Impressive!..30km Anwiankwanta - Obuasi Dual Carriage Road Project Update March 2022.

Поділитися
Вставка
  • Опубліковано 4 бер 2022
  • #THESEEKER #COVTVGHANA #GHANAFIRST
    SUBSCRIBE For More Daily EXCLUSIVE videos
    / @covtvghana

КОМЕНТАРІ • 12

  • @topazanaconda1994
    @topazanaconda1994 2 роки тому +2

    I don't think they are done with the road. I think they will add another layer. I also think the inner lane separating the 2 sides will receive pavement blocks.

  • @isaacfiagbe3506
    @isaacfiagbe3506 2 роки тому

    That’s a very Dangerous problem that needs to be fixed.

  • @kwabenaasamoah7395
    @kwabenaasamoah7395 2 роки тому

    the minister of road must inspect. and. let the to complete very well

  • @obedteyeamponsah9571
    @obedteyeamponsah9571 2 роки тому

    Is this Jakara ABa bro

  • @kyeremehfredick2130
    @kyeremehfredick2130 2 роки тому

    Why are you not going to ask the engineer please

  • @aboaboyahciciniko7132
    @aboaboyahciciniko7132 2 роки тому

    👁👁👁👁

  • @kwasikyeremeh7757
    @kwasikyeremeh7757 2 роки тому

    Africa, look at the road they are saying they have finished? dust everywhere, no road markings, unfinished pavement, what is going on in Africa? God mercy!!

  • @bigcandy114
    @bigcandy114 2 роки тому

    This is first coat. Too much talking

  • @georgeappiah8314
    @georgeappiah8314 2 роки тому

    OBUASI DESERVES BETTER

    • @adupoku8882
      @adupoku8882 2 роки тому

      Go and give that better to them, Berekum also deserve better because is also a gold town. Always u people have ur eyes in ashanti region and talking shit about ashanti region.

    • @georgeappiah8314
      @georgeappiah8314 2 роки тому

      @@adupoku8882WHO IS TALKING SHIT ABOUT ASHANTI REGION YOU CONFUSED ME, COME AGAIN