I Cure You no! This was demonstration put on by the installing contractor before the final C/O. They invited all of the surrounding agencies to come watch the demonstration as well. The heads were K-16.8@52 psi which is typically delivers around 1400 GPM. During the observed flow we saw closer to 1700 GPM. This is a very robust system with a strong infrastructure behind it. This particular system will be protecting a large tire distribution warehouse with high piled storage.
Outstanding!
Looks about right - are they measuring amount of water out of the system - to compare it to the calcs...
I Cure You no! This was demonstration put on by the installing contractor before the final C/O. They invited all of the surrounding agencies to come watch the demonstration as well. The heads were K-16.8@52 psi which is typically delivers around 1400 GPM. During the observed flow we saw closer to 1700 GPM. This is a very robust system with a strong infrastructure behind it. This particular system will be protecting a large tire distribution warehouse with high piled storage.
@@thefritz89591454 x 1.17 = 1701, seems about right for friction loss overflow
Location?