Devonshire Square, London - Construction Time-Lapse
Вставка
- Опубліковано 3 жов 2024
- The "Cut and Carve" of a high rise building in London - 7 Devonshire Square.
The contractors, "BUILT", demolished the top two floors and then rebuilt them with an extra one on top.
The video was shot over a period of 19 months.