How To Grade Pipeline Ditch

Поділитися
Вставка
  • Опубліковано 22 бер 2024
  • Tips and tricks on how to dig pipeline ditch. Tips on grading, healing ditch bottom, over bends and sags.
    #excavator
    #ditching
    #pipeliner
    #digging
    #trench
    #owneroperator
    #grading
    #johndeere290
    #trackhoe

КОМЕНТАРІ • 15

  • @mattbrown7249
    @mattbrown7249 4 місяці тому +1

    Great video!

  • @DIRT-BOSS
    @DIRT-BOSS 4 місяці тому +2

    Nice Tip with the H link 💪

  • @efficientexcavations
    @efficientexcavations  4 місяці тому +2

    Correction -40 is the same in Celsius and Fahrenheit

  • @montylane2033
    @montylane2033 3 місяці тому +1

    Best tip yet!

    • @efficientexcavations
      @efficientexcavations  3 місяці тому +1

      Thanks buddy! Was a pleasure working with you the past couple months 🍻

    • @montylane2033
      @montylane2033 3 місяці тому

      Hell yah! Pleasure working with you to

  • @TheENLIGHT3NED
    @TheENLIGHT3NED 2 місяці тому

    Also in Alberta Can. I’m in an Operator course to get certified on, excavator, dozer, articulated rock truck, and skid steer. Do you have any tips or prerequisites for someone looking to get in this line of work?

  • @svelements
    @svelements 4 місяці тому +1

    Just to be clear, you're digging to the bottom three holes of the thumb for grade at 90°, then using the H bar pins reached out on the clean-up pass?

    • @efficientexcavations
      @efficientexcavations  4 місяці тому

      Yup, at 90 degrees I know I got my depth. Then you can use the H bar to find that sweet spot where you’re not cutting nor healing too much that you’re not getting a grade cutting scoop

  • @rubberduck8007
    @rubberduck8007 4 місяці тому +2

    Do you prefer to dig with teeth or flat bottom? I was always told you can't cut with a fork so I always flat bottom.

    • @efficientexcavations
      @efficientexcavations  4 місяці тому +2

      I like a cutting edge doing water and sewer ditch and teeth for pipeline. Probably cause we cover so much more ground on pipeline so you encounter a lot more rocks. Also better that water and sewer pipe is on virgin ground so you don’t end up with a sag

  • @mrmom4806
    @mrmom4806 4 місяці тому +1

    1 to 3foot of sand then clay here in Michgan.

    • @efficientexcavations
      @efficientexcavations  4 місяці тому

      Nice, so do you use the sand to bed the pipe when backfilling?