18th Edition Amendment 3 Change
18th Edition Amendment 3 Change
Here I give my thoughts on the proposed change in the draft for public comment for amendment 3 of the 18th edition.
This video is intended for electricians and those working in the electrical industry in the UK
All thoughts are my own
It is important to check for any other requirements that may apply in addition to any requirements that I discuss in this video.
Переглядів: 1 096

Відео

R1+R2 Calculation for SWA Cables
Переглядів 5897 місяців тому
R1 R2 calculation for SWA cables. WATCH NEXT: How to calculate R1R2 ua-cam.com/video/WnxvYmwGHvY/v-deo.html Using SWA as CPC ua-cam.com/video/1jjs19IAhUo/v-deo.html This video is intended for electricians and those working in the electrical industry in the UK All thoughts are my own It is important to check for any other requirements that may apply in addition to any requirements that I discuss...
Open Pen Fault News-Draft for public comment has been released
Переглядів 16411 місяців тому
Open Pen Fault News-Draft for public comment has been released. Watch next: Can a Pen Fault Device be used for hot tubs? ua-cam.com/users/live2hrD8KlzcpQ?feature=share This video is intended for electricians and those working in the electrical industry in the UK All thoughts are my own It is important to check for any other requirements that may apply in addition to any requirements that I disc...
Ring Circuit Q&A Does a Ring Circuit have to be 32 Amps?
Переглядів 1,4 тис.Рік тому
Ring Circuit Q&A Does a Ring Circuit have To Be 32 Amps? This video is intended for electricians and those working in the electrical industry in the UK All thoughts are my own It is important to check for any other requirements that may apply in addition to any requirements that I discuss in this video. Where I refer to wiring regulations, I refer to BS7671 Requirements for electrical installat...
Adding Electric Heating to MAXIMUM DEMAND Calculation
Переглядів 309Рік тому
Adding electric heating to maximum demand calculation This is a shorter version of a previous video about adding electric heating to my maximum demand calculation. To watch the longer video please see the link ua-cam.com/video/6Vo5_XU2gww/v-deo.html This video is intended for electricians and those working in the electrical industry in the UK All thoughts are my own It is important to check for...
Electrician Q&A Trailer
Переглядів 119Рік тому
Electrician Q&A Trailer
Maximum Zs in BS7671
Переглядів 2,6 тис.Рік тому
Maximum Zs in BS7671
Where can I find changes in Wiring Regulations 18th Edition Amd 2
Переглядів 300Рік тому
Where can I find changes in Wiring Regulations 18th Edition Amd 2
What are the options for surge protection in a split load consumer unit?
Переглядів 774Рік тому
What are the options for surge protection in a split load consumer unit?
How I remember IP ratings-Electrician explains
Переглядів 439Рік тому
How I remember IP ratings-Electrician explains
Electrician explains how to tell if bonding is required
Переглядів 7332 роки тому
Electrician explains how to tell if bonding is required
Electrical testing to latest wiring regulations
Переглядів 9862 роки тому
Electrical testing to latest wiring regulations
Is there an Electricity shortage in west London? Electrician reacts
Переглядів 1962 роки тому
Is there an Electricity shortage in west London? Electrician reacts
Electrician day off in London
Переглядів 1302 роки тому
Electrician day off in London
Current carrying capacity electrical calculation tips
Переглядів 4,8 тис.2 роки тому
Current carrying capacity electrical calculation tips
Maximum demand 5 tips for electricians
Переглядів 6 тис.2 роки тому
Maximum demand 5 tips for electricians
Maximum Zs-calculating maximum cable length
Переглядів 1,1 тис.2 роки тому
Maximum Zs-calculating maximum cable length
Do we need surge protection in a house? Update to 18th edition amendment 2
Переглядів 1,3 тис.2 роки тому
Do we need surge protection in a house? Update to 18th edition amendment 2
EICR codes in on-site guide to BS7671
Переглядів 2,2 тис.2 роки тому
EICR codes in on-site guide to BS7671
How can I do electrical calculations if I don't know the Ze?
Переглядів 2412 роки тому
How can I do electrical calculations if I don't know the Ze?
18th edition where can i find the reason for the requirements?
Переглядів 2222 роки тому
18th edition where can i find the reason for the requirements?
Working in the electrical industry What I wish I knew
Переглядів 4172 роки тому
Working in the electrical industry What I wish I knew
Wording in 18th edition for electricians to be aware of
Переглядів 4372 роки тому
Wording in 18th edition for electricians to be aware of
Where does Part P apply? Electrician explains
Переглядів 1,7 тис.2 роки тому
Where does Part P apply? Electrician explains
Bonding to outbuildings 18th edition 2022 amendment 2
Переглядів 2,4 тис.2 роки тому
Bonding to outbuildings 18th edition 2022 amendment 2
Changes to Testing in 18th Edition 2022 Wiring Regulations
Переглядів 1,3 тис.2 роки тому
Changes to Testing in 18th Edition 2022 Wiring Regulations
18th edition 2022 update to wiring regulations
Переглядів 3,7 тис.2 роки тому
18th edition 2022 update to wiring regulations
Grey areas for Electricians to be aware of
Переглядів 2,1 тис.2 роки тому
Grey areas for Electricians to be aware of
5 myths about electrical work in the UK
Переглядів 5962 роки тому
5 myths about electrical work in the UK
Short circuit current calculation walkthrough for a single phase circuit
Переглядів 2,2 тис.2 роки тому
Short circuit current calculation walkthrough for a single phase circuit

КОМЕНТАРІ

  • @ef7480
    @ef7480 9 днів тому

    I'll second the first comment (genuinely). One tip for you if I can. When filming yourself, keep the eye level on the top third line ('rule of thirds') not in the centre👍

  • @gavinsartain5885
    @gavinsartain5885 12 днів тому

    principle should be for a metallic exposed part connected to the installation. And RCD at 30mAl provides required protection.

  • @benharris3387
    @benharris3387 16 днів тому

    Adibiatic equation. That particular one is for correctpy sizing the protective conductor. Can also be transposed for thermal withstand under fault conditions where T= S²K²/I² I always loved the matatical side of electrical engineering. If you can understand that then you can understand where a lot of regulations get their figures from These videos will be golden for any learner or as a refresher. Keep up the good work! 💪

  • @merv159
    @merv159 18 днів тому

    Great video, thank you. What would the overall maximum demand be across all 3 phases to record on the certificate for the example you gave?

  • @avfczoff
    @avfczoff 19 днів тому

    I was hoping you would have made it a lot clearer. Sorry to say it wasn’t very clear

  • @droidism
    @droidism Місяць тому

    6K views over a 2-year-period and nobody bothered to thank you for your tips... Thanks for these, will write them down and keep them in mind.

  • @Baggiolyful
    @Baggiolyful Місяць тому

    C3- enclosure made from non-combustible material C3- No RCD protection on socket outlets (C2 if serving outdoor equipment) C3-No charts/Labelling C3- No RCD protection on lighting C3- No RCD protection on circuits serving a bathroom/shower ( could be a c2 if no supplementary bonding where needed, wrong IP rating of equipment in zones)

  • @ianshaw8501
    @ianshaw8501 Місяць тому

    Regarding unidirectional RCD on a Solar install I would code a C2 as it would be dangerous under fault conditions. Great point

  • @joeds3775
    @joeds3775 Місяць тому

    All manufacturers will make the required breakers. Or go out of business. This is obvious.

  • @AmilaPrasantha-c8p
    @AmilaPrasantha-c8p Місяць тому

    thanks for the clarifcation

  • @johnnyambi550
    @johnnyambi550 2 місяці тому

    Please james provide sca for armored cable also provide examples,will you please

  • @alvina69
    @alvina69 3 місяці тому

    The fact they’ve used fire retardant expanding foam suggest to me, their intention was to in the event of a fire within the consumer unit, to contain it.

  • @Bob-ed3qi
    @Bob-ed3qi 3 місяці тому

    Clear as mud,you are just reading the regs,not giving any useful information

  • @stormdraggon
    @stormdraggon 4 місяці тому

    Yep, I know that already 😂

  • @stephencunningham8850
    @stephencunningham8850 4 місяці тому

    But would the armour and earth cable be in parallel anyhow so that is what you would use surly

  • @rjkelectrical6086
    @rjkelectrical6086 4 місяці тому

    What size main earth if its TT- tails 16mm? I done a eicr- it was 10mm to the rod- it was clipping direct to the brick work and then went under ground for a bit. I assumed it had to be 16mm reading table 54.1 . As there is no mechanical protection on it and goes under ground for a short way. Please can you let us know your thoughts.

  • @CapsosUk
    @CapsosUk 4 місяці тому

    Thanks for the video. You stated that in section 5, k1/k2xs, that its for 2 core 2.5. How would I adapt it for a 4 core 2.5mm 3ph swa ?

  • @pman8130
    @pman8130 5 місяців тому

    Hi James, quick question. In terms of the three phase calculated, if your completing a new installation certificate, would put max demand highest phase or the total max demand of phases?

  • @mikegmarshall
    @mikegmarshall 5 місяців тому

    I can’t understand why your channel isn’t growing. You are one of the most informative designers on UA-cam chap - you have a Great way of making thing simple. spark since 1980

  • @martinburgess2322
    @martinburgess2322 5 місяців тому

    Thanks James. Very informative.definitely need more info on these.😎👍

    • @JamesCurnowElectricalEngineer
      @JamesCurnowElectricalEngineer 5 місяців тому

      Hi Martin, Thank you for your comment. I'm glad you found the video informative. Regards James

  • @gbelectricks
    @gbelectricks 5 місяців тому

    Not sure if if this is a dumb question, but when we do an EICR on a TT install with an “all rcbo” board. If you have 1x solar PV circuit connected on a uni directional rcbo. Doesn’t this mean you just need to swap out 1x uni directional device fitted on the solar PV circuit, for a bi directional device? Or do you swap the lot out? How about EV also, stand alone battery storage or ups? Do these all now need bi directional?? RCD considerations are becoming more of a ball ache… but look on the bright side we have less testing on the bloody things now!!!

    • @JamesCurnowElectricalEngineer
      @JamesCurnowElectricalEngineer 5 місяців тому

      In that situation, I think it would only be necessary to change the rcbo that supplies the PV circuit. The regulation applies to all situation where the current can flow in both directions.

  • @carlosarias9086
    @carlosarias9086 6 місяців тому

    Legend

  • @154electrician
    @154electrician 6 місяців тому

    If i have a circuit thats protected by a 32 amp b type rcbo and the measured zs is say 1.87 ohms can i mark down on the sheet that its getting used as fault protection aswell so the max allowed is 1667 rather than 1.1 ?

    • @JamesCurnowElectricalEngineer
      @JamesCurnowElectricalEngineer 6 місяців тому

      Hi, thanks for your question. In situations where the 30 milliamp rcd protection is used as fault protection, the max zs is 1667. You could mention in the notes on the test sheet that max zs is 1667 ohms as per table 41.5 Regards James

    • @154electrician
      @154electrician 6 місяців тому

      @JamesCurnowElectricalEngineer this was always my thinking but someone was telling me you still need to comply with the 1.1 ohms between the L and N conductors for a short circuit fault to protect the cable , is this correct ? Can you shed any light on this

    • @JamesCurnowElectricalEngineer
      @JamesCurnowElectricalEngineer 6 місяців тому

      It is important to bear in mind that the rcd protection only applies to fault current (line to earth). Overcurrent protection is provided by either an mcb or the overcurrent protection included in the rcbo, and for this to operate quickly enough to protect against short circuit current, it's necessary for the device to disconnect faster than the time taken for the current to damage the cable. So, when relying on rcd protection for the fault protection and disconnection time, it is a good idea to also measure between line and neutral, and if the loop impedance (line to neutral) is less than table 41.3, a type b mcb or rcbo should operate instantaneously. Note, that disconnection times relate to fault current, and there isn't a disconnection time for short circuit current, but it's necessary to ensure the protective device operates quicker than the time it would take for the current to exceed the thermal withstand of the cable. So its necessary to do the Adiabatic equation to check this. When completing a test sheet, the form asks us for max permitted zs (earth fault loop impedance) and there isn't a separate box for short circuit current. So it's necessary to record the information relating to the max zs, but also be aware about the short circuit. I hope this helps. Regards James

  • @kimmythesparks
    @kimmythesparks 6 місяців тому

    awesome!!! well explained 👏

  • @JamesCurnowElectricalEngineer
    @JamesCurnowElectricalEngineer 6 місяців тому

    Please see the link to the longer video ua-cam.com/video/NI6rfqwmy5U/v-deo.html

  • @henryplumb7459
    @henryplumb7459 6 місяців тому

    Seems from internet digging to be 1920s/30s.

  • @razomar-cs7wv
    @razomar-cs7wv 7 місяців тому

    Thank you

  • @scottie.87
    @scottie.87 7 місяців тому

    Great info buddy. Only just come across yourself. was Looking for info on using swa as the cpc as changing my fuse box in the garage (2 core 2.5mm cable already buried and under concrete lol)

  • @pramodgavit7666
    @pramodgavit7666 8 місяців тому

    Best vdo Sir

  • @ningis21
    @ningis21 8 місяців тому

    Can't you just measure the Line and Armour seperately and add them together or measure the Armour end to end and approximate the distance and divide to get a per metre value to see if it complies Zs , R1+R2 etc...wise

  • @liftfan2
    @liftfan2 8 місяців тому

    Just read an article on the professional electrician website, dated 20 Feb 24, that states "Cable entries, such as those often used for back entry into the consumer unit must be provided with suitable sealing methods and may include intumescent gaskets, grommets and/or fire sealants to maintain the degree of fire integrity." The article is called "Metal consumer units in an installation forming part of a TT system earthing arrangement | NICEIC"

    • @JamesCurnowElectricalEngineer
      @JamesCurnowElectricalEngineer 8 місяців тому

      Hi, Thank you for your comment. I've read the article as well, and I agree that in the case of TT systems, it is a good idea to use the fire rated glands for the meter tails, because they provide mechanical protection to the meter tails. I mentioned this is the video. This is particularly important for a TT system, in order to prevent an earth fault occurring between the meter tails and the metal consumer unit. The glands are also useful for maintaining the IP rating of the consumer unit. The point that I make in the video, is that consumer units have been required to be made of non combustible material, or enclosed within an enclosure that is not combustible. However, the regulation introduced in 2015 didn't mention maintaining the fire rating of consumer units. Of course there are also building regulations to bear in mind, which may mean fire rating of the wall that a consumer unit is mounted on could need to have the fire rating maintained. Regards James

    • @liftfan2
      @liftfan2 8 місяців тому

      @@JamesCurnowElectricalEngineer Thanks for the reply and for sharing your knowledge. I’m new to this and there is much to learn! I’ve just installed a CU in my house (notified BC) on a TT system. I really don’t want to gunge up the rear entry holes with sealant and, as you say in your video, I was sure I didn’t need to. However, the more I look in to it it’s far from clear cut and that article says “must be provided with suitable sealing methods”. So must not should. I’m now thinking of getting a intumescent pad and sticking that somewhere in the box.

  • @DeanElliott-ii6xn
    @DeanElliott-ii6xn 8 місяців тому

    Hi James thanks for the video help me a lot, one question if I’m using a 2 core armoured and the steel as the cpc how do I calculate my r1+r2.

    • @JamesCurnowElectricalEngineer
      @JamesCurnowElectricalEngineer 8 місяців тому

      Hi Dean, thank you for your comment. I'm glad the video helped. When using swa as the cpc, it will be necessary to obtain the data from the manufacturer. Data sheets are usually available on the manufacturer's website, and I notice they include a value for the line conductor in ohms per kilometer. It used to be possible to get the value for the swa as well, but it may be necessary to contact the manufacturer and ask for a value for ohms per kilometer for the swa as well as the line conductor. This can then be used in the calculation I mentioned in the video. Regards James

  • @ivanlee7596
    @ivanlee7596 9 місяців тому

    really useful, thanks~

  • @paulstimpson8977
    @paulstimpson8977 10 місяців тому

    This is not totally correct. You can do electrical work in a Bathroom/Toilet providing it is not a new circuit and that it is outside of the zones.

    • @JamesCurnowElectricalEngineer
      @JamesCurnowElectricalEngineer 10 місяців тому

      Hi Paul, Thank you for your comment. The current version of part p for use in England does mention the zones in a bath or shower room. However in other parts of the UK it can be different. For example the requirements for part p are different in Wales, where the part p document refers to the special locations but not the zones. So, in this video I mentioned some of the special locations and that it's important to check the version of part p that applies depending on which part of the UK the installation is located. It's also worth pointing out that alterations to wiring in a special location are also notifiable. Regards James

  • @joannamaciejewska869
    @joannamaciejewska869 10 місяців тому

    Thank you, James.

  • @brianhewitt8618
    @brianhewitt8618 11 місяців тому

    Should be on the incoming mains

  • @gino2465
    @gino2465 11 місяців тому

    What about caravan home hook ups

    • @JamesCurnowElectricalEngineer
      @JamesCurnowElectricalEngineer 11 місяців тому

      Hi, Thank you for your question. PME earthing is not permitted for caravans. This is in the electricity safety, quality and continuity regulations and section 708 in BS7671. Regards James

    • @gino2465
      @gino2465 11 місяців тому

      @@JamesCurnowElectricalEngineer appoligies yes I know , and most caravan motor home uses but an adaptor to plug there 25m orange lead to the vehicle..using an external pen fault device would be better than the 25m lead.

  • @berkotropia
    @berkotropia 11 місяців тому

    Finally someone know how to explain this! Just one question. Where do I get the Ipfc=3.2kA? Do I ask the DNO?

  • @Bob-ed3qi
    @Bob-ed3qi 11 місяців тому

    If circuits have a rcd fitted ,are the Zs test readings important, if under 1667 ohms is a acceptable pass.?

  • @rodgerq
    @rodgerq 11 місяців тому

    It does surprise me that there isn't some stipulation, whereby if a CU is mounted onto combustible material like wood, that cable entries, especially rear ones that are bigger overall, don't have to be sealed in order to stop the spread of fire into the wood.

  • @callumsimpson7483
    @callumsimpson7483 Рік тому

    Would literally take two seconds to shorten the flex or fit a batten pendant instead 😂😂😂

  • @JamesCurnowElectricalEngineer

    Please see the link to the longer video ua-cam.com/video/3oVwbmH22O0/v-deo.html

  • @LeeBarbet
    @LeeBarbet Рік тому

    Thanks for this video James, to the point and easy to follow along. Much appreciated

  • @Bob-ed3qi
    @Bob-ed3qi Рік тому

    Great explanation of a grey area Jim

  • @Bob-ed3qi
    @Bob-ed3qi Рік тому

    When measuring Zs do you go by 18th edition book,or on site guide 80% rule.?