WalesRails
WalesRails
  • 20
  • 92 640

Відео

Cardiff Bay line transformation works - Late November 2023 - South Wales Metro
Переглядів 3,9 тис.7 місяців тому
Cardiff Bay line transformation works - Late November 2023 - South Wales Metro
Treherbert Line transformation works October 2023 - South Wales Metro
Переглядів 10 тис.7 місяців тому
Drone footage of Treherbert Line transformation works taken in October 2022
398 010 Tram-Train Delivery at Taff's Well Depot | South Wales Metro
Переглядів 2,3 тис.Рік тому
398 010 is delivered to Taff's Well Depot on July 6th 2022
South Wales Metro | 398 Tram-Trains' first test runs
Переглядів 31 тис.Рік тому
The very first test runs of Class 398 Tram-Trains which will form the backbone of the South Wales Metro and transport passengers from Treherbert, Aberdare & Merthyr Tydfil to Cardiff Central and Cardiff Bay via both Llandaf and the "City Line" route though Fairwater, with future "metro" extensions seeing the units trundle on street as trams though Callaghan Square and a redeveloped Cardiff Bay ...
Tram-Train Metro vehicles arrive at Taff's Well Depot - South Wales Metro
Переглядів 7 тис.Рік тому
398 007 (Stadler Citylink Tram-Trains) arrives by road at Taff's Well Depot, the first of 36 units to be delivered which will form services on the South Wales Metro from Treherbert, Aberdare & Merthyr Tydfil to Cardiff Central & Cardiff Bay, possibly one day to Cardiff Parkway via Newport road. Apologies for the complete disappearance of new videos on this channel, I've been very busy and not h...
We rode the Elizabeth Line!
Переглядів 3742 роки тому
On the 4th of June Me and Jamie rode the Elizabeth Line for the first time. 4:20 is the timestamp to skip to if you want to avoid the travel vlog content apologies is footage is a bit sporadic, I wasn't really intending on making a big video out of it and forgot to record some key parts in the timeline like arriving back at my home station and practically the entire train journey to Southampton...
Track switches are in! - Taff's Well Depot Construction Update June 2022 - South Wales Metro
Переглядів 12 тис.2 роки тому
June's construction update from Taff's Well Depot and Station being built by Transport For Wales & contractor Amey for the South Wales Metro Filmed in June 2022 Last Month's Update: ua-cam.com/video/ua_ZraqHbvg/v-deo.html Taff's Well Depot playlist: ua-cam.com/users/playlistlist=PLiVnIUPPlvZZmVtorXSUWVAID96Ln89Fe TfWs update: ua-cam.com/video/7SUIY-Gp77U/v-deo.html
Metrolink being my new favourite thing for 5 minutes
Переглядів 4202 роки тому
Filmed on One Plus Nord 2 & iPhone 13 Pro
Steelwork is up! - Taff's Well Depot Construction Update April 2022 - South Wales Metro
Переглядів 1,5 тис.2 роки тому
A short update from Taff's Well Depot and Station being built by Transport For Wales & contractor Amey for the South Wales Metro Filmed in April 2022 Last Month's Update: ua-cam.com/video/aNOSvSVBiwA/v-deo.html
I got a train all to myself on the City Line
Переглядів 8452 роки тому
The City Line is a commuter railway line in Cardiff that runs between Radyr and Cardiff Central via Fairwater It receives just 2 trains per hour so sees very little ridership TFW operates the line with diesel multiple units of Sprinter classes 150 and 153. On 16 July 2012 plans the Department for Transport announced plans to electrify the line. This will require new electric multiple unit train...
Electrification Work Begins on the South Wales Metro
Переглядів 7 тис.2 роки тому
Pantograph video courtesy of ua-cam.com/channels/oc-HO6_N2QstGTjIMX7_Bw.html
Cardiff Wood Street & Central Square Pedestrianisation and Public Space development Walk around POV
Переглядів 6692 роки тому
Cardiff Wood Street & Central Square Pedestrianisation and Public Space development Walk around POV
Taff's Well Depot Construction Update March 2022 - South Wales Metro
Переглядів 2 тис.2 роки тому
A short update from Taff's Well Depot and Station being built by Transport For Wales & contractor Amey for the South Wales Metro Filmed in March 2022 Apologies for the awful audio, production quality will improve with time.
15 Minutes Of Trains On The Valley Lines in Cardiff
Переглядів 1,6 тис.2 роки тому
The Sound of Diesel Engines, Squealy Brakes, Passenger Announcements, horns, and wheels passing over track joints, become immersed in this quarter of an hour film of the trains on the Merthyr line in Cardiff. This video is meant as a sort of archive of footage from the railways in and surrounding Cardiff, recorded in February 2022. This video's primary focus is the Merthyr Line (yes, I know it ...
Eastleigh Lakeside Steam Railway
Переглядів 1082 роки тому
Eastleigh Lakeside Steam Railway
Taking a Ride on Cardiff's New Electric Buses and Getting the South Wales Metro Home
Переглядів 5 тис.2 роки тому
Taking a Ride on Cardiff's New Electric Buses and Getting the South Wales Metro Home
I went on a train!
Переглядів 1072 роки тому
I went on a train!
A walk around Aberthaw Power Station
Переглядів 6163 роки тому
A walk around Aberthaw Power Station

КОМЕНТАРІ

  • @dillonyeardley6270
    @dillonyeardley6270 5 годин тому

    I see transport for Wales copied the Sheffield supertram

    • @WalesRails
      @WalesRails Годину тому

      @@dillonyeardley6270 The Class 399 units that operate the Sheffield Super-tram do indeed feature the same design foundation from the same manufacturer but they are completely different in all other aspects. TfWs 398s are high floor, the supertram 399s are low floor. TfW’s 398s have 25kv and long range battery packs for traction, Supertram has 750v & 25kv but no batteries. The wheelsets and powertrain is also completely different. TfW’s Tram-Trains will be operated on primarily heavy rail lines with little sections of tramway, while supertram is predominantly tramway and only a little bit heavy rail. TfW’s 398’s are closer to Manchester Metrolink than Supertram

  • @Tata22334
    @Tata22334 Місяць тому

    Sounds a bit like a 377

  • @carolynjones6524
    @carolynjones6524 Місяць тому

    These trains will be in shit conditions in a couple of weeks

  • @PeterSteele2010
    @PeterSteele2010 2 місяці тому

    Very impressive.

  • @andrewtwinam8528
    @andrewtwinam8528 2 місяці тому

    A Metro for Cardiff and the Valleys. Nothing for the South East Valley, which is typical for Cardiff Bay. The closet we have come is a new car park at Pontypool Road, which is still closed a year after completion.

  • @user-gt4ym3fe6p
    @user-gt4ym3fe6p 4 місяці тому

    Polnocna 7 8

  • @idontknow12383
    @idontknow12383 4 місяці тому

    "I'm Tramsexual" ahh train

  • @TrenyCwm
    @TrenyCwm 5 місяців тому

    Great to see all the investment to this route. Hard to believe now that in the very different transport climate of the early 1980s the borough council proposed to build a road over the route. BR singled most of it in 1981. By the late 80s a complete turnaround had taken place and BR sought to expand services in the area. Cash strapped the best they could do was to build a small passing loop at Ystrad to improve service frequency.

  • @davidevans389
    @davidevans389 5 місяців тому

    What a shame the line doesn’t actually reach the bay. A wasted opportunity

  • @andrewdyton580
    @andrewdyton580 5 місяців тому

    I've heard that the line is ment to reopen on February the 12th, so hopefully not to long now.🎉.

  • @RobloxTrainspotting
    @RobloxTrainspotting 6 місяців тому

    Almost Sounds Like The Class 377

  • @DavidShepheard
    @DavidShepheard 6 місяців тому

    Nice video. I think you should chance your arm and approach the contractor and Transport for Wales and ask if you can have a site visit. Point them at the videos that Dawlish Beech Cams have been making about the rebuilding of Dawlish Station. You (and they) have a one-time opportunity to get the transformation of the South West Metro Lines documented, for future historians. They might need to get you a bit of site safety training and give you a baby-sitter to make sure you don't accidentally put yourself at risk, but if they can get you on-site when some work is happening, and get you some nerd-level information about specific bits of work, they can use you to help pass on progress information to local people.

  • @claudiamaggio5683
    @claudiamaggio5683 6 місяців тому

    *promo sm* 😞

  • @user-bv5lc1nf5d
    @user-bv5lc1nf5d 7 місяців тому

    Not bad, hopefully the line to Ferndale from Porth can reopen sometime as well as extensions to Blaenrhonnda and Hirawun.

  • @Lodai974
    @Lodai974 7 місяців тому

    From a purely technical point of view it is an LRT not a metro...

  • @LGCT
    @LGCT 7 місяців тому

    Nice Video. The Trams would of been better if they were Built by Alstom, because the Motors in these New Trams sound boring.

  • @TheMichaelWilcock2016Railways
    @TheMichaelWilcock2016Railways 7 місяців тому

    One of the best "Valley Lines" videos I've seen this year. Well done. I think at 80 yrs I'm too old to learn to use a drone. Mike "Rail in Wales"

  • @GustavSvard
    @GustavSvard 7 місяців тому

    All that being done with just a 9 month closure? honestly, that's pretty impressive. Also, going from 30 min frequencies to 15 min frequencies (with faster trains as well), that's a game changer. Missing the train means getting home in 15+50 min instead of 30+65 min. That's a 30 minute difference!

  • @iantobanter9546
    @iantobanter9546 7 місяців тому

    Hopefully now Sir Beer's given Dripford his marching orders, Cardiff Bay can reverse their spiteful no new roads policy and sort out the M4and Bryn Gla s tunnels

  • @iantobanter9546
    @iantobanter9546 7 місяців тому

    Why no reference to the Treorchy section? Is the Tylecoch bridge being kept or replaced by a level crossing?

  • @andrewbutler6477
    @andrewbutler6477 7 місяців тому

    Remember the valley lines back in the 70s my late dad was a guard on the 116 dmus the service was on knees Merthyr was 2 hourly and the rhymney bargoed section came very close to closing

  • @keithhitchings8911
    @keithhitchings8911 7 місяців тому

    I remember when St John's had 4 platforms and a signal box and a siding on before what is now the flyover

  • @johnjephcote7636
    @johnjephcote7636 7 місяців тому

    That is what we could do with between Sheffield and Lincoln.

  • @michaelpoole587
    @michaelpoole587 7 місяців тому

    Long distances between stops

  • @neilcrawford8303
    @neilcrawford8303 7 місяців тому

    Interesting video. Only visited the area once (Pontypridd) in 2019, during the twilight of the Pacers. It will be interesting to see the impact the modernisation has both to journeys to Cardiff, but also to the towns along the routes. It should certainly make them more viable and appealing to commute from for those who work in Cardiff. Keep the video updates coming, thanks.

  • @LePondLaDuck
    @LePondLaDuck 7 місяців тому

    Around the 1:45 mark, is that second track on the bridge towards Queen St new? Why has that been laid? I thought the double track was to connect to Central station?

    • @speakerdestroyer425
      @speakerdestroyer425 7 місяців тому

      From what I understand the second line there is just to increase capacity along the Butetown branch line. The connection from the line to central is a separate project which forms part of Cardiff Crossrail, with funding coming largely from Cardiff council.

    • @simonadams71
      @simonadams71 7 місяців тому

      The track is being doubled to Queen Street, there is no way of connecting to Central at the moment.

  • @anthonypowell5665
    @anthonypowell5665 7 місяців тому

    Big shake up of the valley lines network from may 2024. All merthyr and aberdare services running loops around Cardiff via either landaf or fairwater

  • @MervynPartin
    @MervynPartin 7 місяців тому

    It is very good to see the progress, but I really hope it gets completed and running whilst I am still able to travel back to my old homeland. As a kid in Cardiff, I always thought it strange that there were electric trains in other parts of the country, but not in Wales. If I get a chance, I will try the system out, although the Taff Vale lines are my primary interest, as I used to commute to Treforest Estate by train when my motorbike was out of action (luckily, there wasn't that silly 20mph speed limit in those days).

    • @TheHoveHeretic
      @TheHoveHeretic 7 місяців тому

      Oh, but there WAS an electric railway ..... the Swansea & Mumbles, a most significant company in the annals of railway history. In 1804, it carried the world's very first scheduled passenger rail services (horse drawn), then after a half century of steam operation, was sparked up in 1928/9. Closed in 1960, with traffic lost to roads, there are those who believe that those same, now constipated roads mean the time is ripe for it's return.

    • @MervynPartin
      @MervynPartin 7 місяців тому

      @@TheHoveHeretic OK- you got me there! Even though the stock looked like trams, I know that Swansea folk called them trains and it was officially a railway. A sad loss, but perhaps to be expected as the final owners were a bus company. There were also a couple of power stations in South Wales that used electric locos- Upper Boat and Cardiff Power Stations.

    • @TheHoveHeretic
      @TheHoveHeretic 7 місяців тому

      ​@@MervynPartin Most definitely "tramish" in appearance .... OK, they were larger than average, high capacity trams, dammit!! One survived at the Middleton Railway (Leeds) but, most unfortunately, was heavily vandalised before being lost in a fire several years ago. Of the many schemes to reopen Welsh railways, traffic conditions favour a revived SMR ..... the condition of the economy, not so much.

  • @ieuanjones7436
    @ieuanjones7436 7 місяців тому

    It looking good keep up but there are some spots of the electric lines asnt gone up i hope they going up also why aren't we see tonypandy on the electric line.

    • @thesenamesaretaken
      @thesenamesaretaken 7 місяців тому

      I don't know about specific areas but from what I understand the electrification is discontinuous to avoid the engineering works that would be needed in areas where space is restricted. I can see the logic behind the decision but I have reservations about the trains being more complex than they would be otherwise - if the dual mode and especially the triple mode trains end up having a high rate of failure and a high cost to repair then it could have been false economy. Also the metro lines intersect the main line, which is owned and maintained by Network Rail, and apparently TfW would rather keep their electrification work separate from whatever Network Rail is doing (or not doing lol)

    • @MervynPartin
      @MervynPartin 7 місяців тому

      @@thesenamesaretaken That is also as I understand it, but it has introduced complexity in areas where it doesn't make sense. Short neutral sections between Network Rail and TfW systems would enable the trains to keep the pantographs raised through Cardiff Central and up the gradient to Queen Street. Neutral sections are used throughout Network Rail anyway, and European nations have managed all right for years (long before the EU). The electricity has to be paid for regardless of TfW or Network Rail supply.

    • @chris8405
      @chris8405 7 місяців тому

      Electric trains in general are far less complex and more reliable than diesel trains. Adding batteries does add a degree of complexity to basic electric trains, however in this case it has allowed a viable business case to be made for the valleys, and the 398s will also be able to operate on-street without needing wires - just like many trams do today. These tram-trains benefit from the technology advances seen in the last decade.

  • @ieuanjones7436
    @ieuanjones7436 7 місяців тому

    that's doing a great job but there are some spots are missing electric lines in some areas are they going up or staying empty.

    • @juliansadler6263
      @juliansadler6263 7 місяців тому

      They are putting in 'discontinues electrification'. In some cases because of a low bridge - but why not just a neutral section - but in other places apparently just for the sake of it.

  • @thesenamesaretaken
    @thesenamesaretaken 7 місяців тому

    That final pan was pretty aesthetic, nice. But it makes me a bit sad to see a rail enclosed on both sides by roads.

  • @ieuanjones7436
    @ieuanjones7436 7 місяців тому

    only thing iam stuck with how can the new train-trams get up to treherbert in 15 minutes because it gets from cardiff to treherbert in 1 hour and 35 minutes sometimes.

    • @WalesRails
      @WalesRails 7 місяців тому

      15 minute frequencies, so currently there are two trains per hour with the longest wait being 30 minutes, with the improvements there will be four trains per hour with the longest wait being 15 minutes. The current journey time end to end between Treherbert and Cardiff is 1hr 5mins, this will drop to around 50 minutes with the new trains

    • @ieuanjones7436
      @ieuanjones7436 7 місяців тому

      @@WalesRails thank you mate now i do understand that now also why is it that you only stopping at Treherbert then coming up to the old train station at Tynewydd the last stop of that line because we still got the platform where the trains use to stop.

  • @geoffisaac3511
    @geoffisaac3511 7 місяців тому

    The trains look good now all we need is a company to run them because transport for Wales couldn't run a piss up in a brewery I used to think Arriva Trains where bad but not anymore .And also are these trains allowed to go over 20mph 😂

    • @WalesRails
      @WalesRails 7 місяців тому

      TfW's Issue is that large swathes of their fleet were set to go off lease back to their ownership company or to other UK train operators once they were properly rolling out new stock, the new stock was delivered late and in a poor condition by the manufacturer and TfW were left with a massive unit shortage which has led to dangerous overcrowding, cancellations and reliability issues. TfW is far from perfect, but a lot of their issues are down to what they inherited from Arriva and the UK-wide rolling stock issues and underfunding.

    • @WalesRails
      @WalesRails 7 місяців тому

      Also 20mph is being talked about? It was voted in by all parties in the Senedd and was in Manifestos that the public voted for, for the vast majority of the day your overall journey duration will be dictated by the traffic on the roads, going 10mph faster for 30 seconds before having to stop in traffic again isn't going to do much. If a child runs out into the road, in the distance it would take for a car at 20mph to make a complete stop, a car at 30mph would hit the child at 24mph. I do think there should be more exemptions but the Welsh Government is already running consultations for these areas.

  • @Pizzpott
    @Pizzpott 7 місяців тому

    I did a double-take when I saw the word 'Treherbert' in the title of a reccomended video....I live in Tynewydd so have been watching the progress of this since it started. (but then again I remember seeing then build the Ynyswen platform when I lived there in the 80's too.) If you see a silver car doing 30 or more, it's me.....

    • @WalesRails
      @WalesRails 7 місяців тому

      Ha ha!, I must admit this video is already quite out of date with how much work has progressed, you can expect a more up to date version from this channel in a few days time. TfW's industry consultation on the new electric trains concludes on January 25th so you might see some fancy new electric trains in your neck of the woods shortly after the line reopens in February.

  • @adventureneering9149
    @adventureneering9149 7 місяців тому

    Enjoying your update videos. Would you know when/if the Valley lines at Cardiff Central are due to be electrified or will that be battery operation?

    • @WalesRails
      @WalesRails 7 місяців тому

      Thank you! In and around the city centre is going to be a battery power zone due to the increased cost of electrifying near close structures and track junctions, as well as to keep the Valley Lines Electrification completely separate from the Mainline Electrification for operational reasons, Cardiff Central and surrounding is owned by Network Rail, not TfW, and because of concerns from the universities about their sensitive lab equipment being affected by EMF emission from overhead lines. www.openrailwaymap.org is a fantastic resource, set to "Electrification" in the top left and have an explore of all the Catenary Free Sections (CFS) indicated in black.

    • @adventureneering9149
      @adventureneering9149 7 місяців тому

      @WalesRails looks like a great resources. Thank you very much.

  • @ieuanjones7436
    @ieuanjones7436 7 місяців тому

    they done a lot work over the 9 months when the line to treherbert going on when it been close 😊

  • @b9y
    @b9y 8 місяців тому

    It's such a shame they won't utilise these tram-trains on the roads, and an even bigger shame that we won't see them on viable routes like the Carmarthen to Aberystwyth line re-opening proposal. I was so excited for this Metro idea but to be honest, the lack of line proposal from Ebbw Vale to Swansea really let's it down. Instead it's just another round of "Look how many lines go to Cardiff!".

  • @laurenceskinnerton73
    @laurenceskinnerton73 9 місяців тому

    Interesting.

  • @jasongnrfan7374
    @jasongnrfan7374 9 місяців тому

    They aint been tested since

    • @jaystocky
      @jaystocky 7 місяців тому

      They’ve been tested a significant amount since this was uploaded :)

  • @amo-kd9cn
    @amo-kd9cn 9 місяців тому

    Which line is this going to be used on?

    • @WalesRails
      @WalesRails 9 місяців тому

      Rhondda & Merthyr Valley lines, from termini at Treherbert, Aberdare and Merthyr Tydfil through Pontypridd to Radyr and then via both the Cathays route and the City Line route via Ninian Park to Cardiff Central and Cardiff Bay

    • @amo-kd9cn
      @amo-kd9cn 9 місяців тому

      @@WalesRails thanks! does the city line include up to coryton?

    • @WalesRails
      @WalesRails 9 місяців тому

      @@amo-kd9cn With the new trains there will be a massive service shake up. The Radyr-Coryton City Line shuttle will be no more, being replaced by Radyr - Cardiff Central via fairwater being operated as a branch of the valley lines and Coryton services shuttling to Penarth instead, with class 756 FLIRT rolling stock

  • @dalankamulyan5263
    @dalankamulyan5263 9 місяців тому

    Cool video!

  • @Tridhos
    @Tridhos 10 місяців тому

    I walk past the Bay line almost every day, lots of machines parked everywhere then suddenly a days activity and then nothing for another couple of weeks. It reminds me of some builders I used to read about, first they come in and create a mess then you rarely see them for months.

    • @jaystocky
      @jaystocky 10 місяців тому

      They currently have all of the new platform sections on-site it seems. Work slowly progressing it seems indeed!

  • @thegreypenguin5097
    @thegreypenguin5097 11 місяців тому

    why is the bumper yellow now!!??

    • @jaystocky
      @jaystocky 10 місяців тому

      Due to some issues with the top headlights and how they are required to have a non-yellow front they have temporarily yellowed the noses of each train, not permanent:)

  • @JacobsTrainVideos
    @JacobsTrainVideos 11 місяців тому

    Cool video! Dont understand though why rapid transit trams have high desnity 2+2 airline and group seat layout though??

  • @NUMBERBLOCK20.75
    @NUMBERBLOCK20.75 11 місяців тому

    Bus 409 (44)

  • @NUMBERBLOCK20.75
    @NUMBERBLOCK20.75 11 місяців тому

    0:10

  • @leemeader5109
    @leemeader5109 11 місяців тому

    You should go there now thay have done so much and you can see the trams

  • @TheDancingGamer01
    @TheDancingGamer01 11 місяців тому

    Its mad how these 'metro' seats are the same as the 'intercity' seats (8XX)

    • @jaystocky
      @jaystocky 10 місяців тому

      Just shows how poorly thought out those trains were!

  • @letrainavapeur
    @letrainavapeur 11 місяців тому

    Good to see some movement at last, the whole project is well behind schedule.

  • @djlewis5149
    @djlewis5149 Рік тому

    Trouble is TFW are so unreliable. Arbitrary and frequent cancellations and late running. Once you’ve missed a few meetings you’re back in the car

    • @jaystocky
      @jaystocky Рік тому

      Yep, but that's down to the very limited amount of trains they can run. They don't have enough stock to just replace a service if a fault is developed.

    • @djlewis5149
      @djlewis5149 Рік тому

      @@jaystocky that doesn’t really explain the constant late running and cancellations. The last one I experienced was for ‘shortage of drivers’.

    • @jaystocky
      @jaystocky 11 місяців тому

      @@djlewis5149 I didn't say all cancellations were as a result of poor train allocation.

    • @djlewis5149
      @djlewis5149 11 місяців тому

      @@jaystocky ‘that’s down to the limited amount of trains they can run’ that sounds like what you’re saying

    • @jaystocky
      @jaystocky 10 місяців тому

      @@djlewis5149exactly, they currently do not have a great enough number of trains, which is why we badly need these tram-trains out on the network for customers as soon as possible.