Gate Rudder Ship Erge voyage data provided by CETENA

Поділитися
Вставка
  • Опубліковано 2 жов 2024
  • The leader of WP2 (CETENA) has submitted their voyage data analysis of Erge to EU.
    Gaters installed the gate rudder on Erge by replacing the flap ruuder last year ( April 2023).
    The sea trials before and after showed remarkable fuel savings 35% by this retrofit.
    After delivery of Erge equiped with gate rudder, WP2 has collected the perfomrnace data and reported to EU authority in March 2024.
    This video will introduce this valuable data by which the performance of Erge after delivery can be evaluated.

КОМЕНТАРІ •