5 Floor Steel Structure Prefab Office Building

Поділитися
Вставка
  • Опубліковано 6 лип 2020
  • The prefab office building is 3578.38 sqm in 5 floors, 42.9m long, 15.6m wide and 18.18m high. It is our company's new office building.
    Main feature for the steel structure office building system is prefabricated. Main construction, floor, decoration, envelope and utilities are all prefabricated in factory and fast installation on site.
    If you want to build a steel structure office building, pls feel free to contact us
    Ann
    M.P./ WhatsApp/Wechat: +86-15194307960
    E-mail: info@steelstructurescn.com
    Website: www.steelstructurescn.com
    Pre-engineered Steel Building Solution Provider - Reger Steel Structure Company
    More than 20 years of experience, Reger has been focused on providing one-stop solutions including consulting, designing, manufacturing, and installation of pre-engineered steel buildings.
    √ Factory covers area of 150,000 sqm
    √ Supply ability 1500T/Month
    √ R&D teams contain 60+ senior engineers
    √ Exported to more than 100 Countries
    Main Market: Ethiopia, Algeria, Mauritius, Nigeria and Uruguay.
    Our main product including:
    ◆ Industrial workshop plant, factory building, and warehouse
    ◆ Commercial office building, exhibition room
    ◆ Agricultural poultry house
    More videos about our company and projects pls visit: / @chinasteelstructurewa...
    More steel structure projects we did pls visit:
    www.steelstructurescn.com/Pro...

КОМЕНТАРІ • 34

  • @lokesh303101
    @lokesh303101 Рік тому +1

    This is much better.

  • @sureshpunekar7773
    @sureshpunekar7773 2 роки тому +3

    Lovely steel buildings ❤️❤️

  • @sandejzack
    @sandejzack Рік тому

    I am shook!!!

  • @unionssm
    @unionssm 2 роки тому

    Nice!

  • @hevpjf
    @hevpjf 2 роки тому

    WONDERFULL and sound isolation?

  • @jnsjashimuddin5579
    @jnsjashimuddin5579 Рік тому

    Nice

  • @yousifhadeed9286
    @yousifhadeed9286 10 місяців тому

    wow

  • @AdoniasV
    @AdoniasV 3 роки тому +1

    Wow incredible!!! Your company sell only materials or includes installation?

    • @chinasteelstructurewarehou159
      @chinasteelstructurewarehou159  3 роки тому +3

      Adonias Vasquez, thanks, we sell and also install, actually we supply one-stop service: including designing, manufacturing, and installation. If you want to know more about us, pls visit: www.steelstructurescn.com

  • @muhammadkashif2707
    @muhammadkashif2707 3 роки тому +3

    Hello sir, I couldn't umderstand the walls material and drainage system, can you give me some info about that

  • @budgetpilgrim
    @budgetpilgrim 3 роки тому

    Do you also provide materials and labor workers in other countries outside China?

  • @warriorking9509
    @warriorking9509 3 роки тому +3

    what about wiring and water drainage system?

  • @qasimalibadi1302
    @qasimalibadi1302 3 роки тому +1

    Good job, but how long it takes from design till the key door

  • @karim4a7med
    @karim4a7med Місяць тому

    How many days it takes to get completed

  • @SatishKumar-op9uh
    @SatishKumar-op9uh 3 роки тому +1

    Wonderful construction video

  • @idontwanttotellyoumyname.2244
    @idontwanttotellyoumyname.2244 3 роки тому

    Can you share me details about construction cost?

  • @starrosetechnologies7232
    @starrosetechnologies7232 2 роки тому

    I would like to talk to someone about building this structure for me, as shown.

  • @geekybasilempire6874
    @geekybasilempire6874 3 роки тому

    mashallah this much fast

  • @limraconstruction522
    @limraconstruction522 2 роки тому

    Is types ki building kis rat's me ready ho jati h

  • @CryptoWHALE1701
    @CryptoWHALE1701 Рік тому

    What’s the cost of this project?

  • @user-rs3zf3js9d
    @user-rs3zf3js9d 4 місяці тому

    How to get one of this?

  • @aakrititimalsena433
    @aakrititimalsena433 3 роки тому

    Price pls

  • @Kaara8900
    @Kaara8900 3 роки тому +1

    how long did it take to complete

    • @chinasteelstructurewarehou159
      @chinasteelstructurewarehou159  3 роки тому +2

      kaara Gerge, Hello, main steel frame construction completed within 5 days.More detailed information about the office building pls visit: www.steelstructurescn.com/New-Prefab-Office-Building-of-Reger-Steel-Structure-Company-id3054672.html

    • @herbertant4096
      @herbertant4096 3 роки тому

      @@chinasteelstructurewarehou159 is it safe? Kinda confusing

    • @hevpjf
      @hevpjf 2 роки тому +1

      @@chinasteelstructurewarehou159 HOW MUCH DOES IT COST ?

  • @Nived8523
    @Nived8523 8 місяців тому

    Cost