CSIR Regional Transport Aircraft : The 90 seater Turboprop Aircraft needs $2 Billion for development

Поділитися
Вставка
  • Опубліковано 27 бер 2023
  • Join this channel to get access to perks:
    / @indiandefenseanalysis
    India has been a slow starter in Aerospace sector as not enough fund and focus was given by governments for its development. Many programs has been sanctioned but not with enough fund to drive R&D and take the program to conclusive end.
    $2 Billion for RTA
    In the field of commercial jets, CSIR-NAL has done lot of work. In an interview to ET Infra, Dr. Abhay A. Pashilkar, Director, CSIR-National Aerospace Laboratories, stated that a clean sheet design and development of the country's first regional aircraft, referred to as Regional Transport Aircraft or RTA, a 90-seat turboprop aircraft, will require funding of up to $2 billion and the project will be executed under a Special Purpose Vehicle to ensure efficient execution.
    "Typically, $1 billion for full scale engineering development, and then subsequent production will be done by industry. So typically, overall, it is something like $2 billion of investment for a clean sheet design, as they call it. So the derivative design where we take an existing aircraft would be probably less expensive in that sense but that is the kind of ballpark figure,"
    **WHOMSOEVER IT MAY CONCERN
    Most of the pictures clip or BGM included in the Video
    Belongs to their Respected Owners and we do not claim rights.
    We are using them under following act:
    UNDER SECTION 107 OF THE COPYRIGHT ACT 1976, ALLOWANCE IS MADE FOR "FAIR USE" FOR PURPOSES SUCH AS CRITICISM,
    COMMENT, NEWS REPORTING, TEACHING, SCHOLARSHIP, AND RESEARCH. FAIR USE IS A USE PERMITTED BY COPYRIGHT STATUTE THAT MIGHT
    OTHERWISE BE INFRINGING. NON-PROFIT, EDUCATIONAL OR PERSONAL USE TIPS THE BALANCE IN FAVOR OF FAIR USE.
    Follow us on social media:
    / analysisdefense
    indiandefenseanalysis.com/
    ==============THANKS FOR WATCHING!================
    PLEASE LIKE SHARE & SUBSCRIBE: "INDIAN DEFENSE ANALYSIS"
    Music: Eternal Garden - Dan Henig

КОМЕНТАРІ • 58

  • @rajeshkadam1794
    @rajeshkadam1794 Рік тому +31

    This Project is of immense importance for India both from civilian and military point of view. It can change Civil aviation Market completely can be used as Refueller, Cargo Aircraft, Reconissance aircraft, Maritime Petrol aircraft, AWACS etc. Indian govt should fast track this project

    • @rajatdani619
      @rajatdani619 Рік тому +5

      When we talk about buisness we always talk about ROI..
      Return on investment..
      Here 2 billion will take like 25-30years..still only half will be payed back..
      Although we will get technology..but A JV will be much cheaper and we will have the proprietor Manufacturing/Modification rights.+ It will come Sooner then never like this.

  • @ananyasain1241
    @ananyasain1241 Рік тому +6

    NAL Always Deliver What They Said. They Are The Real Unsung Heros Of India.❤❤🎉🎉
    सत्यमेव जयते 🇮🇳🇮🇳🙏🙏.

  • @ananyasain1241
    @ananyasain1241 Рік тому +7

    Government Should Invest Some Money To NAL To Open Their Own Production Facility As NAL Is The Best & Most Favorite And Unsung Heros Of Indian Defence Industries As They Single Handedly Developed Critical Technologies By Themselves For India Which Was Restricted By The Western Counties Even They Applied Sanctions.
    सत्यमेव जयते 🇮🇳🇮🇳🙏🙏.

    • @commanderofkesariyaknights
      @commanderofkesariyaknights Рік тому

      Production should be given to private indian firm and NAL should focus on design and get royalties and help develop Indian industry
      Govt should focus on core research instead of running factories

  • @bitanchakraborty4339
    @bitanchakraborty4339 Рік тому +6

    I'll be the happiest person if I'm proven wrong here, but probably we'll get another PowerPoint presentation from CSIR NAL on this, after spending 2Billion and 3 years.

    • @rajatdani619
      @rajatdani619 Рік тому +2

      Don't forget they weren't even able to make NM-5 a 5Seater aircraft. 😂😂😭

    • @akshatbhandari4779
      @akshatbhandari4779 Рік тому

      Yes kids like you have no understanding of R&D and feel important being negative

  • @raviramaiah8576
    @raviramaiah8576 Рік тому +4

    2 billion $ is negligeble to develop and fast forward aviation sector in india which can provide job opportunities as well. This investment is a must.

  • @fly463
    @fly463 Рік тому +5

    NAL ?
    Great
    Let's hope this will be available for production in a century 😃

    • @ananyasain1241
      @ananyasain1241 Рік тому +3

      NAL Deliver What They Said With Quality In Time

  • @carcamp5451
    @carcamp5451 Рік тому +2

    I can see the future.
    It'll be in paper only.

  • @madhan_22
    @madhan_22 Рік тому +3

    Until HAL 's 51%share is sold to pvt companies it is not going to deliver in time because it's working culture is typical govt offices

  • @sriharshacv7760
    @sriharshacv7760 Місяць тому

    After seeing Russia, our govt. should have dedicated budget for this. Govt. shall develop the core product and license it to local manufacturers (incl. their fav. Reliance). Once the product gets going, the private companies can improvise upon the design and take it from there. Otherwise, this will never get started.

  • @datoolz0
    @datoolz0 Рік тому +9

    It still makes sense to consider purchasing Embraer in a 50:50 split, and that will solve most of the IAF's needs like aerial refuellers, and business jets and regional jets. However the issue of expensive jumbo jets remains, and the best solution to that is to join the CR929 jumbo jet project. It is unrealistic to develop jumbo jets entirely on your own, and there are already too many competitors in the regional jet space. Much easier to buy our way in, like how Tata just bought Land Rover. If the NAL team is left in chrage, they will likely take decades to produce a plane. Buying Embraer is the fastest shortcut to success.

    • @DailyLifeSolution
      @DailyLifeSolution Рік тому

      Bhaarata will lose this opportunity too, unfortunately.

    • @datoolz0
      @datoolz0 Рік тому

      @@DailyLifeSolution Grim, the government has been negotiating with Embraer, this has been confirmed by them. Maybe a deal is underway?

    • @ananyasain1241
      @ananyasain1241 Рік тому +1

      @@datoolz0 Nope It Will Be Indigenous Made Medium Aircraft By RUSSIA+India Illusin Aircraft.
      We Need To Invest In Indigenous Technology Rather Than Purchasing It.

    • @matheus_hms
      @matheus_hms Рік тому +2

      @@datoolz0 The only negotiation that the government is having is in relation to a possible sale of the KC-390 to India, with the possibility of technology transfer and local production. Any type of agreement involving changes in the shareholding control of the Brazilian company, as would happen with Boeing, has practically zero chances of being approved by the new Brazilian government, contrary to the sale with strategic companies.

    • @sriharshacv7760
      @sriharshacv7760 Місяць тому

      That seems like the most realistic solution to this. Both Brazil and India would win. India can supply both muscle and brain and scale it to meet the demands of the larger world.

  • @rajatdani619
    @rajatdani619 Рік тому +3

    A wise man once said U made a 19 seater aircraft called saras Mk1 which took 2 decades.. and u spend Millions on it..
    So where is it?
    Babu's said We are working on Saras Mk2 which will be again a 19 seater aircraft but without pusher configuration and will take another decade to come* .😎😎

  • @ReturnDesi
    @ReturnDesi Рік тому

    Can it be run on Kaveri Dry Engine

  • @sajuponnore9863
    @sajuponnore9863 Рік тому +2

    As all projects this will also take another 20 years..... just tie up with Bombardier or Embraer and it will be up and flying in less than 5 yrs ....2 billion on development would be better spent elsewhere....

    • @unknown_5107
      @unknown_5107 Рік тому +3

      RTA-90 is not new program, according to some sources rta first varient will be in service in 2026 ,so without any foreign help nal can develop rta ..

  • @anirudhrajath211
    @anirudhrajath211 Рік тому

    bro have they completed the order of 15 Saras mk1???

  • @matheus_hms
    @matheus_hms Рік тому +1

    Depending on the technology used, this aircraft may reach the market outdated, making the product unattractive. Embraer was on the TPNG, a program for a new generation turboprop with a capacity of 70/90 seats. However, the Brazilian company recently announced its pause, since the technologies offered by engine manufacturers were not attractive, making it run the risk of certifying the plane just when a new class of turboprop engines emerges.

  • @amjadsk.2469
    @amjadsk.2469 Рік тому +1

    For positive outcome in Aerospace sector, Govt should allow pvt firms like Tata and L&T to have partnership with govt R&D agencies for co development with a clear mandate of giving them rights of design and manufacturing after completion of projects. Pvt players will have to pay royalty for getting the IPR rights.
    Govt has to bear the entire project cost.
    Financial Risk has to be taken by govt.
    Otherwise such projects isn't going to become successful.
    Don't expect private firms to invest billions without any commitments.

    • @fly463
      @fly463 Рік тому

      They are allowed to do that

    • @fuzzytarz7990
      @fuzzytarz7990 Рік тому

      involving private players is a very important step!

  • @anonymouse8565
    @anonymouse8565 Рік тому +1

    Using the Su-30's non-afterburning stage as a basis, a turbofan engine should be developed with a max thrust rating of 75 KN. This should be used to power this aircraft. The turboprop required to power this aircraft will have to be humongous. So I feel this is just going to be another long-drawn out projects which might fail.

    • @KneelBeforeBlue
      @KneelBeforeBlue 7 місяців тому

      Doesn't Kaveri already produce 80+ kN thrust?

    • @anonymouse8565
      @anonymouse8565 7 місяців тому

      @@KneelBeforeBlue 80+ kN with "after burners", which are not applicable for airliners.

  • @amvkarthik
    @amvkarthik 11 місяців тому

    Engine?

  • @balventray
    @balventray Рік тому

    Make it a cargo freighter 1st so it can be repurposed as a passenger aircraft later without modification. It would make it more marketable. Rear cargo doors also.

    • @Sacrafago90
      @Sacrafago90 Рік тому

      Saras in 25 years with technology shared from So228 program by HAL,that too with lesser payload & overpriced as usual.

  • @coolkal7590
    @coolkal7590 Рік тому

    Hope it won't be underpowered Our headache is engine

  • @RundranMaha
    @RundranMaha Місяць тому

    All should change to private to do fast,

  • @fuzzytarz7990
    @fuzzytarz7990 Рік тому

    it could have given a turbojet engine, thus I believe its range could be increased in that way.

  • @PankajSachdeva
    @PankajSachdeva Рік тому

    IAF has returned USD 3 billion to govt. That can be used to fund CSIR-RTA.

  • @bikaripaxtan4746
    @bikaripaxtan4746 Рік тому

    Can we say this is the Indian indigenous equivalent of c295 with Multi role multi mission capabilities ? Surveillance reconnaissance, hot refueling, troop transportation, if possible tactical bombing????

  • @Sacrafago90
    @Sacrafago90 Рік тому

    It has been running since last 2 decades,with already money spent on it without even reaching the prototype phase or even out of the drawing boards.
    Investment of 2 billion dollars is justified only if PSU nexus promises to deliver it by 2025-26.

  • @saiprateek5779
    @saiprateek5779 Рік тому +4

    This 90 seater CSIR aircraft can be used in refuelling and ELINT operations if DRDO & ADA works on it ❤🇮🇳🤘

    • @rajatdani619
      @rajatdani619 Рік тому

      Tumhare bacche hojaenge tabtak ho hi jaega ye induct.

  • @vachan7069
    @vachan7069 Рік тому

    Please reduce background music

  • @somdattsable5540
    @somdattsable5540 Рік тому

    40 a350s 20 b787s 10 b777Xs
    70 widebody aircrafts

  • @commanderofkesariyaknights
    @commanderofkesariyaknights Рік тому

    Instead of spending 25 billion annually on distributing free food to 800 million, half of whom don't even need free food, govt should spare some money for important tech development... This will also keep Indian talent in India instead of working for Boeing or Airbus

  • @arvind50
    @arvind50 Рік тому +2

    Give this to TATA or some private player. Else it will only end up as a wooden mock up and as poor PPT animations for the next century.

  • @akhandbharat1593
    @akhandbharat1593 Рік тому +2

    Is this for politicians to escape when they are caught in a scam

    • @prashanthb6521
      @prashanthb6521 Рік тому

      This is for Akhand PM going around the country giving colourful election speeches missing parliament and PMO duties.

    • @nishantshrivastava9674
      @nishantshrivastava9674 Рік тому

      ​@@prashanthb6521 People of India will decide his performance in next general election.. Calm down neither modi nor pappu is going anywhere. 🤗🤗

  • @blackmamba6808
    @blackmamba6808 Рік тому

    Narinder godi ko Naya parliament Banana hai aisa kaam thori krenge

  • @manojkarunakaran8604
    @manojkarunakaran8604 Рік тому

    What is the logic of 90 seater.....better they could have gone for 100 seater

  • @mrsharathgopalanaiyangar8805
    @mrsharathgopalanaiyangar8805 10 місяців тому

    30 year or 50 years 😂

  • @prashanthb6521
    @prashanthb6521 Рік тому

    Waste of time and resources by NAL.
    Thanks for ENGLISH videos and not HINDI.

    • @nishantshrivastava9674
      @nishantshrivastava9674 Рік тому

      No need to bring ur kannada hindi complex here again and again..
      It doesn't matter u speak English or hindi or kannada or marathi or tamil or punjabi until it's easy to comprehend and most importantly it makes sense🤗🤗✌🏼

  • @paritoshgahlan3636
    @paritoshgahlan3636 Рік тому

    Waste of govt money