Demolition 7316 Wisconsin (Part 3)

Поділитися
Вставка
  • Опубліковано 29 жов 2024

КОМЕНТАРІ • 4

  • @constructionwatcher5381
    @constructionwatcher5381 2 роки тому

    Thanks for the update, John. That's a long reach over the top of the building.
    Have you figured out the purpose of the insulated pipes that run down the middle of each panel?

    • @JohnZWetmore
      @JohnZWetmore  2 роки тому

      Perhaps the pipes fed hot water to heaters located under each window. That's the only thing I can think of that would require them to be everywhere.

    • @constructionwatcher5381
      @constructionwatcher5381 2 роки тому

      @@JohnZWetmore That makes sense. I can't spot anyplace were there were connections to heaters on each floor, but they would have been toward the inside of the building, which we can's see.

  • @Asherrothstan
    @Asherrothstan 2 роки тому +1

    First!