Execution of Road Project Step by Step || Roads 3
Вставка
- Опубліковано 16 жов 2024
- We will see, The Operation Method (Execution Method) of the Road Project. That is, How the existing roads are modified, and how the new proposed road is developed. What are all the components used, to develop these roads? Such as Earthwork, Subbase, Wetmix, Asphalt, Road Marking, Kerbstone, and What are all the specifications and procedures that are followed, such as, subgrade, subbase, wet mix, asphalt, and other miscellaneous items?
Title Music :
Elegant Logo - Nice and Fresh Inspirational Music Ident by Free Music | / fm_freemusic
Background Music by :
Music: mixkit.co/
#Highway #Subbase #Wetmix #Asphalt #Bitumen #Primecoat #Tackcoat #Civil_Guru #Roads #Survey #Levelling #Civil #Engineering #Central_Median #T_Junction #roundabouts #Four_Laning #Earthwork #Civil_Engineering #Civil #Engineering #Building_Material #Real_Estate #Contracting #Construction #Variations #Dispute #Arbitration #EOT #Claims #Highway
#Bridges #UPSC #TNPSC #IES #JEE
Very instructing
Thank you very much
Very helpful
Woow…amazing stuff
Thank you very much for your feedback
Great
Thank you very much for your comments
buenisimo..
Thank you very much
Pls, when is the right time to install Kerb Stone?
For new roads, after wetmix and before Asphat work
For Existing roads after camber correction and before Bituminous Mecadom
Follow the video, it is given as per the steps, step by step procedure