Why Airoli - Kalwa Line the Most Important Railway Project in Mumbai 🛤

Поділитися
Вставка
  • Опубліковано 5 чер 2023
  • #Mumbai #indianrailways #MumbaiRailwayProjects #InfrastructureDevelopment #AiroliKalwaLine #UrbanTransportation #MumbaiLocalTrain
    The Airoli-Kalwa Line, connecting two prominent suburbs in Mumbai, is a game-changer in terms of enhancing connectivity and easing the daily commute for millions of residents. We discuss the key features and benefits of this project, including reduced travel time, decongestion of existing lines, and improved accessibility to educational institutions, employment hubs, and commercial centers.Moreover, we shed light on the immense planning and engineering efforts that have gone into the construction of this railway line. From tunneling and station design to ensuring safety and integration with the existing rail network, we uncover the complexities involved in making this project a reality.The 8-km Airoli-Kalwa elevated rail corridor has been planned in two phases. In the first phase, the halt station of Digha that does not require land acquisition is nearing completion. While the booking office, an overhead water tank, and a retaining wall are ready, work on a bridge, subway, and platform shelter is likely to be completed by December,” an official from Mumbai Rail Vikas Corporation (MRVC) said.
    MRVC is executing the ₹476-crore corridor project under Mumbai Urban Transport Project III.
    The phase 2 that covers land acquisition and resettlement and rehabilitation of project affected households (RRPAH) needs to be completed by the Mumbai Metropolitan Regional Development Authority (MMRDA). Of the 2.55 hectares (ha) land in Kalwa and Airoli, 1.95 ha has been acquired and the acquisition of balance 0.60 ha is in an advanced stage
    🔔 Join this channel to get access to perks:
    / @powertrain
    मुंबई में दो प्रमुख उपनगरों को जोड़ने वाली ऐरोली-कलवा लाइन, कनेक्टिविटी बढ़ाने और लाखों निवासियों के लिए दैनिक आवागमन को आसान बनाने के मामले में गेम-चेंजर है। हम इस परियोजना की प्रमुख विशेषताओं और लाभों पर चर्चा करते हैं, जिसमें कम यात्रा समय, मौजूदा लाइनों की कमी, और शैक्षणिक संस्थानों, रोजगार केन्द्रों और वाणिज्यिक केंद्रों तक बेहतर पहुंच शामिल है। इस रेलवे लाइन के निर्माण में। सुरंग बनाने और स्टेशन के डिजाइन से लेकर मौजूदा रेल नेटवर्क के साथ सुरक्षा और एकीकरण सुनिश्चित करने तक, हम इस परियोजना को वास्तविकता बनाने में शामिल जटिलताओं को उजागर करते हैं। 8 किलोमीटर लंबे ऐरोली-कलवा एलिवेटेड रेल कॉरिडोर की योजना दो चरणों में बनाई गई है। पहले चरण में दीघा का हॉल्ट स्टेशन, जिसमें भूमि अधिग्रहण की आवश्यकता नहीं है, पूरा होने वाला है। मुंबई रेल विकास निगम (एमआरवीसी) के एक अधिकारी ने कहा, जबकि बुकिंग कार्यालय, एक ओवरहेड पानी की टंकी और एक रिटेनिंग वॉल तैयार है, पुल, सबवे और प्लेटफॉर्म शेल्टर पर काम दिसंबर तक पूरा होने की संभावना है।
    OUR OTHER CHANNELS
    ⚪VLOG CHANNEL - / @aakashbhavsar2342
    ⚪FOOTAGE DEMOCRACY - / @footagedemocracy3663
    ⚪SHORTS CHANNEL - / @powershorts1068
    FOLLOW US ON
    ⚪INSTAGRAM 1 - / aakash_rb
    ⚪INSTAGRAM 2- / powertrain_yt
    ⚪FACEBOOK - / powertrainofficial
    ⚪TWITTER - / powertrain_yt
    ⚪DISCORD - / discord
    _____________________________________________________________________
    INTRO MUSIC IF PRESENT - LEMMiNO - A THOUSAND YEARS
    • LEMMiNO - A Thousand W...
    CC BY-SA 4.0
  • Наука та технологія

КОМЕНТАРІ • 233

  • @akshithtalks179
    @akshithtalks179 Рік тому +40

    This project should complete fast it will help many Dombivli Kalyan and beyond ppl. Train boarding from Thane during peak hour is horrible.

    • @sanjaysinalkar713
      @sanjaysinalkar713 Рік тому

      Katai Nakka Also In Progress

    • @Atiq_s
      @Atiq_s Рік тому +4

      Yes and management shouldn't be an issue as harbour line manages the split at Wadala pretty well. That they're saying it can be issue shows their laziness. Babus won't change.

  • @ShivBalram
    @ShivBalram Рік тому +157

    Vasai se bhi frequency badhani chahiyee panvel ke liye

    • @TheAkshayBhagat
      @TheAkshayBhagat Рік тому +7

      Pata nahi kaam chalu hai wo kab khatam hoga

    • @adbhutcivil
      @adbhutcivil Рік тому +10

      Panvel Jana hai

    • @praful_mishra_
      @praful_mishra_ Рік тому +6

      Bhai kitne Maine bola ye topic ek dadicate video banao

    • @AsperK.22
      @AsperK.22 Рік тому +4

      Kaha se bhai, nahi badha sakte frequencies, already express train ne yeh route bhar diya hai.

    • @TheAkshayBhagat
      @TheAkshayBhagat Рік тому +3

      @@AsperK.22 isliye toh kaam chalu hai

  • @theonelife7994
    @theonelife7994 Рік тому +18

    Thane to airoli is such a hectic portion of whole travelling

    • @altmosetz_01
      @altmosetz_01 Рік тому +4

      When Navi Mumbai development began more than 15 years back shouldn't the authorities have looked at road, train & metro network & connectivity? They did not . And now when situation is as good as at crisis point they are trying to do patchwork solutions which also will take another decade or more for completion. These areas are occupied by common people who are low on the priority list of Govts.
      The undersea twin tunnels in South Mumbai are nearing completion while Thane metro is being built for more than 10 years now and is no where near even 1st phase completion

    • @Atiq_s
      @Atiq_s Рік тому

      ​@@altmosetz_01coz the authorities are babus sitting idle doing nothing, wasting public money. Same can be pointed out for their plans to link Mumbai Navi Mumbai through metro. Wait there's no plan.

  • @anky29
    @anky29 Рік тому +96

    They have already built two new platforms in Kalwa, Mumbra and Diva for trains which will run on this new line. So, i don't think there will be any management problems on these stations.

    • @phirangi91
      @phirangi91 Рік тому +18

      Those new platforms are for fast trains, not dedicated to elevated link.

    • @greenrico10
      @greenrico10 Рік тому +5

      @@phirangi91 kalwa and mumbra are not connected to the fats line though?

    • @Yatogami1_Yamato
      @Yatogami1_Yamato Рік тому +3

      @@greenrico10 Currently there are six lines till Kalyan. 2 slow, 2 fast and two for the trains going Konkan, western line and those originating from LTT. Older slow line is now the new fast line. That’s why fast trains and Mumbai, Dadar originating Express go from Kalwa, Mumbra now.

    • @zaheerbeg4810
      @zaheerbeg4810 Рік тому +2

      You are 100% right

    • @_Infocars
      @_Infocars 7 місяців тому +2

      There will be a major management issue here. CST to kalyan has 6 tracks. 4 for local trains & 2 for express trains. Now local trains will have to cross the express lane to reach Airoli which will cause a lot of rail congestion & delays.

  • @abhisekdas435
    @abhisekdas435 Рік тому +6

    Much needed 👏👏👏👏

  • @mohanpursnanivishindas4857
    @mohanpursnanivishindas4857 Рік тому +9

    Shuttle services between thane towards kalyan can be increased so that crowd gets relief, alternative transport to be encouraged

  • @hrushikeshavachat900
    @hrushikeshavachat900 Рік тому +8

    Everyday go from this line. It's a different life altogether.

  • @adityakambli6495
    @adityakambli6495 Рік тому

    great video bhai !

  • @sunderlalahuja6263
    @sunderlalahuja6263 4 місяці тому

    Very good knowledge for Me and also for Many other people.

  • @amitrookie
    @amitrookie Рік тому +49

    I think that Government should focus more on building transportation services and vehicles like buses trains etc and should limit the high number of lane s road or highways, because it holds a major chunk of pollution and improved transportation and 15 minutes city types of initiatives can reduce the amount of pollution and also build cities where every necessary things should be closer to people who live there so that they will use cars lesser.

    • @yashyadav6190
      @yashyadav6190 Рік тому +11

      Dhruv rathee effect 😂

    • @maari7132
      @maari7132 Рік тому +6

      Ye pakka dhruv rathee ka twisted facts sunke aya hey. Kabi kabi influence hone se acha apna khud ka dimag lagake research kro

    • @maari7132
      @maari7132 Рік тому

      Ye sab isliye kyuki India 3rf automobile industry bana hey world mey japan ko beat krke. USA ,China & Europe ko Darr satane laga hey ki hunki industry India mey jake shift na ho.isliye ab youtubers ko paise khilake pollution ka awareness fela rahe.

    • @amitrookie
      @amitrookie Рік тому +4

      @@maari7132 jab kisi ne pehle hi dimaag laga kr solution nikal liya ho toh usse use krlena hi samjdari hoti hai, agar thoda dimag lga kr tu video dekh leta ya comment padh leta toh tujhe shayad samjh aata.

    • @maari7132
      @maari7132 Рік тому +5

      @@amitrookie bhai tu rehene de tu german shepherd ka hi sunn .Terese aur kuch nhi hoga

  • @abhishekgorale4722
    @abhishekgorale4722 Рік тому

    Helpful information.

  • @rajgor8651
    @rajgor8651 Рік тому +6

    Aaj bhi Thane station ki halat same thi because trains were delayed in harbour line

  • @TheDailyScroll0389
    @TheDailyScroll0389 Рік тому +1

    Very informative 🎉

  • @jogindersingh1947
    @jogindersingh1947 Рік тому +30

    #askpt what are the reasons cidco is proposing metro neo instead of standard metro in NMM lines 3 and 2?

    • @AsperK.22
      @AsperK.22 Рік тому +6

      Umm there was an article by swarajya, I have to search it if I got so I could share it here. Cidco using neo metro in navi mumbai because navi mumbai is already a planned city and its road infrastructure plus bus transportation is already been in a good condition. Tough some alternate transit system is required and today navi mumbai's population is not so much or over crowded like mumbai.

    • @Atiq_s
      @Atiq_s Рік тому

      To save money as metro are suited for dense population not some retired nana nanis wanting releif from city pollution and hassle and living in sparse neighbourhood.

  • @praful_mishra_
    @praful_mishra_ Рік тому +9

    Vasai road se bhi frequency Increase honi chahiye jo direct central line ko connect karti hai😢

    • @riyazshaikh3240
      @riyazshaikh3240 6 місяців тому +1

      CSt se vasai service chalu hona chahiye via koper

  • @Varun10299
    @Varun10299 Рік тому +3

    Kalyan to Aroli will be Possible 💯,
    Nice!

  • @sahilphatangare945
    @sahilphatangare945 Рік тому +3

    Dialy i have to travel from ambarnath to panvel for college , train frequency and timings sucks the most

  • @abubakarshaikh1638
    @abubakarshaikh1638 Рік тому

    very nice info

  • @RavindraJadhav1983
    @RavindraJadhav1983 Рік тому

    Very true ❤

  • @spandy9392
    @spandy9392 Рік тому +1

    500k soon🎉🎉

  • @girishshirwale6544
    @girishshirwale6544 8 місяців тому +2

    Badlapur se panvel ke bich me bhi ek suburban railway project hona chahiye.mumbai vadodara expressway jo badlapur se pass ho raha hai.uske parallel ye line hona chahiye.

  • @C02754
    @C02754 Рік тому

    Thank you

  • @DeepakShettigar
    @DeepakShettigar Рік тому +25

    #AskPT what are your thoughts on more shorter distance mumbai local trains. Like currently we have Kurla- Thane, Or Thane-Kalyan etc. More trains should be Kalyan-Karjat, CST- kurla etc etc. This really helps in lesser crowds, like people between that band only take those trains and those who wants to travle long can change it. I think people will prefer less crowd with this little inconvenience of changing trains. Earlier longer route trains made sense with economic perspective, but with growing population railway will always find ticket takers at all stations.

    • @friendeleven5711
      @friendeleven5711 Рік тому +2

      It's wastes a lot of time.
      New metro is much slower than local train even though being efficient

    • @skilz9525
      @skilz9525 Рік тому

      Karjat trains are far less that what crowd is demanding

    • @Yatogami1_Yamato
      @Yatogami1_Yamato Рік тому +1

      Once Kalyan station is revamped, we can expect more trains for Karjat, Kasara from there. Currently the platforms are not enough to originate any.

    • @_Infocars
      @_Infocars 7 місяців тому

      Bro it's a simple logic. If there are many local trains ending at random locations which will again go back reverse, it will affect all the trains coming behind it. Causing all the trains to delay.

  • @debjyotibid8105
    @debjyotibid8105 Рік тому +5

    We need 1.5 lakh Km railways line
    50K km DFC and 30K km high-speed railways by 2035

  • @rohitirctc6037
    @rohitirctc6037 Рік тому +4

    Due to this project hope kalwa people will get to enter CSMT bound local train during peak hours

  • @vijaykumaryadav5818
    @vijaykumaryadav5818 Рік тому

    Fast bola par awaj bahut clear hai, project ke baare mein bataaya, thanks🌹

  • @SSRealLifeVLOGS
    @SSRealLifeVLOGS Рік тому

    Wow 😊

  • @tejasgejage8092
    @tejasgejage8092 Рік тому +1

    Right bro me ambernath me rehta hu mostly public working karti h thane vashi line PE Mera office to thane me hai but public and rush bolhat hoti hai jafa kar ke sham ko ate time morning me Jada issue nahi hota

  • @abhijitsalunkhe5530
    @abhijitsalunkhe5530 Рік тому

    Simple solution for complex problem. If government comes up with error free signal system most of the problems of train delays and cancellations can be solved. Just increase the number of trains and reduce the time between two trains. If trains starts running on time commuters will get big relief.

  • @smart2767
    @smart2767 Рік тому

    A better suggestion to reduce the crowd in central especially for Thane local train should be started from Diva junction.

  • @RD-ij2sz
    @RD-ij2sz Рік тому +1

    Not Affected but Benefitted .

  • @KrishnaGupta-bp1ny
    @KrishnaGupta-bp1ny 3 місяці тому +2

    I am from Kalwa as of date 15 March , 2024 the updates are :
    *Digha station is completed and operational for trans-harbour line.
    *The process of connecting the digha and kalwa is going.
    *No reason project are running late by one year.

    • @Sid-uc5ms
      @Sid-uc5ms 3 місяці тому

      Yes there is a reason project is running late, because it's Indian Railways. 🌚

    • @KrishnaGupta-bp1ny
      @KrishnaGupta-bp1ny 3 місяці тому

      @@Sid-uc5ms Indian railway is very huge. That's why they divided in region and the reason for late work in this region is politics. Dirty Politics because of that slum area.

  • @bodhiganguly
    @bodhiganguly Рік тому +1

    Need to extend the jogeswari kanjurmarg metro to airoli and onwards to Kalyan

  • @ranksupersix22
    @ranksupersix22 Рік тому +1

    Thane❤

  • @vivekshegle1246
    @vivekshegle1246 Рік тому +1

    Parel terminus Konkan railway kab start hoga please reply must sar.

  • @aryanchettiar2040
    @aryanchettiar2040 Рік тому +1

    Bro could make a video on pod taxi concept

  • @AsperK.22
    @AsperK.22 Рік тому +5

    Digha station is not inaugurated yet, hai we can think about this airoli kalwa link? 😂 even uran line is ready but nobody is there inaugurated it. None of the work have been started at other stations such as kopri and chikhloli. So sad.

  • @redrevolver11
    @redrevolver11 10 місяців тому

    There needs to be metro line here as well since Airoli and mahape are important it parks

  • @ansarifaisal8956
    @ansarifaisal8956 Рік тому

    Mai daily jata hoon toh dekhta hoon woh station 😂mast hai dekne se lgta future proof hai

  • @nazim0936
    @nazim0936 Рік тому

    6:50 elevated station like Sandhurst Road, can be created at Kalwa? Is it possible?

  • @bmmilind4333
    @bmmilind4333 10 місяців тому

    Why not plan a Borivali - Thane rail line along with the new proposed road through national park

  • @dattatraybelkar6341
    @dattatraybelkar6341 Рік тому +3

    Need of hour Diva-Panvel local ..

  • @theatul001
    @theatul001 Рік тому +1

    Karjat to Panvel new project key upar ek video banavo sir

  • @MalleshDeshmukh
    @MalleshDeshmukh 5 місяців тому

    For Kalyan towards issue is train need to run from both ways till Kalwa and way to Kalyan

  • @myselfyuvi
    @myselfyuvi Рік тому +7

    They should also start direct trains from CSMT to Airoli ✌️

    • @RavindraJadhav1983
      @RavindraJadhav1983 Рік тому +1

      And how it will run

    • @Atiq_s
      @Atiq_s Рік тому +2

      Good point. They could build facility for circular railway that start from central csmt to Thane to vashi harbour to Kurla harbour to csmt central and vise versa. It'll be first for Mumbai.

    • @RavindraJadhav1983
      @RavindraJadhav1983 Рік тому

      @@Atiq_s bhai rail mantree banjao

    • @krishnavishwakarma4874
      @krishnavishwakarma4874 10 місяців тому

      ​@@Atiq_swhat about western line people

    • @_Infocars
      @_Infocars 7 місяців тому

      Just deboard at kurla or thane & go to Airoli. Not a big deal.

  • @surimenon7660
    @surimenon7660 5 місяців тому

    👍🙏👍

  • @Anonymous-je6tc
    @Anonymous-je6tc Рік тому +8

    Thanks, bro for the information.
    what are your thoughts abt the Odhisa train accident??
    did govt find out why it happened, and what they are going to do for the people who are affected by that accident??

    • @Md_Zahid
      @Md_Zahid Рік тому +4

      Bhai ye video nahi banayega dekh lena ye sirf government ki tareef ki videos banata hai

    • @Anonymous-je6tc
      @Anonymous-je6tc Рік тому +2

      @@Md_Zahid 😢🤦‍♂🤦‍♂🤦‍♂

    • @AdityaKantKushwaha
      @AdityaKantKushwaha Рік тому +6

      ​@@Md_Zahid
      Abe jab dekho politics
      Bhai jabtak investigation 100% nahi ho jaati tabtak koi kaise bana de video?

    • @Md_Zahid
      @Md_Zahid Рік тому

      @@AdityaKantKushwaha hmm ye bhi sahi hai

    • @soumyadeepchowdhury3585
      @soumyadeepchowdhury3585 Рік тому

      @@AdityaKantKushwaha investigation kabi thik se hoga vi nehi because of govt himself faults . Sirf BJP ki baat nehi hai baki party sab agar hota iss jagah sane hota investigation nehi hota .

  • @_sachinbhalerao
    @_sachinbhalerao Рік тому

    Make video on Badlapur 😅

  • @user-jd8nx6bz3s
    @user-jd8nx6bz3s 10 місяців тому

    I am jayesh i use to live in Manasarovar in Navi Mumbai and my school is in Parel i use travel from train via Kurla

  • @amitpanchal9291
    @amitpanchal9291 Рік тому +2

    Kindly make an video on new railway station which will be built between Thane and Mulund.

  • @rahulvarhade9971
    @rahulvarhade9971 Рік тому +1

    Sir Please Make A Video On Nagpur, Amravati, Aurangabad,Jalna , Railway Line Project It's Mostly Important 🇮🇳💯

  • @vinitpatil4983
    @vinitpatil4983 Рік тому +3

    Bhii make a video on....
    Mumbai metro line 1 over crowded hoty hai fir bhi metro coaches kyu nhi badha Rahi hai...?

    • @abhinavpanchal6806
      @abhinavpanchal6806 Рік тому +3

      Kyuki ek aur metro lane with the parallel route progress me hai.. Vikhroli to Oshiwara metro line 6. So maybe they are waiting for it to be completed. Agar tabhi bhi nahi solve hota issue to shayad badha de

    • @vinitpatil4983
      @vinitpatil4983 Рік тому

      @@abhinavpanchal6806 Mai usi area Mai kam pe jata huu..Jo nayi metro Bank Rahi hai...jvlr road PE udhar public office sirf sepze aur Powai Mai hai...aur jo merei line 1 hai vo site chakala jb nagar gundavli midc shantinager marol Naka saki naka jarimari te side sab se jayada office hai...busses aur metro overcrowded hote hai ..aur auto ola uber bhi pick hours Mai nhi milte kisi kisi ko....

  • @SD-hx5ps
    @SD-hx5ps 10 місяців тому

    Delhi like metro connectivity is need of the hour but given the situation in Mumbai n Mmr i seems difficult

    • @_Infocars
      @_Infocars 7 місяців тому

      14 lines already under construction dude

  • @prnva_
    @prnva_ 7 місяців тому +2

    There is already a track which exists that connects to the fast line which is used mostly for goods trains. Railways could use this for running trains as an intermediate measure but we all know they won't do shit.

  • @ketanpatil6219
    @ketanpatil6219 Рік тому

    Make video on uran

  • @pranit77299
    @pranit77299 Рік тому +2

    Csmt panvel fast line ka kam bhi chalu hona chahiye

  • @lIIlI..
    @lIIlI.. Рік тому +5

    Mumbai ko banane ke liye bahut jyada planning ki jarurat hai
    Bahut sare mastermind engineers chahie Jo Shanghai Beijing Moscow Saint Petersburg Tokyo vagera bhi ghoom chuke ho

    • @CoderBoy2004
      @CoderBoy2004 Рік тому

      Aur voo civil engineering desh chor ke Jaa rahe hai😂
      Baki bekar Wale yaha hai + neta😂

    • @lIIlI..
      @lIIlI.. Рік тому +1

      @@CoderBoy2004
      Filhaal to sarkar kaafi Projects chalaye hue hai jaise Railways,, Parliament Central VISTA project,, Express ways smart cities,, bullet train, Diffence sector,, electronics etc.
      So wahan engineers ko kaam mil raha hai

  • @vighneshrajpillai8383
    @vighneshrajpillai8383 Місяць тому

    NMMT is giving services to reach Navi Mumbai from Kalyan dombivali badlapur

  • @sunilkumargupta7980
    @sunilkumargupta7980 9 місяців тому

    Any update on this project?

  • @soumadeepmondal4549
    @soumadeepmondal4549 Рік тому +5

    #AskPT can Mumbai reclaim more land from sea between Nariman point to Geeta nagar point?

  • @surojitdas8637
    @surojitdas8637 Рік тому +5

    MTHL ke parallel metro ya Suburban line hona chahiye tha.

    • @Atiq_s
      @Atiq_s Рік тому

      Won't happen. expect a dedicated bus lane hai ver mthl though. This is more likely.

    • @Atiq_s
      @Atiq_s Рік тому

      Over*

  • @user-lc6vj4tg9i
    @user-lc6vj4tg9i Рік тому +3

    Why can’t they use existing line through Parsik Tunnels connecting Kalyan through Diva?

    • @phirangi91
      @phirangi91 Рік тому

      Now parsik tunnel is dedicated to mail/Express and freight. And it will miss out commuters from kalwa and mumbra. Also that line is single line not used by local trains.

    • @rrajdippawskar9853
      @rrajdippawskar9853 Рік тому

      @@phirangi91 Mail and express trains use the fast line from Kalwa-Mumbra area. Superfast trains and trains from LTT are the only passenger trains which use Parsik tunnel now. Rest are freight trains.

    • @altmosetz_01
      @altmosetz_01 Рік тому +2

      Navi Mumbai is a mess where road, train & metro network & connectivity are concerned. And this area will continue as is with patchwork solutions & super slow Infra projects. Common people stay in these areas & their value is only votes which they easily get manipulated to give for stupid reasons
      CM Eknath Shinde & his son Srikant's constituencies are in & around Thane since long. Even then Thane Metro is under construction for more than 10 yrs & the 1st phase is no where near completion.
      While the Undersea twin tunnels in South Mumbai is nearing completion . It starts at Girgaon extending north under the Arabian Sea, Girgaon Chowpatty & Malabar Hill ending at Breach Candy.
      Why the urgency ? Coz it's convenient to the wealthy & the powerful people such as politicians who live in South Mumbai.
      Even the high-speed coastal road network will complete at super speed till the point its convenient to people living in these affluent areas.
      Post that the project will be at snail's pace and at best will be a trimmed down version of what exists in the 1st part. .

  • @Iqbaltakki01
    @Iqbaltakki01 3 місяці тому

    This should have been connected through Diva instead of kalwa, this would help connect people coming from Vasai

  • @shiekkaleem4539
    @shiekkaleem4539 6 місяців тому

    #AskPT can u create video about kalyan yard remodeling

  • @samratdhamale
    @samratdhamale Рік тому +5

    Bhynder should be connected to thane too through eleveted lines

    • @sarveshd9483
      @sarveshd9483 Рік тому +1

      Jagah kaha hai?

    • @samratdhamale
      @samratdhamale Рік тому +1

      @@sarveshd9483 khadi pe se ghumana chaiye

    • @SohamSMore
      @SohamSMore Рік тому

      Metro line 10

    • @altmosetz_01
      @altmosetz_01 Рік тому +1

      10 saal se Thane Metro ban raha hai. Ye sab hopes rakhna bekar hai. Best roads , metro & train network & connectivity sirf Bandra tak hai. Thane , Navi Mumbai etc mein aam aadmi rehte hai.

    • @Atiq_s
      @Atiq_s Рік тому +1

      ​@@altmosetz_011.3cr people from Mumbai:'Hum aam aadmi nhi'😂😂

  • @akshaybathnotra3715
    @akshaybathnotra3715 Рік тому

    That day I was in the same rush 😂

  • @girish5856
    @girish5856 9 днів тому

    When will this project get completed?
    Since January till June in 2024, 23 people have lost their lives owing to falling from the overcrowded local trains between Dombivali and Thane stations.

  • @pranavjha7769
    @pranavjha7769 Рік тому +2

    Panvel to Thane/CST/Andheri ko fast kyu nahi hai ??

  • @shabbirsoman5531
    @shabbirsoman5531 9 місяців тому +1

    IT IS A SIMPLE PROJECT BUT RAILWAYS ARE DELAYING IT TILL NOW.

  • @anant_shinde
    @anant_shinde Рік тому +5

    #AskPT What if the Mumbai local railway network will be privatized, what are the pros and cons?

    • @rithvikrao7416
      @rithvikrao7416 Рік тому +4

      More cons for sure

    • @rithvikrao7416
      @rithvikrao7416 Рік тому

      Mumbai trains run 3-4 times theor capacity do you think any pvt company would allow this?it would eventually lead to more congestion and traffic

    • @myselfyuvi
      @myselfyuvi Рік тому +1

      You can't privatize everything!

    • @altmosetz_01
      @altmosetz_01 Рік тому

      Private sector would do a much better job.

    • @ranksupersix22
      @ranksupersix22 Рік тому

      ​@@altmosetz_01hahaha nyc jokes boss😂

  • @hdkloh6857
    @hdkloh6857 Рік тому +1

    I thik Metro option have a better choice instead of Indian Railway. Esp for speed-up, permissions also which comes under state-govt

    • @svcreation7606
      @svcreation7606 8 місяців тому

      Thane district is no 1 in highest population in india
      Local having min 12 car and maximum 15 car as compare to metro it's double no of car

  • @11dharam11
    @11dharam11 4 місяці тому

    Why not Diva to Airoli.

  • @indiafirst5545
    @indiafirst5545 11 місяців тому

    There is an urgent need for Shilphata train connectivity.

  • @om4136
    @om4136 Рік тому +3

    #Askpt what upgrades did Indian police needs?

    • @maari7132
      @maari7132 Рік тому

      First of all give them a drees which didn't need to press and shoes which didn't need to polish.

  • @sunilkumarmishra1553
    @sunilkumarmishra1553 Рік тому +3

    I was expecting complete detailed video on Odisha train incident

  • @dindayalram8796
    @dindayalram8796 9 місяців тому

    Thane 💪

  • @jamchemistry
    @jamchemistry Рік тому

    Bhai
    Mujhr ek batao pahle
    Mai Dombivili se nikla aur jaana hai ghansoli, to mere ko Dombivili se direct ghansoli train available rahega ki mai pahle Dombivili se kalwa jaaunga aur fir kalwa me change ker ke dusre platform per jaakar ghansoli jaane wali train padunga? Ye batao jara

    • @pumred
      @pumred Рік тому +2

      You directly catch kalyan-panvel train from dombivili to ghansoli. No need to change train in kalwa.

    • @DivyankaParulekar
      @DivyankaParulekar Рік тому

      ​@@pumredye abhi decided nhi hai ki train kidhar tak chalana he

  • @rizwanshaikh1423
    @rizwanshaikh1423 Рік тому

    Bhaiii gansoli se bhi ho sakta h ye toh cut

  • @HigherSelf-hd3or
    @HigherSelf-hd3or 10 місяців тому

    ओव्हर bridge बनाना पडेगा कळवा मे, तो ही crossing का issue solve होगा।

  • @dindayalram8796
    @dindayalram8796 4 місяці тому

    Sabse Accha hoga diva-parsic tunnel-digha rail link hona chahiye

  • @hypocrite5873
    @hypocrite5873 Рік тому +4

    Make small cities 😀

  • @manoharune6381
    @manoharune6381 Рік тому

    I think you are not ware 6:19 -> The 5th & 6th Lines are extended from Thane - Diva on 19th Feb 2022 by Hon. PM Modi, and now all six line services are available from CSMT to Kalyan Jn.

  • @pokegamerz3955
    @pokegamerz3955 Рік тому +1

    First comment

  • @skagrawal3343
    @skagrawal3343 Рік тому +2

    Bhai thoda slow bolo

  • @bharatwaghmare3891
    @bharatwaghmare3891 Рік тому +1

    It's main line not central line

  • @msandeepvlogs
    @msandeepvlogs Рік тому +1

    Such small but big impact projects should be escalated for development

  • @Sunnyfreezo
    @Sunnyfreezo День тому

    Sabse pehle morning m local jaldhi shuru kro Airoli se thane k taraf

  • @yogesh522
    @yogesh522 Рік тому

    Dekhiae bhai sahab aap batate achcha jankari dete Hain aap. Bus thoda kam pakaya kariye yah bas

  • @skilz9525
    @skilz9525 Рік тому

    Not harbour it's herbal line

  • @mygallery4899
    @mygallery4899 Рік тому

    😊👍
    Hi

  • @MVichare100
    @MVichare100 Рік тому

    This work started in 2015 and still it's in progress😂

  • @Aditya_maurya1
    @Aditya_maurya1 Рік тому +2

    Bhai Titwala Asangaon ko to koi bhaav hi nahi deta 😢

    • @johnchrist-cn8ql
      @johnchrist-cn8ql 2 місяці тому

      most BTful suburban section in india with hilly views is Kalyan Kasara section

  • @kapilsapre
    @kapilsapre 11 місяців тому

    Video is good. But your narration is too fast.

  • @SwastikKumar-nx3bw
    @SwastikKumar-nx3bw Рік тому

    Thane is like, Rajiv chowk of Mumbai 😅😅😅

  • @avionserrao7943
    @avionserrao7943 4 місяці тому

    Don't know why the hell railways made 2 extra platforms at kalwa. That could be used for bringing fast locals at those point for every 15 minutes. It could even help mumbra and diva commuters as well. This will be also helpful in reducing travel time and cost. Don't know but I feel railway guys are sleeping.

  • @dawntreader8370
    @dawntreader8370 Рік тому +2

    mujhe kya mai toh borivali wala hoon😂

  • @parthmehta3774
    @parthmehta3774 Рік тому

    #askpt 1.i am speaking with context of mumbai
    -
    In Mumbai we have many pagdi system buildings , want to understand complete law which helps tenants raise there concern and every tenant can have its own home redeveloped.
    2.near railway trains tracks there are many legal buildings and structures which are legal and shaking due to high speed rail which may lead to collapse of building, buildings are in dilapidated condition,help us know how can one raise the concern and avail accommodation.
    3.context is if building is dilapidated the building will be destroyed but what about people living inside the building,is there any protection available for them??
    4.what happens to buildings which when go old by 99 years ,like currently small buildings are destroyed and new are made ,which helps builder make money ,bt what about buildings which are already more than 22floors and become dilapidated.
    What happens in developed nation??
    5.nead complete knowledge of pagdi system, request to help us with series of videos and medium over which people can discuss the queries .

    • @kamleshbhandari3229
      @kamleshbhandari3229 Рік тому +1

      The tenants or landlord can approach MHADA to repair the dilapidated structure if the building is a Cessesd Building (i.e., the tenants and landlord are paying Repair Cess to MHADA). If it’s not Cessed Building, tenants must come together and explore options for builder-led redevelopment or self-redevelopment.

    • @parthmehta3774
      @parthmehta3774 11 місяців тому

      @@kamleshbhandari3229 they spent money and show bills and take sign of building members as well few members of building are just nonsense .so nothing much changes happen with that repair money

  • @dnyaneshwarsaste3945
    @dnyaneshwarsaste3945 4 місяці тому

    Power Train🚫 power Train Mumbai ✅

  • @heeetv6463
    @heeetv6463 Рік тому

    i guess its dighe

  • @user-jz6nu4sn9v
    @user-jz6nu4sn9v Місяць тому

    🙏🙏😭😭😭😭😭🙏🙏🙏