  • In this video i have explained about the method of Rate Analysis of Granite Stone Flooring OR how to calculate granite flooring cost, This is very important video fir every billing engineer and costing engineer.

КОМЕНТАРІ • 40

  • @lalitkumar-lo9cs
    @lalitkumar-lo9cs 5 років тому +1

    Very helpful video.
    Ab samajh me ata ja Raha hai rate of analysis .

  • @sbk19cricketcollections92
    @sbk19cricketcollections92 5 років тому

    What can I say, Your videos are always informative and helpful

  • @nadeemahmed736
    @nadeemahmed736 2 роки тому

    Superb sir, thank you so much for providing details.

  • @javedkhan-eu2sx
    @javedkhan-eu2sx 5 років тому

    👍👍 very help full videos.
    Thanks

  • @mfaisaldilshad6784
    @mfaisaldilshad6784 5 років тому

    Amit bhai you are great.

  • @kunaljha6837
    @kunaljha6837 Рік тому

    sir you explained in cement & sand calculation video is the coefficent for granite/stones/marble is 0.224 Cum (less mortar consump. for smooth bases in stones/marble/granite) per 10sqm & For Tile flooring 0.24 Cum (more mortar consump. for grooves in tile bases)

  • @yashgupta6826
    @yashgupta6826 5 років тому

    Thank you Sir....... Sir Ji you are great....

  • @manojpandey4725
    @manojpandey4725 5 років тому

    Excellent details, please upload a analysis for Italian flooring or imported marble

  • @ashujain206
    @ashujain206 5 років тому

    Very nice

  • @arshadgholam2799
    @arshadgholam2799 4 роки тому

    Very precise analysis. What if bed mortar increases and it definitely will in most of the cases practically. In such cases, Levelling of Concrete has to have zero tolerance or bare mininum which is quite difficult to achieve.

  • @travelwithshahid2807
    @travelwithshahid2807 3 роки тому

    Thank you Sir

  • @animeshsamanta4058
    @animeshsamanta4058 7 місяців тому

    Sir in this video are you use cpwd specifications please tell me sir which particular specifications are you use for recheck?

  • @civilbasic1189
    @civilbasic1189 2 роки тому

    Thanks 👍

  • @AKhan-xi7xj
    @AKhan-xi7xj 5 років тому

    Plz do rate analysis for excavation...... Love from 🇵🇰

  • @yashgupta6826
    @yashgupta6826 5 років тому

    Sir More vedio Upload for this topic......

  • @sandeepgupta-gj8bv
    @sandeepgupta-gj8bv 4 роки тому

    What will be the rate for project having tower G+20. 50 rs labour rate seems very high. Does it include some polishing cost

  • @vanshraghuvanshi894
    @vanshraghuvanshi894 Рік тому

    Sir granite ka coefficient to .224 hota hai na aapne hi batya tha recalcution wale video mei

  • @MayurRajwani8
    @MayurRajwani8 5 років тому +2

    thank u, very helpful, have one doubt 20% wastage as per CPWD from which clause i can read this and other wastage co-efficient?

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому +2

      Thats very good question, u can check in DAR Vol. 1 Sub Head 8 (Marble & Granite Works) Item no. 8.1 for flooring works with 20% wastage
      Also note if you fixed a stone over kitchen, toilet counter allowable limit of wastage should be only 5%.

    • @MayurRajwani8
      @MayurRajwani8 5 років тому

      @@FactualCivilEngineering thank you

    • @MayurRajwani8
      @MayurRajwani8 5 років тому

      thanks a lot, very very helpful, know one guided that much

    • @AshishSharma-xt7fo
      @AshishSharma-xt7fo 5 років тому

      Sir staircase p jo stone lgta h usmai wastage kitni % pkdenge ...??

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому

      20

  • @Pratik_VOLG_GLOV
    @Pratik_VOLG_GLOV 3 роки тому

    What will be the handeling and design wastage in case free supply of granite

  • @sanjayborge2240
    @sanjayborge2240 5 років тому +1

    sir,very helpful video but contracor's profit you take 15% as in practice they took more...... any way this is useful in rate analysis,thanks a lot ,Grate.......regards.

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому

      ua-cam.com/video/-8w0XQuSU2g/v-deo.html for more clarification watch this video, most of engineers have wrong concept about contractor profit and over head, always be clear this topics

  • @govindsingh8168
    @govindsingh8168 4 роки тому

    Rate analysis for false ceiling work

  • @raghvendrapratap7390
    @raghvendrapratap7390 3 роки тому

    Sir, Contractor using cement 105 kg/cum for concrete (1:4:8) and in DSR consumption given 170 kg/cum. How to make new analysis of rate if tender rate is 4000 Rs/cum?

  • @CivilTimeline
    @CivilTimeline 3 роки тому

    Sir aab to ye rates may be 5 to 10% increase ho gye honge

  • @abhisekmedya4502
    @abhisekmedya4502 2 роки тому

    Sir, 1 sqm=10.764 sqft
    So devided by 10.764 ????but u wrote that multiple by 10.764

  • @avinashkumargupta9242
    @avinashkumargupta9242 Рік тому

    Pls share excel copy

  • @sandeepgupta-gj8bv
    @sandeepgupta-gj8bv 5 років тому +1

    U shud have told about moulding cost, cost of polishing whether, diamond or mirror, buffing etc

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 років тому

      Granite is a prepolished stone, there is no need to polish it, only buffing required which is already included in rates.

  • @Alfakir002
    @Alfakir002 3 роки тому +2

    Price is for 100 sq.ft or 1000 sq.ft ??
    Can somebody help

  • @AliKhan-fp9eb
    @AliKhan-fp9eb 4 роки тому

    I need excel soft copy players Share the link