    I 'm an inspector myself and I come back an consult these videos that Garry puts on and its all great info. Thank you Garry for taking the time out of your day to help people out.

  • @rossfriedman6056
    @rossfriedman6056 Рік тому

    I’ve been looking everywhere for a video JUST LIKE THIS haha thank you!!

  • @senormule7754
    @senormule7754 3 роки тому +1

    Excellent and concise presentation and explanation , D1.1 is laid out in a less than organized manner, and it is very easy to misinterpret the meanings laid out by the code writer. This why it is important to read the entirety of the code for a full understanding. This understanding of the code you more than demonstrate, I look forward to your other videos.

  • @jaimeacosta3511
    @jaimeacosta3511 5 років тому +2

    Thanks for all the excellent videos!
    Full of information and very well explained!

    • @viveksingh7186
      @viveksingh7186 4 роки тому

      IS2062 250BR which Group Assume please clarify

  • @marcelogomesferreira8071
    @marcelogomesferreira8071 2 роки тому

    Thank you for sharing your knowledge, this video is very good and I'm sure it will help many professionals, just like it helped me.
    Success friend

  • @mehmetatar443
    @mehmetatar443 4 роки тому

    Dear Mr. Harry PACE, thank you for awesome and magical practical knowledge sharing regarding prequalified wps which is part of AWS D 1.1, however I want to corrected one issue about steel quality in Turkey (Istanbul) (video time regarding with issue 28:08 ) , Turkish steel quality is much better than chinese because of my company is exported all of the our manufacturing of steel pile pipe to Europe and USA, up to now we did not face any nonconformance related with 3.1 Mill Test Certificate or any type of material nonconforma ce from our Client or Customer in USA, BEST REGARDS

  • @pedrocardenas7736
    @pedrocardenas7736 3 роки тому

    Thanks a lot ! Garry , it is very interesting information. Regards from Perú.

  • @alexfaught2952
    @alexfaught2952 5 років тому

    wps=recipee pqr we get it i have to check every video to see if weve moved on i kinda apreciate it you are a wealth of knoledge. thank you just over repetitive

    • @gpacex
      @gpacex  5 років тому +1

      True statement - these have been put together over a couple of years and there never was a really detailed master plan. So sometimes material gets hit more than once.

  • @jaya962
    @jaya962 4 роки тому

    Very well presented. Thanks Gary

  • @panneerselvameswaran9754
    @panneerselvameswaran9754 5 років тому +1

    Thanks Gary

  • @TheAlbert1A1
    @TheAlbert1A1 2 роки тому

    amazing video thank you for this!!

  • @amirsahaf
    @amirsahaf 4 роки тому

    excellent presentation, thank you.

  • @raymundtalisic
    @raymundtalisic 5 років тому

    well done impresive xplanation, hope you can response to my question, we have now a build up beam the flange thickness is 60mm and web thickness is also 60mm it is a CJP , the grove preparation angle is 60 degree i think it is to much already all we know the standard grove angle for tee butt joint is 30 to 35 degress is that possible or fall under any AWS clause, thank you in advance for those who can adress my concern cheers.

  • @pradip883
    @pradip883 4 роки тому

    Thank you sir

  • @chandrapalsingh7619
    @chandrapalsingh7619 2 роки тому +1

    Now my life becomes easy

  • @pradip883
    @pradip883 4 роки тому

    Can you please share a video on AWS VS ASME welder & WPS qualifications?

  • @Jawahar1995
    @Jawahar1995 3 роки тому

    Which one we have to prepare first? WPS or PQR?

  • @DominadorVanzuela
    @DominadorVanzuela 6 місяців тому

    Saan dito sa pilipinas makuha ang d1.1

  • @arjunbabuchala
    @arjunbabuchala 3 роки тому

    Hi , How do I set short arc, globular or spray transfer in a same equipment ?. Does it requires a special machine or can I do it with a regular ESAB MIG 400i cccv etc ?

    • @gpacex
      @gpacex  3 роки тому +1

      It is by cranking up the voltage - you will need a shielding gas with a minimum of 80% argon for spray transfer.

    • @arjunbabuchala
      @arjunbabuchala 3 роки тому

      @@gpacex Thanks ,By chance is there any standard reference from where we can get those values directly ?.
      I am looking to weld 20 mm low carbon steel plates in a tee joint filled weld.
      Appreciate your help...

    • @amanullakaranath6226
      @amanullakaranath6226 2 роки тому

      Hi,
      A small query.
      Electrode dia is an essential variable for pre-qualified WPS. Can I use multiple diameter in a WPS which is less than the Max dia allowed. Example for SMAW, 2.5/3.2 in a WPS or separate WPS for each dia?
      Thanks

    • @Edaloy27
      @Edaloy27 Рік тому

      @@arjunbabuchala I'm a little late but if you ask 5 different people you will get 5 different answers, but general short circuit is 18-22 volts/7525 gas and globular is 22-28v/7525 gas and spray is 28v and above min 80% Ar mix

  • @thuong_st6350
    @thuong_st6350 3 роки тому

    Dear Garry Pace
    I am making a WPS in acordance with D1.1 but I encounter a hard situation that dont know where in D1.1 I shall follow
    Could you please give me an advice or instruction
    My WPS I have to make:
    + Position: 2F
    + Materials: Plate A36 +Round bar S45C
    + Method: FCAW
    Thank you so much

    • @gpacex
      @gpacex  3 роки тому +1

      Google Texas welding engineering Garry Pace send me an email

  • @pradip883
    @pradip883 4 роки тому

    AWS WQT & ASME WQT Both are same or different?

  • @FaheemAhmad-fr8oi
    @FaheemAhmad-fr8oi 4 роки тому

    My concern if i qualify prequalify wps in 3g position with backing so what will be my qualifeid positions for wps

    • @MrTeddycozmik
      @MrTeddycozmik 3 роки тому

      Buy a copy of AWS D1.1 from the aws.org website. It will show you what is qualified.

  • @chandransekar67
    @chandransekar67 5 років тому

    WPS , PQR and WQT depends upon material thickness(plate and pipe) how will prepare?. Please provide your contact detail also