I worked on the tunnel section of this project for four years, carrying out QC inspections as the tunnels progressed. the two tunnel were constructed from both end using 4 Tunnel Boring Machines.
Sound right :) There has been several documentaries ec. on discovery channel on how these two tunnes and bridges where made. It was a huge task and a big enginering succes. The trip across the bridges are a special feeling driving both trains and car, even cars dont drive in the tunnels ;)
The tunnels were built just for the trains, as a train can't use a suspension type bridge. They can of course use other types. Yes it was an exciting project with lots of challenges, even got to talk with the Queen of Denmark, she asked me what I liked about Denmark and I replied well the deck out the streets with flags on my birthday!!! She replied it doesn't happen to be on the 16th of April does it, the same as mine!!! I received a birthday card from Her Majesty on my next birthday.
I worked on the tunnel section of this project for four years, carrying out QC inspections as the tunnels progressed. the two tunnel were constructed from both end using 4 Tunnel Boring Machines.
Sound right :)
There has been several documentaries ec. on discovery channel on how these two tunnes and bridges where made.
It was a huge task and a big enginering succes.
The trip across the bridges are a special feeling driving both trains and car, even cars dont drive in the tunnels ;)
The tunnels were built just for the trains, as a train can't use a suspension type bridge. They can of course use other types.
Yes it was an exciting project with lots of challenges, even got to talk with the Queen of Denmark, she asked me what I liked about Denmark and I replied well the deck out the streets with flags on my birthday!!! She replied it doesn't happen to be on the 16th of April does it, the same as mine!!! I received a birthday card from Her Majesty on my next birthday.