- At Deevees Dental Clinic Kayamkulam working hours is between 8.30Am to 7.00PM, During the power cuts a 15kVA DG powered the and Load and now using a 12kW Hybrid System and Lithium battery we have put an end to the use of a Generator
They have
1. 7 AC
4 in the ground floor and 3 in the first floor.
4 1.5Ton and 3 1 Ton
2. Dental Chairs
4 numbers
3. Suction pump 3 numbers
4. Mini Xray machine 1 number
5. Compressor 1 number
6. Refrigerator 2 numbers
7.Auto clave machine 2 numbers
Rate?
End user cannot always keep screw driver and customer is either know how the stuff works like the person tells us how it's working
Display of power is not seen there are no color display which is bad for this heavy investment viwers can't see display
12KW 3string അല്ലേ 🤔
We retrofitted an existing 10kW. Yeah there is 3 strings now, the video was captured two months ago.