PERT - Programme Evaluation and Review Techniques - Lecture 8 in Network Analysis

Поділитися
Вставка
  • Опубліковано 29 гру 2024

КОМЕНТАРІ • 8

  • @gvvivekanandh2408
    @gvvivekanandh2408 9 місяців тому +1

    Well explained Madam. Thank you

  • @sagargarud9422
    @sagargarud9422 Рік тому +2

    why did you add 0.50 in the table value of Z while calculating project completion probability at the end of this video?

    • @financebyratika
      @financebyratika  Рік тому +2

      Note, z can be positive (when the time given is more than the average time) and can be negative (when the time given is less than the average time), but the probability or area will always be positive (minimum 0, maximum 1)
      If the z value is positive, add 0.5 to the table value (obtained from z table with areas given from the centerline) to calculate probability and in case z value is negative, subtract the table value to calculate probabilities. so here your z is positive as critical path duration is 29 and in question your project completion time is 30 weeks.

  • @MdJoynal-m5o
    @MdJoynal-m5o Місяць тому

    How u table form add 0.159?

  • @angelmukhiya6087
    @angelmukhiya6087 6 місяців тому

    Thanks alot

  • @vishnukumawat841
    @vishnukumawat841 6 місяців тому

    When my value of z = -1 so what will be my answer

  • @shreyadubey3137
    @shreyadubey3137 9 місяців тому

    Mam university exam me z table nhi diya hoga to kaise krenge ?

  • @adventureculture
    @adventureculture 11 місяців тому

    thank you maaam