thanks for this video
Welcome 😊
@@ANIFGAFFOOR this is very cool
Usually what is the age of the pile to be tested?
Thank you for the video! This will help me for my assignment
❤️❤️ welcome, I try to make separate video for construction and make more videos like.
2.50 times of safe load to be use for test load as per is 2911, part 4, 203.
Very nice bro thank you so much ❤️❤️❤️❤️👏👏👏👏👏 Keep it up, I'm waiting for next pile testing video❤️❤️❤️❤️❤️❤️
Thank you, another test will update soon
@@ANIFGAFFOOR ❤️
Thank you brother.
How much design load of the pile.
620 Tons
Thanks
If incase pile test was failure how can rectify..??
The layout of the piles would need to be changed and new piles installed to achieve the weight capacity needed
❤
Please learn fully about the test 🙂
Which standard & what code practice is this you’re thinking ???
The test is wrong as the datum support must be 3D or minimum 2 meter away from the edge of the pile which has not been done..
Thanku brother
Welcome brother
thanks for this video
Welcome 😊
@@ANIFGAFFOOR this is very cool
Usually what is the age of the pile to be tested?
Thank you for the video! This will help me for my assignment
❤️❤️ welcome, I try to make separate video for construction and make more videos like.
2.50 times of safe load to be use for test load as per is 2911, part 4, 203.
Very nice bro thank you so much ❤️❤️❤️❤️👏👏👏👏👏 Keep it up, I'm waiting for next pile testing video❤️❤️❤️❤️❤️❤️
Thank you, another test will update soon
@@ANIFGAFFOOR ❤️
Thank you brother.
How much design load of the pile.
620 Tons
Thanks
If incase pile test was failure how can rectify..??
The layout of the piles would need to be changed and new piles installed to achieve the weight capacity needed
❤
Please learn fully about the test 🙂
Which standard & what code practice is this you’re thinking ???
The test is wrong as the datum support must be 3D or minimum 2 meter away from the edge of the pile which has not been done..
Thanku brother
Welcome brother