Start To Finish 859 Mount Seymour Trail: Connector To Bottletop (New)

Поділитися
Вставка
  • Опубліковано 7 лют 2025
  • Riding the full trail from the exit of Cambodia to the new exit on the powerlines. It now bypasses the chunky uphill from the old exit to this point on the powerlines.
    DATE: 2025-01-12
    theTRAILnet: thetrail.net/t...
    Trailforks: No Resource
    Support the NSMBA, nsmba.ca/
    For current and older trail info & photos, visit thetrail.net
    Social Media:
    Instagram: / thetrailnet
    Twitter: / thetrailnet123
    Stuff:
    Bike: Commencal and Squishy On Both Ends
    Camera: GoPro HERO12 Black (Chin Mounted)
    Camera Chin Mount: ProBike3D - Gopro Chin Mount for Fox Proframe (RS) MTB Helmets
    Light: Gloworm XS Lightset (G2.0) (2800 Lumens)
    Light (Helmet Mounted): Gloworm Alpha PLUS (G1.0) RF (1200 Lumens)
    Disc Brake Pads: MTX Red Label Brake Pads (Ceramic)
    Flat Pedals: Pedaling Innovations Catalyst Pedals
    Brakes: Hope Tech 4 V4
    Saddle: SQLab 611
    Grips: RevGrips Pro Series Ergonomic Grip System
    Front Ring: Wolf Tooth Components Direct Mount Chainring
    Video Editor: DaVinci Resolve Studio 19.0
    Video Preprocessor: VirtualDub 2
    mount seymour, connector to bottletop (new), trail, mountain biking trail, mountain bike trail, the north shore, north vancouver, mountain biking, downhill mountain biking, mtb, extreme sports, enduro mtb, mtb life, mountain bike, bike

КОМЕНТАРІ •