N226 Drive-by Maarsbergen - Roadworks for a new tunnel (NL)

Поділитися
Вставка
  • Опубліковано 9 тра 2024
  • The level railway crossing on the N226 near Maarsbergen will be replaced by a newly built tunnel west of the current level crossing in 2026. The preparatory work has been completed and tunnel construction started in March 2024.
    The road from Maarsbergen to Maarn was still exactly in the route of the northern tunnel entrance. This road was moved at the end of April to a new, definitive route north of the tunnel mouth that was given the name Bosweg (EN: forest road, due to its location next to the forest of the Anderstein Estate). The Bosweg is connected to the N226 via a newly constructed roundabout.
    In the video you can see the situation in Maarsbergen in May 2024.
    =================================================
    De spoorwegovergang in de N226 bij Maarsbergen zal in 2026 worden vervangen door een nieuw gebouwde tunnel ten westen van de huidige spoorwegovergang. De voorbereidende werkzaamheden zijn afgerond en in maart 2024 is gestart met de tunnelbouw.
    De weg van Maarsbergen naar Maarn lag nog precies in de route van de noordelijke tunnelingang. Deze weg is eind april verplaatst naar een nieuwe, definitieve route ten noorden van de tunnelmond die de naam Bosweg heeft gekregen (vanwege de ligging naast het bos van Landgoed Anderstein). De Bosweg is via een nieuw aangelegde rotonde aangesloten op de N226.
    In de video kan je de situatie in mei 2024 zien.

КОМЕНТАРІ •