Concrete Column Construction Process | Traditional Timber Formwork | Reinforcement | Shuttering Work

Поділитися
Вставка
  • Опубліковано 11 січ 2021
  • #GroundColumn #TraditionalTimberFormwork #ConstructionWorkProcess
    Columns
    Column is a vertical structural member that carry loads mainly in compression. It is assumed to be the most crucial structural member of a building because the safety of a building rest on the column strength.
    This is because failure of column would cause progressive collapse in buildings whereas such event would not occur when other members fail.
    Columns transfer vertical loads from a ceiling, floor or roof slab or from a beam, to a floor or foundation. They also carry bending moments about one or both of the cross-section axes.
    👇 SUBSCRIBE TO Aperture Of Construction UA-cam CHANNEL NOW 👇
    / @apertureofconstructio...
    Credits :
    Background Music: www.bensound.com
    Subscribe and share videos for me. Thank you.
    Concrete Column Construction Process | Traditional Timber Formwork | Reinforcement | Shuttering Work
    • Concrete Column Constr...
    Dismantling Ground Floor Column Foamworks Process | Traditional Timber Formwork | Removing Foamworks
    • Dismantling Ground Flo...
    Amazing Fastest Skills Building Brick Wall Easily | Single Storey Shop Party 225mm SandBrick Wall
    • Building Bricklaying W...
    First Floor Beam & Slab Concrete Works By Concrete Pump Crane 42M @ House Renovation Extension
    • First Floor Beam & Sla...
    ICE FLAKE Making Process | ICE BLOCK to ICE FLAKE | FAST WORKER PROCESS | ICE CUBE Block
    • ICE FLAKE Making Proce...
    New Construction Site Preparation | Dismantle OLD Timber Wood Fishery Jetty Work Progress | 拆卸旧式鱼寮
    • Construction Works : D...
    Steel Rebar Bending Process | Bending Machine | Steel Rebar Reinforcement | Bending Machinery
    • Steel Rebar Bending Pr...
    Construction Roof Beam Sand Cement Plastering Work Technique & Progress/Cement Plaster Concrete Beam
    • Construction Roof Beam...
    How to Prepare Ground Beam Timber Formwork I Traditional Timber Formwork I Oil Treatment applied
    • How to Prepare Ground ...
    Scaffolding Shuttering Works: How to Prepare & Install BEAM SLAB Shuttering Process Before FORMWORK
    • Scaffolding Shuttering...
    How To: Unloading 250mm ICP Spun Piles from Trucks at Fishery Offshore [Jetty] Sea Side Pre-Piling
    • How To: Unloading 250m...
    Time Lapse 2X: 250mm Spun Piles Piling Works in Construction by Crane Piling Machines FULL Process
    • Time Lapse 2X: 250mm S...
  • Наука та технологія

КОМЕНТАРІ • 38