Even if they do let you do PDI the bike will be in stock condition without any electrical connections so starting the bike and checking for engine is out of question
We can definitely look for physical damage before the payment but they won't ON the engine or put petrol before the delivery so riding the bike before delivery is not possible in most of the showrooms
Just make your points clear to them, if you don't allow me to take a ride I won't buy. End of story. Remember they won't lose out on customers just for a couple of km rides.
Bro i am purchased pulsar N250 3 days agoy bike going left side when you remove hands from handle bar please help
Why are you even trying to remove both hands while riding it? Local roads are not perfect, there are undulations, there might be tyre pressure differences, and so many factors that can cause it. If it's not dragging to a side while riding with both hands on the bar. Nothing to worry about.
Sir All the new bike tyre have colour line??...
Yes, it's a mandate from all tyre manufacturers
@@EzMeck at the time of PDI tyre colour line shown but not very bright...what to do in this occasion??
No need to worry. If it's there it means you are good to go.
@@EzMeck bro... I havent seen the lines.. In the bike, but the nodules on the tyres are look freshh,,, is it ok?
Hi Brother,
Could you please tell me, is the pillion seat comfortable for ladies? Thank you.
It's on the harder side. Not very comfortable. Its good for approximately 100km, any longer journey will require a modded seat of air seat.
@@EzMeck Thank you for the reply
Is it good choice to buy Honda dio mfg 2023 in Mar 2024?
Dealer mentioned a 6k discount for 2023 where as a 3k discount on 2024 manufacturing.
I agreed for 2023 model and taking delivery tomorrow morning.
IDK what i decided was right or wrong, i was only focused on 6k discount. 😢
Nice info ❤
Does every bike has mfg date? If so, how to locate and understand?
Most of them come with mfg date. Location you have to find out yourself.
Broo, I got my first service done after 45 days for cb300f. Will it void warranty?
If not registered within 30 days. Yes.
Sir,is it possible to make PDI the day before taking the delivery of the bike.Pls reply
Yes you can talk to the showroom for the same. But I suggest to do the pdi again before taking the delivery. Because lots of things can change in a night. You know what I mean. All the best!
👍👍👍 Thanks for the reply 😌😌😌
dada ki camera use koro for UA-cam onek professional look ase..big fan dada❤❤
Thanks 🙏. Canon 200D.
@@EzMeck Awesome Quality ❤️
Sir how much time a bike can Be in Dealers showroom??
Until it's discontinued.
Hindi me bol lo na