  • At Deevees Dental Clinic Kayamkulam working hours is between 8.30Am to 7.00PM, During the power cuts a 15kVA DG powered the and Load and now using a 12kW Hybrid System and Lithium battery we have put an end to the use of a Generator
    They have
    1. 7 AC
    4 in the ground floor and 3 in the first floor.
    4 1.5Ton and 3 1 Ton
    2. Dental Chairs
    4 numbers
    3. Suction pump 3 numbers
    4. Mini Xray machine 1 number
    5. Compressor 1 number
    6. Refrigerator 2 numbers
    7.Auto clave machine 2 numbers

КОМЕНТАРІ • 6

  • @albinjames1585
    @albinjames1585 3 місяці тому

    Rate?

  • @sreesakthisakthi7518
    @sreesakthisakthi7518 6 місяців тому

    End user cannot always keep screw driver and customer is either know how the stuff works like the person tells us how it's working

  • @sreesakthisakthi7518
    @sreesakthisakthi7518 6 місяців тому

    Display of power is not seen there are no color display which is bad for this heavy investment viwers can't see display

  • @Nazahopping
    @Nazahopping 6 місяців тому +1

    12KW 3string അല്ലേ 🤔

    • @heliosolar5273
      @heliosolar5273  6 місяців тому

      We retrofitted an existing 10kW. Yeah there is 3 strings now, the video was captured two months ago.

  • @sreesakthisakthi7518
    @sreesakthisakthi7518 6 місяців тому

    Too much drag in presenting like uhhh uhhh