Red Iron shop build Installing the large bay doors

Поділитися
Вставка
  • Опубліковано 23 гру 2024

КОМЕНТАРІ • 6

  • @robertrreagan1179
    @robertrreagan1179 2 роки тому +1

    Wishing for a more detailed installation video of the doors, but yet good video

    • @shockleybuilt4418
      @shockleybuilt4418  2 роки тому

      Thanks. Yeah I wish I could do more of a how-to at times but with it only being me it is hard to show stuff like this that can fall and really hurt me LOL. Plus I was in a hurry to be ready to set all 3 doors up after a friend of mine got off work that could help me that day. One of these days maybe I can be like some of these big you tubers and hire a camera man 😎😁😂🤣

  • @alienmagrinat7341
    @alienmagrinat7341 2 роки тому

    What brand doors are them

    • @shockleybuilt4418
      @shockleybuilt4418  2 роки тому

      Best I remeber they were model 2000 from roll up door direct and I picked them up in Atlanta.

  • @daddie_longlegs9357
    @daddie_longlegs9357 2 роки тому +1

    Nice doors but for someone that wants to put them up a step by step instruction of how you did it would have been nice.....jus'sayin

    • @shockleybuilt4418
      @shockleybuilt4418  2 роки тому

      I wish I could but being just me and having had some help scheduled for 3 that afternoon I had to get busy LOL. All doors I have bought actually had ok directions and I even had to look at these cause they had a little bit different setup on the drum hangers (what I call them anyhows) on how to mount them. But basically just determine if those drum hangers mount to the building or the upright track. Mount them in order based on instructions first or second and the vertical tracks are usually first or second in the order. On this door with red iron framing the drum hanger plates mounted first and need to be level with each other as there was no up/down adjustment after mounting. Mount the drive system on the doors and see if you can pre-install the mounting/clamping pieces. Then I mounted the tracks plumb and then set the doors on the hangers. Then I pre-loaded the spring tension 2 rounds. Then I cut the plastic wrap on the doors while I got my dad to hold the chain for the door to keep the tension. Then I simply feed the door into the track with his help. Last step is to bolt the slide lock and angle pieces on door and the door stop on the track. I was doing all 3 doors at same time and had my scissor lift so it was going fast in all reality so I couldn’t really film and had to do the wrap up the next day. Any questions just ask and I would be happy to help. Have a great day.