Thank you! Your way of explaining things is so clear and concise. I have no trouble learning at all. Usually when watching tutorials like this, I have to constantly rewind because I am lost on how they just did something. I never have to rewind with your videos! Thank you!
This was an excellent and well-presented introduction to the basics of Microsoft Project. I feel like I can now go and start building a project without having to invest hours into training just for the basics.
Amazingly Helpful. Many years ago I had the nuances of project nailed and actually understand completely how to lay out the tasks, etc. but, for some reason when I came back to Project to load things up, I was completely lost again. This 15 minutes got me back straight! Thanks Cody, well done and much appreciated sir.
I love how this was explained in short and clear manner. I have been intimidated looking at this before and now after watching, Im too excited to try this tomorrow!
Talk about clear, concise, and to the point, this video was a gem of a find. I knew the software wasn't rocket science, and you proved that in 15 minutes, flats using project-based education, which I think is the best way to learn quick. I'm ready to operate the software now...thanks
Greetings from Mongolia. It is pleasure to explore your teaching technic on MS project by watching in youtube. Thanks for you all effort which always goes someone who is able to do things which ever to do until watch this useful video. :)
If you guys are getting issues with your task dates with them defaulting to manual. Look at the bottom left of the page and make sure that the New tasks are set to manual by default. Hope that helps anyone stuck like I was. Great tutorial btw.
Perfect video! Long time since I've learned MS Project in the college and I could remember almost everything with this video. Very clear and concise. Congratulations!
Awesome! Your knowledge of construction could use some help, but I know that's not the point :) Again, thank you we were looking for a solution and you sealed the deal.
Hi Cody, thanks for your video! It’s very informative. I have some questions about the MS project. How do I deal with a huge time gap between tasks? For example, after finishing task A, we need to wait for 2 months to start the task B. Should I just add a lag time between task A and B? Thanks for your help!
HI Cody; very well briefed video. Just one thing i couldn't work out. I put everything same as per your data/details. But the "Foundation" duration is coming up as 54 days instead of 20 days (in the video), everything else looks same. Even dates are same also, can you please advise??
Mr. Baldwin. I enjoy your videos and hope you can direct me to the correct place. I have a spreadsheet with 82 counties listed as rows, and 52 weeks listed as columns. In cells I have identified if county employees are available to contact with words and colored the cells. I am trying to figure out how to determine which counties are available for our staff to meet with each county based on our information and our availability. Is there a simple way to do this? Thanks so much! Bob
Have a few issues. In the trial version I can do everything up to managing resources. I don’t have access to the menu options (File, Resource, Report, View etc...) I’m using Project Plan 1 which looks similar to this but slightly different features. (For eg Predecessors tab is called ‘Depends on’) Project Plan 3 is a completely did interface
What Isabella V said below! Man, I wish you had more videos on Excel in's and out's. I didn't even need this one but was curious after watching your "Learn Macros in 7 mins" and actually realized, although it didn’t speak to what I was looking for, there are a number of ways I could use this personally! I have burned so much midnight oil going through well-meaning videos searching for a particular formula only to be left with the same "What the What" face I sat down with. I soooo need to learn how to: If Sheet1 Column B contains YES then enter all data in that row to next available row on Sheet2. Do you have a video/blog/anything I missed that could walk me through? Or recommendation for another UA-camr/blog that would help? Thanks!
Auto Scheduled 1 day? Thu 3/9/23 Thu 3/9/23 65 Auto Scheduled Paint all - 2nd floor 1 day Fri 3/10/23 Fri 3/10/23 66 Painting contractor Auto Scheduled Paint exterior siding & trim work 4 days Fri 3/24/23 Wed 3/29/23 38 Painting contractor Auto Scheduled Cabinets 6 days Fri 3/10/23 Fri 3/17/23 Auto Scheduled Install 1st floor - kitchen cabinets 2 days Fri 3/10/23 Mon 3/13/23 64 Finish carpentry contractor Auto Scheduled Install 1st floor - master bath and guest cabinets 1 day Tue 3/14/23 Tue 3/14/23 70 Finish carpentry contractor Auto Scheduled Install 2nd floor - hall bath and private bath cabinets 1 day Wed 3/15/23 Wed 3/15/23 71 Finish carpentry contractor Auto Scheduled Install chair rails, crown moldings, trim 2 days Thu 3/16/23 Fri 3/17/23 72 Finish carpentry contractor Auto Scheduled Finish Plumbing 6 days Tue 3/14/23 Tue 3/21/23 Auto Scheduled Complete 1st floor - kitchen plumbing 1 day Tue 3/14/23 Tue 3/14/23 70,41 Plumbing contractor Auto Scheduled Complete 1st floor - master bath and guest plumbing 2 days Wed 3/15/23 Thu 3/16/23 75,71 Plumbing contractor Auto Scheduled Complete 2nd floor - hall bath and private bath plumbing 2 days Fri 3/17/23 Mon 3/20/23 76,72 Plumbing contractor Auto Scheduled Conduct finish plumbing inspection 1 day Tue 3/21/23 Tue 3/21/23 77 Inspector Auto Scheduled Finish Electrical 3 days Tue 3/21/23 Thu 3/23/23 Auto Scheduled Complete 1st floor circuits to service panel 1 day Tue 3/21/23 Tue 3/21/23 77,44 Electric contractor Auto Scheduled Complete 2nd floor circuits to service panel 1 day Wed 3/22/23 Wed 3/22/23 80 Electric contractor Auto Scheduled Conduct finish electrical inspection 1 day Thu 3/23/23 Thu 3/23/23 81 Inspector Auto Scheduled Complete communications wiring - phone, cable, computer, alarm 2 days Wed 3/22/23 Thu 3/23/23 78 Electric contractor Auto Scheduled Finish HVAC 3 days Fri 3/24/23 Tue 3/28/23 Auto Scheduled Complete 1st floor - zone 1 HVAC 1 day Fri 3/24/23 Fri 3/24/23 83,46 Heating and AC contractor Auto Scheduled Complete 2nd floor - zone 2 HVAC 1 day Mon 3/27/23 Mon 3/27/23 85 Heating and AC contractor Auto Scheduled Conduct HVAC inspection 1 day Tue 3/28/23 Tue 3/28/23 86 Inspector Auto Scheduled Carpet, Tile and Appliances 8 days Wed 3/29/23 Fri 4/7/23 Auto Scheduled Tile entry, kitchen and baths 3 days Wed 3/29/23 Fri 3/31/23 82,87 Flooring contractor Auto Scheduled Carpet 1st floor 2 days Mon 4/3/23 Tue 4/4/23 89 Flooring contractor Auto Scheduled Carpet 2nd floor 2 days Wed 4/5/23 Thu 4/6/23 90 Flooring contractor Auto Scheduled Install appliances 1 day Fri 4/7/23 Fri 4/7/23 91 Appliance contractor Auto Scheduled Landscaping and Grounds Work 12 days Thu 3/30/23 Fri 4/14/23 Auto Scheduled Pour concrete driveway and sidewalks 2 days Thu 3/30/23 Fri 3/31/23 68 Concrete contractor Auto Scheduled Install backyard fence 2 days Mon 4/10/23 Tue 4/11/23 92,94 Fencing contractor Auto Scheduled Sod and complete plantings - front yard 2 days Wed 4/12/23 Thu 4/13/23 95 Landscape contractor Auto Scheduled Sod and complete plantings - backyard 1 day Fri 4/14/23 Fri 4/14/23 96 Landscape contractor Auto Scheduled Final Acceptance 8 days Mon 4/17/23 Wed 4/26/23 Auto Scheduled Complete final inspection for certificate of occupancy 1 day Mon 4/17/23 Mon 4/17/23 97,87,82,78,53,73,42 Inspector Auto Scheduled Cleanup for occupancy 1 day Tue 4/18/23 Tue 4/18/23 92,99 Maid service Auto Scheduled Perform final walk-through inspection 1 day Wed 4/19/23 Wed 4/19/23 100 Owner Auto Scheduled Complete punch list items 5 days Thu 4/20/23 Wed 4/26/23 101 General contractor
This program is over/under complicated. You dont have the estimates for procurement and real life situations. They hire someone to for 100k and it is a waste instead of hiring someone that will let you know time duration. Some troubleshooting of equipment cant have a time estimate.
Thank you! Your way of explaining things is so clear and concise. I have no trouble learning at all. Usually when watching tutorials like this, I have to constantly rewind because I am lost on how they just did something. I never have to rewind with your videos! Thank you!
My thoughts exactly.
THIS!!
This was an excellent and well-presented introduction to the basics of Microsoft Project. I feel like I can now go and start building a project without having to invest hours into training just for the basics.
Amazingly Helpful. Many years ago I had the nuances of project nailed and actually understand completely how to lay out the tasks, etc. but, for some reason when I came back to Project to load things up, I was completely lost again. This 15 minutes got me back straight! Thanks Cody, well done and much appreciated sir.
This was amazing! I've fallen deeper in love with project management!! I realize why Microsoft Project is highly used!
I love how this was explained in short and clear manner. I have been intimidated looking at this before and now after watching, Im too excited to try this tomorrow!
Talk about clear, concise, and to the point, this video was a gem of a find. I knew the software wasn't rocket science, and you proved that in 15 minutes, flats using project-based education, which I think is the best way to learn quick. I'm ready to operate the software now...thanks
Best MS Project I have ever seen!!!! Subscribed immediately!! Thank you Cody!!!
Best MS Project tutorial by a mile. Thanks
Greetings from Mongolia. It is pleasure to explore your teaching technic on MS project by watching in youtube. Thanks for you all effort which always goes someone who is able to do things which ever to do until watch this useful video. :)
If you guys are getting issues with your task dates with them defaulting to manual. Look at the bottom left of the page and make sure that the New tasks are set to manual by default. Hope that helps anyone stuck like I was. Great tutorial btw.
Perfect video! Long time since I've learned MS Project in the college and I could remember almost everything with this video. Very clear and concise. Congratulations!
Awesome video! Ioved the sneaky three stooges reference too haha
Thank you so much I'm finally understanding the basic concepts in more detail.
Literally the best tutorial i have ever seen. Thank you sir!
Great tips (specially for a beginner in MS Project like me). Amazing! Thanks Cody!
This is gold. Thank you for the knowledge.
Thank you for the lovely training .. this is the best explanation I've had on project on youtube as of now 😀😀😀
Thank you!! you are awesome teacher. It is very easy to understand specially Im from another country.
This is great. Well laid out. very easy to follow. Thanks!
Thank you so much! This is my first time getting to know and learn MS Project and I found your explanation very informative and helpful.
Excellent introduction! Very simple, easily followed… Thank you!
Very clear and helpful vedio for MS project
I recommend it for any body who want to learn this program in an easy way
Your way of explanation really helps a lot. Thanks for the great work and enjoy your sharing.
Really nicely laid-out and explained. Thank you for your time and effort. Very appreciated.
I learned a lot from this video. Thank you for sharing your knowledge with us.
Awesome! Your knowledge of construction could use some help, but I know that's not the point :) Again, thank you we were looking for a solution and you sealed the deal.
Wonderful video with great details and perfect sample. Thank you.
Sir, you saved my day, God bless you
Very clear explanation, thanks for the effort!
Hi Cody, thanks for your video! It’s very informative. I have some questions about the MS project. How do I deal with a huge time gap between tasks? For example, after finishing task A, we need to wait for 2 months to start the task B. Should I just add a lag time between task A and B? Thanks for your help!
Great video. Straight to the point, simple and clear.
All important (most used) features in a single, short video. thank you
HI Cody; very well briefed video. Just one thing i couldn't work out. I put everything same as per your data/details. But the "Foundation" duration is coming up as 54 days instead of 20 days (in the video), everything else looks same. Even dates are same also, can you please advise??
Thank you, Cody. Great explanation and easy to follow.
Cody you making all videos simple to understand
so helpfull, thankiu I'm following you now.
Nice Explanation made simple
Wow great video! Very easy to follow. Thanks for making it
Thank you for an outstanding video. Excellent presentation!
Thank you! Very clear and detailed without overcomplicating the tutorial.
Thank you very much for amazingly clear explanation.
I learned a lot from this video. Thanks.
Thank you a lot brother it is good show and clear.
Thanks Cody. Do you have an advanced tutorial for Projects?
Thank you so much , I understand your video
even though my english skill is not good
Mr. Baldwin. I enjoy your videos and hope you can direct me to the correct place. I have a spreadsheet with 82 counties listed as rows, and 52 weeks listed as columns. In cells I have identified if county employees are available to contact with words and colored the cells. I am trying to figure out how to determine which counties are available for our staff to meet with each county based on our information and our availability. Is there a simple way to do this? Thanks so much! Bob
I also learned a lot. Thank you!
Great explainer vid. Thank you.
Great video Cody. I learned quite a lot, thank you
Thank you for this tutorial Cody.
Have a few issues. In the trial version I can do everything up to managing resources. I don’t have access to the menu options (File, Resource, Report, View etc...)
I’m using Project Plan 1 which looks similar to this but slightly different features. (For eg Predecessors tab is called ‘Depends on’)
Project Plan 3 is a completely did interface
Great Wrok!!! Keep it Up!
What Isabella V said below! Man, I wish you had more videos on Excel in's and out's. I didn't even need this one but was curious after watching your "Learn Macros in 7 mins" and actually realized, although it didn’t speak to what I was looking for, there are a number of ways I could use this personally! I have burned so much midnight oil going through well-meaning videos searching for a particular formula only to be left with the same "What the What" face I sat down with. I soooo need to learn how to: If Sheet1 Column B contains YES then enter all data in that row to next available row on Sheet2. Do you have a video/blog/anything I missed that could walk me through? Or recommendation for another UA-camr/blog that would help? Thanks!
Great tutorial. Thank you.
Thank you a lot! You are so kind
Absolutely useful! 🙌🏻
Thanks loads, very informative
Super helpful! Thank you!
Thanks for this video you are best can you please make a video for primavera p6
Good one
Thanks
Fantastic job!
Amazing! Easy to understand. How can I get MS Projects installed on my Mac for free?
Sir is it possible to put more diversified examples ? Thanks advance
This is really helpful, thanks!
thanks, it helped me a lot🌹🌹
Merci mais y a t'il le même vidéo en français
Can anyone suggest a good tutorial video for primavera p6
Smashing the like button! Thanks man!
Thank you! , such a great help
Very good, thank you!
Great!! I really liked it!!
thank you man
THANK YOU
Seems to just be for upper management instead of real life time. So that upper management looks good.
links doesnt working
please share link to download free Microsoft project software
Why doesn't my MIcrosoft Projects look like this version.
Is it only for me ??The vedio is not clear ..its all glitchy :(
THANKYOU!
Awesome!!
This is gold
Doctor Saratu I am watching this video.
Great
Auto Scheduled 1 day? Thu 3/9/23 Thu 3/9/23 65
Auto Scheduled Paint all - 2nd floor 1 day Fri 3/10/23 Fri 3/10/23 66 Painting contractor
Auto Scheduled Paint exterior siding & trim work 4 days Fri 3/24/23 Wed 3/29/23 38 Painting contractor
Auto Scheduled Cabinets 6 days Fri 3/10/23 Fri 3/17/23
Auto Scheduled Install 1st floor - kitchen cabinets 2 days Fri 3/10/23 Mon 3/13/23 64 Finish carpentry contractor
Auto Scheduled Install 1st floor - master bath and guest cabinets 1 day Tue 3/14/23 Tue 3/14/23 70 Finish carpentry contractor
Auto Scheduled Install 2nd floor - hall bath and private bath cabinets 1 day Wed 3/15/23 Wed 3/15/23 71 Finish carpentry contractor
Auto Scheduled Install chair rails, crown moldings, trim 2 days Thu 3/16/23 Fri 3/17/23 72 Finish carpentry contractor
Auto Scheduled Finish Plumbing 6 days Tue 3/14/23 Tue 3/21/23
Auto Scheduled Complete 1st floor - kitchen plumbing 1 day Tue 3/14/23 Tue 3/14/23 70,41 Plumbing contractor
Auto Scheduled Complete 1st floor - master bath and guest plumbing 2 days Wed 3/15/23 Thu 3/16/23 75,71 Plumbing contractor
Auto Scheduled Complete 2nd floor - hall bath and private bath plumbing 2 days Fri 3/17/23 Mon 3/20/23 76,72 Plumbing contractor
Auto Scheduled Conduct finish plumbing inspection 1 day Tue 3/21/23 Tue 3/21/23 77 Inspector
Auto Scheduled Finish Electrical 3 days Tue 3/21/23 Thu 3/23/23
Auto Scheduled Complete 1st floor circuits to service panel 1 day Tue 3/21/23 Tue 3/21/23 77,44 Electric contractor
Auto Scheduled Complete 2nd floor circuits to service panel 1 day Wed 3/22/23 Wed 3/22/23 80 Electric contractor
Auto Scheduled Conduct finish electrical inspection 1 day Thu 3/23/23 Thu 3/23/23 81 Inspector
Auto Scheduled Complete communications wiring - phone, cable, computer, alarm 2 days Wed 3/22/23 Thu 3/23/23 78 Electric contractor
Auto Scheduled Finish HVAC 3 days Fri 3/24/23 Tue 3/28/23
Auto Scheduled Complete 1st floor - zone 1 HVAC 1 day Fri 3/24/23 Fri 3/24/23 83,46 Heating and AC contractor
Auto Scheduled Complete 2nd floor - zone 2 HVAC 1 day Mon 3/27/23 Mon 3/27/23 85 Heating and AC contractor
Auto Scheduled Conduct HVAC inspection 1 day Tue 3/28/23 Tue 3/28/23 86 Inspector
Auto Scheduled Carpet, Tile and Appliances 8 days Wed 3/29/23 Fri 4/7/23
Auto Scheduled Tile entry, kitchen and baths 3 days Wed 3/29/23 Fri 3/31/23 82,87 Flooring contractor
Auto Scheduled Carpet 1st floor 2 days Mon 4/3/23 Tue 4/4/23 89 Flooring contractor
Auto Scheduled Carpet 2nd floor 2 days Wed 4/5/23 Thu 4/6/23 90 Flooring contractor
Auto Scheduled Install appliances 1 day Fri 4/7/23 Fri 4/7/23 91 Appliance contractor
Auto Scheduled Landscaping and Grounds Work 12 days Thu 3/30/23 Fri 4/14/23
Auto Scheduled Pour concrete driveway and sidewalks 2 days Thu 3/30/23 Fri 3/31/23 68 Concrete contractor
Auto Scheduled Install backyard fence 2 days Mon 4/10/23 Tue 4/11/23 92,94 Fencing contractor
Auto Scheduled Sod and complete plantings - front yard 2 days Wed 4/12/23 Thu 4/13/23 95 Landscape contractor
Auto Scheduled Sod and complete plantings - backyard 1 day Fri 4/14/23 Fri 4/14/23 96 Landscape contractor
Auto Scheduled Final Acceptance 8 days Mon 4/17/23 Wed 4/26/23
Auto Scheduled Complete final inspection for certificate of occupancy 1 day Mon 4/17/23 Mon 4/17/23 97,87,82,78,53,73,42 Inspector
Auto Scheduled Cleanup for occupancy 1 day Tue 4/18/23 Tue 4/18/23 92,99 Maid service
Auto Scheduled Perform final walk-through inspection 1 day Wed 4/19/23 Wed 4/19/23 100 Owner
Auto Scheduled Complete punch list items 5 days Thu 4/20/23 Wed 4/26/23 101 General contractor
This program is over/under complicated. You dont have the estimates for procurement and real life situations. They hire someone to for 100k and it is a waste instead of hiring someone that will let you know time duration. Some troubleshooting of equipment cant have a time estimate.