you have misguided by using 53 grade cement to be used in roofing concrete. If 53 grade cement is used, then you have to start curing in 6 hours after completing concrete. when concrete is over at 6 pm , then start curing at 12 o clock in mid night. if curing starts by morning, then crack will develop due to heat generating in concrete. so used 43 grade concrete even in roofing also. if use 53 grade cement, see that curing should be start in 6 hours. then no problem.
Sir we are planning to build till 5th floor but for time being we have decided to build till first floor how much will it cost for the basement to first floor for 1200sqft
ಕನ್ನಡ ಕುವರ ಅವರು ನಾನು ನೆನೆಸಿಕೊಂಡ ಹಾಗೆ ಹಣದ ವ್ಯವಸ್ಥೆ ವಿವರ ನೀಡಿದ್ದೀರಿ👍. ಧನ್ಯವಾದಗಳು...
ನಿಮ್ಮ ಮಾಹಿತಿಗಾಗಿ ಧನ್ಯವಾದಗಳು ಸರ್
What about?
1) Architecture - House plan, electrician , plumbing etc
2) Water consumption
3) temporary electric
4) Interior design
etc
you have misguided by using 53 grade cement to be used in roofing concrete. If 53 grade cement is used, then you have to start curing in 6 hours after completing concrete. when concrete is over at 6 pm , then start curing at 12 o clock in mid night. if curing starts by morning, then crack will develop due to heat generating in concrete. so used 43 grade concrete even in roofing also. if use 53 grade cement, see that curing should be start in 6 hours. then no problem.
Yes absolutely, we have to cure and put ponding immediately so no need to cure overnight
Hi sir I want cunstruct building in 40 × 30 east facing 2 bed rooms 4 units and 1 bhk 3 units G + 3 floors plz make vedio
And next video 750 sqft duplex 3bhk house design under 20 lakhs
Super information sir
ನಾನು next year 2025 ge
20 lak budget alli kattisbeku ಅಂಕೊಂಡಿನಿ...
In this 20 lakh budget, simple interior work is also included ??
👌🤝🙏 ಸಚಿಷನ್.
33*47 size site. ground floor nali onedhu 2 bed room. Badige mane.mikidhu full parking beku. first floor nali onare Mane. price estagabahudu
Super video sir
Sir we are planning to build till 5th floor but for time being we have decided to build till first floor how much will it cost for the basement to first floor for 1200sqft
25L two floors agutha and plot size is 30*40
Sir 20*40 east face site duplex house construction cost yestu haguthe pls thilisi Kodi sir.
Namige kudha ond mane madbeku sir
ಅತ್ಯುತ್ತಮ ರೆಡ್ oxide ಟೈಲ್ಸ್ ಮತ್ತು ಉಡುಪಿ ರೆಡ್ ಟೈಲ್ಸ್ ಬಗ್ಗೆ ಮಾಹಿತಿ ಕೊಡಿ
Sir namgu mane kattabeku anta kanaside kannadakuvara hogboda nambaboda sir plz heeli
40*40 2bhk and shatar agutta sir Twenty20 lakh nalli agutta hage swalpa plan haki kodi sir pls......
780sqft 2bhk 12lack nalli aagutta sir
RCC company ಯವರು ನನಗೆ 20*40 ನಿವೇಶನದಲ್ಲಿ 25ಲ್ಯಾಕ್ ನಲ್ಲಿ ಗ್ರೌಂಡ್ ಫ್ಲೋರ್ 1bhk and first ಫ್ಲೋರ್ 2bhk ಕಟ್ಟಿ ಕೊಡುತ್ತಾರ ?
We r from hyderabad....can u suggest us here company in detal
Painting baggene helilla bro
One chdra 2 lacks contrct E manege materials yava rateindu hakuttare telese
Cheap rate and quality du hakthare
Hi nim house infarmes channgi kodtira
🏡👌
🙏
30*40site nalli 30 lakhs dalli Mane katta bahuda
Yes bari labour contract Kodi and materials prathiyondu neeve kodsi
30*40 ಸೈಟ್ ನಲ್ಲಿ duplex house plan ಕೊಡಿ ಸರ್.
Sir nimm video nodidhe sir contact heg madali sir
30 lakshakke 3 bhk mane hege construction mododu tilisi
Site size ?
ಇವಾಗಿಲ್ಲ ರೆಡಿಮೇಡ್ ಮನೆಗಳು ಬರ್ತಾ ಇದಿಯಲ್ಲ ಅದು ಹೇಗಿರುತ್ತೆ ಹೇಗಿರುತ್ತೆ ಅದರ ಕ್ವಾಲಿಟಿ ಹೇಗೆ ತಿಳಿಸಿ ಕೊಡಿ ದಯವಿಟ್ಟು
Evrnuna nambi makmele topi hakiskobedi. Brand promotion aste evna concept. Evananta sulla mattobba ella
Materials yella depkondu bandre labour charge kotti kattisbodhu 😂😂😂
😊💞🤟
ಇವಾಗ ರೆಡಿಮೇಡ್ ಮನೆಗಳು ಬರ್ತಾ ಇದೆಯಲ್ಲಾ ಅದು ಹೇಗಿರುತ್ತೆ
Jasti baalike baralla bari godown or factory thara purpose ge ok
Sir please house drawing send me
30 lak
Good information sir