Devonshire Square, London - Construction Time-Lapse

Поділитися
Вставка
  • Опубліковано 3 жов 2024
  • The "Cut and Carve" of a high rise building in London - 7 Devonshire Square.
    The contractors, "BUILT", demolished the top two floors and then rebuilt them with an extra one on top.
    The video was shot over a period of 19 months.

КОМЕНТАРІ •