MBUDZI INTERCHANGE JANUARY UPDATE. BRIDGES 1,2 AND 3. HARARE ZIMBABWE

Поділитися
Вставка
  • Опубліковано 30 січ 2025

КОМЕНТАРІ • 87

  • @gracemarunya9113
    @gracemarunya9113 2 роки тому +12

    Zimbabwe has the best engineers I trust their work..I have my uncle who is an engineer based in SA is was invited to be part of this team ..this is impressive..👌

  • @jujun6465
    @jujun6465 2 роки тому +15

    Thanks CCC, your ideas are now being used. I remember some people saying negative comments about your plans about spaghetti roads etc. bravo to the young man.

  • @daughterofzion7634
    @daughterofzion7634 2 роки тому +7

    Vanotivenga tivengei hedu isu tichingovaka nyika yedu, brick by brick, in ED’ s voice and accent hanku.
    Weldone and thanks 4 the update my Blessed sisi❤

  • @playgirl7305
    @playgirl7305 2 роки тому +15

    Under bridge 2 you could put hydro electric generators in those river rapids and light up the whole complex and feeding roads. For kilometres before drivers arrive at the interchange.

    • @samn6842
      @samn6842 2 роки тому

      True just a small generator will do the job

    • @samn6842
      @samn6842 2 роки тому

      True just a small generator will do the job

    • @Thatguywoya747
      @Thatguywoya747 2 роки тому

      This is a good idea but there is need to invest more in security of those generator if ever they get to be put otherwise thevies will party.

    • @playgirl7305
      @playgirl7305 2 роки тому +1

      @@Thatguywoya747 you are right, and some silly thieves will probably only just try to cut the electricity copper lines, in order to sell the copper on the black market. But with a high electric voltage in the lines, and on top of that standing in water , it is not a good idea. All participants in the water would go meet and greet their Vadzimu /Ancestors instantly.

    • @Thatguywoya747
      @Thatguywoya747 2 роки тому

      @@playgirl7305 Government has to look into security

  • @MrAllumelg
    @MrAllumelg 2 роки тому +6

    Drone footage can give more clarity. But great work thus far. Not sure if this progress will meet the 18months target though. Lets keep moving. 👏👏

  • @majestic4124
    @majestic4124 2 роки тому +4

    Zvinodadisa izvi pasi newe vandalism, thank you for the update 👏👏

  • @tarisaimhikurochapanduka
    @tarisaimhikurochapanduka 2 роки тому +1

    Great works there we have the best engineers in Zimbabwe I believe in you guyz

  • @rutendomarufu2929
    @rutendomarufu2929 2 роки тому +4

    Thank you for sharing this.

  • @washingtonmadishi6317
    @washingtonmadishi6317 2 роки тому +2

    Nice work

  • @phineasmasori3540
    @phineasmasori3540 2 роки тому +2

    Thank you for your update

  • @daughterofzion7634
    @daughterofzion7634 2 роки тому +6

    Vision 2030 tirikuzviona hamungotauri akuru asi you walk the talk, zvichandituma kuti ndijoine kuti 2030 Menge muchiripo😂😂ini i am just forced ooooh. Zvakanaka zvaitwa ini hanku chipo changu kurumbidza irrespective of whatever. Move Dzimbadzemabwe move. Restoration in motion. It shall be well with you my beloved country. The kauntiri of milk and honey😂 in Malema’s voice and accent.

  • @mhopi9744
    @mhopi9744 2 роки тому +3

    Impressive work 👏👏 Zimbabwe 🇿🇼 is beautiful

    • @shepherdchizema577
      @shepherdchizema577 2 роки тому

      This is Zimbabwe we want just to have a bit of constructive effort since we had a long time neglect we want it,thanks Zimbabwe!

    • @sithabelamandlawenkosiwodu6298
      @sithabelamandlawenkosiwodu6298 2 роки тому

      We are celebrating a road 🤔

  • @ashleymargolis1867
    @ashleymargolis1867 9 місяців тому

    When,are you coming back?

  • @palmindigo1995
    @palmindigo1995 2 роки тому +9

    Zvinhu zvacho zvisati zvapera zvakutoita kunge zvedara or like they r repairing.

  • @CareEquip
    @CareEquip 2 роки тому +4

    The company should make sure that they create a safe working environment for its workers and all stakeholders. The work area should be fenced off those coming on site should be inducted. There should be an information center with pictures of the to be completed structure.

    • @sithabelamandlawenkosiwodu6298
      @sithabelamandlawenkosiwodu6298 2 роки тому

      It's just a road.

    • @CareEquip
      @CareEquip 2 роки тому +1

      @@sithabelamandlawenkosiwodu6298 unfortunately safety does not take a holiday and can never be under estimated. In fact construction is responsible for some of the most incident and accidents.

  • @Potondiwe
    @Potondiwe 2 роки тому +2

    Nice 👍

  • @dhereckmherekumombe1945
    @dhereckmherekumombe1945 2 роки тому +1

    Vamwe togara tiripo live pakugadzirwa apo truth be told mari yakataurwa nezvikuvakwa marara chaiwo the progress is very substandard

  • @ntombizodwancube3365
    @ntombizodwancube3365 2 роки тому +2

    Murikutoshama muri I kuti this time akazama Chokwadi after 43 years vanhu imwi hamusi serious. Ngaapinde mukomana

  • @N.M.M1998
    @N.M.M1998 2 роки тому +3

    Bridge 2 iro hmmmm handiritembi anyway nice work

    • @MillonEnt
      @MillonEnt 2 роки тому

      it is not 90 % like she is saying

    • @michaelnyabanga7956
      @michaelnyabanga7956 2 роки тому

      Unopenga 😂😂😂 hauna form 4 apa hau thembi zvinhu zvirikuitwa nema engineer

    • @N.M.M1998
      @N.M.M1998 2 роки тому

      @@michaelnyabanga7956 😂😂😂as if you know my results. Kuita engineer doesn't mean that wakugona zvese, they also make mistakes. Anyway I'm sure ndakadzidza kukupfuura

  • @tapiwamaweni4329
    @tapiwamaweni4329 2 роки тому +1

    Just a quick one on bridge 2 why did they leave that big open space

    • @michaelnyabanga7956
      @michaelnyabanga7956 2 роки тому

      Finally someone anobvunza zvinhu zvinotonga zvine basa 😂😂😂😂

    • @tapiwamaweni4329
      @tapiwamaweni4329 2 роки тому

      @@michaelnyabanga7956 hauna kupawonawo here mota ikabuda muroad inono pinda pane that’s space, kuita tuma strip twe road

  • @kundaimuchemwa7252
    @kundaimuchemwa7252 2 роки тому +4

    Ndizvo zvavanodai vachiita makoreose aya nekuti ibasa re government kugadzira nyika hazvisi zvekubvatati tinofanira kumuvhotera izvozve plus the guy is 87 years old. This year ava kupinda mu 88 saka tingarambe tichitungamirwa nemunhu achembera kudaro here .

  • @magdaline6383
    @magdaline6383 2 роки тому +6

    It looks thin Is it going to hold the traffic?

  • @proactiveafrica323
    @proactiveafrica323 2 роки тому +1

    Brick by brick, thank you for update madam. the only thing i dont i like in the season we are in is elections, our elections creates tensions and disrupt progress mood.

  • @trmangena2463
    @trmangena2463 2 роки тому

    This looks fantastic ,to the haters l say even when you build a house it looks like you are using old bricks until you finish then it can show

  • @oswellmuranda4721
    @oswellmuranda4721 2 роки тому +3

    Plz next time an update should be much better than what is inside of this vedio.... Zvagai vanogona kutsanangura kwete kungonongedza mudenga zvandaona

  • @PeterChigombe-kl6ug
    @PeterChigombe-kl6ug 10 місяців тому

    Nguva ndiyo irikureba hazvisi kupera why zvinoda maprojects aya anoda kupihwa macompanies ekunze ane capacity uye vanovaka zvakanaka

  • @cfarp7160
    @cfarp7160 2 роки тому +3

    Thickness yemaslabs ayo bho here amana, maheavy trucks anopfuura here apo

    • @michaelnyabanga7956
      @michaelnyabanga7956 2 роки тому

      These are engineers building ma civil ma architectural etc saka be at peace wangu

  • @washingtonmadishi6317
    @washingtonmadishi6317 2 роки тому +2

    Please show us drone images

  • @deethecoder4335
    @deethecoder4335 2 роки тому

    Kindly include drone footage next time … good work

  • @tinotendamuguti5919
    @tinotendamuguti5919 2 роки тому +4

    Ed chinenge chiine ma points this time gegege chibaba ichi

  • @mikemukanyima5853
    @mikemukanyima5853 2 роки тому +5

    Why are people walking all over the construction site..Shouldn't it be off limit.They should put a perimeter fence.

    • @GeliteMultimedia
      @GeliteMultimedia 2 роки тому

      Wanted to say the same thing. The whole site should be inaccessible to the public..safety 1st means guarding against anyone without proper safety gear from walking up and down construction sites

    • @hoto31
      @hoto31 2 роки тому

      I Zim yatisiyanei nekune dzimwe nyika manje manje uchatozoona pane kamwe karoad ipapo ikaramba yakadaro kana kutozoona pakuitwa base remjolo

  • @richardchange6278
    @richardchange6278 2 роки тому +2

    Slowly but sure well done

  • @liamwilliam6650
    @liamwilliam6650 2 роки тому

    My Zim sunshine 🌄

  • @TinasheShambare-b9f
    @TinasheShambare-b9f 8 місяців тому

    Let me keep my comment ndingatsomwe hangu yoooo pane nyaya basa riripo apo ko kuzoti but ratopera manje ummm

  • @geniushomwetv9793
    @geniushomwetv9793 8 місяців тому

    ❤ let's appreciate the government work

  • @mwanawemuporofita5610
    @mwanawemuporofita5610 2 роки тому

    So how many bridges in total will be there?

  • @jonathanmbedzi9790
    @jonathanmbedzi9790 Рік тому

    Missing developments in Mbudzi Interchange.

  • @thekelvins3456
    @thekelvins3456 2 роки тому

    huhhh ndezvana kamba izvi since when

  • @nmdread
    @nmdread 2 роки тому +2

    Zanu PF mouthpiece

  • @rogerchanda
    @rogerchanda 2 роки тому

    Buza ngesintu

  • @clevertmuzondo7125
    @clevertmuzondo7125 2 роки тому

    We also wany drone footages for a better view of the progress

  • @MrRastafari01
    @MrRastafari01 2 роки тому +1

    I will be honest, these bridges look unsafe. I am pulling for Zimbabwe to make it happen but you need an ARCH BRIDGE for safety. It is a 200+ year old technic. Let’s wake up people, no short cuts trying to steal money. Build real things.

  • @SolomonBanda-e6x
    @SolomonBanda-e6x 7 місяців тому

    Regai ndiseke hangu 😂😂😂😂😂😂😂😂😂😂😂😂😂

  • @cakeangel304
    @cakeangel304 2 роки тому

    tip of the iceberg. i agree there is much positive impact brought by the construction of this bridge but on the other hand this is another way of diversifying tax payers finances into the big figures pockets which are already full. Its taking time to complete this little project and the projected figures mmm are too much.

  • @victorchiponda1134
    @victorchiponda1134 2 роки тому

    The truth is that ,,the project is really amazing but ,,,the runners are too slow the way they are operating is really slow If they kept on operating with this pessy we can even enter in 2030 without being completed

  • @georgezibuye1062
    @georgezibuye1062 2 роки тому +2

    I can see the purpose.

  • @mosesmuriri594
    @mosesmuriri594 2 роки тому

    Why is it those kids are passing in out without safety boots 👢

  • @eslinmatema7104
    @eslinmatema7104 2 роки тому +3

    Aaah this tym chakazama ED

  • @benmorata9237
    @benmorata9237 2 роки тому

    Ummmm tha😂t 90% complete bridge looks tiny and old fashioned. I don’t think it’s strong enough.

  • @Linksecuritysystem
    @Linksecuritysystem 2 роки тому +1

    Bridge 2 it's poorly built especially the top part.... look at the edges of the bridge ....

  • @talentshumba8875
    @talentshumba8875 2 роки тому +3

    Ed pfeee

  • @zodwancube3874
    @zodwancube3874 2 роки тому +4

    Who is gonna fix those roads in Mathabeleland cause everything they are fixing in Mashonaland

  • @tapiwatamayi985
    @tapiwatamayi985 2 роки тому

    What's so special about a bridge they are necessary and should have been built long ago why it's taking 18months yet other countries can do an interchange in 8weeks shows how behind we are it's nearly two years of bad traffic I use the road and it's a nightmare you can't commerce and trade on slow down for two years its unacceptable 18months seriously 😳