Manitowoc MLC100-1 Assembly Overview

Поділитися
Вставка
  • Опубліковано 15 гру 2024

КОМЕНТАРІ • 28

  • @macmcguffie1003
    @macmcguffie1003 3 роки тому +5

    Love the 4100 Series 2 .
    Operated that fine crane over 17 years, 👍👍👍

  • @RLoose9494
    @RLoose9494 7 місяців тому

    I’ve broke down and set up that crane a thousand times. All inside 8 hours including the travel time on the low boy. One of my favorite cranes.

  • @alleycat1084
    @alleycat1084 4 роки тому +5

    Reminds me of all the times we put the 4100 together haven’t seen those in a long time.

    • @paperfade5660
      @paperfade5660 4 роки тому

      Oiled for one in an assembly last year. Using it as a pile rig. I run towers though. Not sure if that's typical

  • @CeccantiInc
    @CeccantiInc 4 роки тому +3

    Beauty!! We love our MLC300!

  • @sefnialatberat
    @sefnialatberat 2 роки тому

    Great video🙏

  • @Drama4155
    @Drama4155 2 роки тому

    So if you have crawler speciality ? You can operate any crane that’s a crawler? Hydraulic and lattice?

  • @kevinpennings8823
    @kevinpennings8823 2 роки тому

    Why would the top boom pins go inside to out you risk having the load line hang up and or knocking the retainer clips off

  • @tomkeltescheverythingoutdo2379
    @tomkeltescheverythingoutdo2379 5 років тому +9

    Its unfortunate that they aren't made in Manitowoc anymore.

    • @kuyalemsadventure7502
      @kuyalemsadventure7502 10 місяців тому

      yes indeed i am a crane operator here in philippines i used this kind of unit .

  • @godfreybwalya6537
    @godfreybwalya6537 3 роки тому

    How can i manage to be an operator of this machine?

  • @chuckmiller4091
    @chuckmiller4091 5 років тому +1

    Time for law abiding citizens to stand up for AMERICA IN ANY WAY WE NEED TO .

  • @Reviewunik-f
    @Reviewunik-f 2 роки тому

    Good work...

  • @vimalgoswami8702
    @vimalgoswami8702 3 роки тому

    I am spares retailer and I want manitowc spares in India please help

  • @kolsen6330
    @kolsen6330 4 роки тому +5

    These look like bosses making a video. Crane "riggers" without a speck of grease on their jackets or pants. Waaaaay too clean and polished for real workers. Also its clear they are not riggers, look at the hook at 4:05.

    • @LVKcrew
      @LVKcrew 4 роки тому +1

      Whats wrong with the hook?

  • @mingming9604
    @mingming9604 4 роки тому

    nice compact crane!

  • @chuckmiller4091
    @chuckmiller4091 5 років тому

    These people in office are not looking out for us , they are to worried about themselves.

  • @ericlakota1847
    @ericlakota1847 Рік тому

    We use to have luxury working with 250,000ton and that thing was great set prea cast and structural iron we would use small er cranes but most hydrolic and on wheels the manatwak crawlers where always 250 ton twice the size and could make every pic on collage building from one spot when I first started iron working we used a 1960s link belt on wheels some one drove the truck and some one drove the boom down the road from job to job and the boom came on trailor trucks it paid for its self over and over again they ran it tell 2007 and the company went out bisness

  • @chrisroeOperator
    @chrisroeOperator 6 місяців тому

    This crane sucks to assemble/disassemble, and to operate.