Developing offshore wind energy in Australia

Поділитися
Вставка
  • Опубліковано 26 жов 2024

КОМЕНТАРІ • 2

  • @iantag
    @iantag 2 місяці тому

    Construction from scratch in Australia is of a magnitude that dwarfs previous shipbuilding. Eg Hunter 5GW floating offshore at 15 MW/unit ~ 330 units. Lets say 1st phase in 100 units deployed in 1 year (1500 MW) - about 2 'coal fired boilers' worth). Estimated steel is 4000t/unit. So to construct 100 units = 400,000 tonnes. Biggest ships that used to be built in Australia were 10-12,000 tonnes. To build 100 units requires Port of Newcastle to construct and deploy about 2 units per week (in this scenario) . This is all getting to be a bit of a stretch. Failure statistics for offshore turbines have been quoted as high a 8 failures per year per turbine !! (about 1000 hr MTBF per unit) - so you need a fully function maintenance and supply facility once the first units are even online. Failure of Electrical Cabling interconnects are well known/reported and bordering on UN-insurability (that alone is a project killer). This tells me that : a single step into an offshore wind mega-project in Australia is extremely risky (or simply foolhardy) and instead, Australia needs a softly-softly staged approach to even know the beast they are trying to create. A staged approach says start with a fast-tracked pilot project of (say) 5-10 offshore units before you bet the farm. BTW - part of my background was reviewing major capital projects for an O&G majors - where serial #1 was something that rarely delivered. Not impossible; but a supply chain nightmare for the 1st in Oz.

  • @MichaelSmith-px1ev
    @MichaelSmith-px1ev Місяць тому

    Sounds like the speakers weren’t aware how much time they were allowed to speak. Supply chain has massive issues here hopefully they can resolve this ASAP