HS2 Kenilworth Road A429 19th October 2024

Поділитися
Вставка
  • Опубліковано 8 січ 2025

КОМЕНТАРІ •

  • @Michael-61-n3l
    @Michael-61-n3l 2 місяці тому

    have they started construction of the secondary structure @ the Coventry/Kenilworth rail line _ one was scheduled to be built to allow access for agricultural vehicles next to the line _ looks like rebar in the base of the cutting _ moving forward still _ looking forward to seeing a finished complete realignment
    another good piece for the archive
    keep it going

  • @pedromorgan99
    @pedromorgan99 2 місяці тому

    BTW.. MEGA problem. is the tunnel boom effect, ie contained aerodynamic drag. So these structures have that in mind. In Japan.. they just viaduct or tunnel the whole lot so grade seperated and everything

    • @davecardboard9567
      @davecardboard9567 2 місяці тому +1

      IIRC HS2 tunnel dimensions and "porous portal" have been designed to alleviate any tunnel boom.