Large, single stream natural gas pressure reducing station and pre-heat system

Поділитися
Вставка
  • Опубліковано 5 жов 2024
  • Our gas division has recently built a large, single stream natural gas pressure reducing station and pre-heat system at our dedicated manufacturing facility in Elford. The system is pre-trimmed to accept a 30% hydrogen blend and has a minimum design life of 25 years. The heatpak was designed by FTPS engineers to use waste steam on site to pre-heat the gas prior to depressurisation, thereby providing a greener alternative to NG or electrical pre-heat. This particular PRS was over 12m long and weighed more than 13 tonnes.

КОМЕНТАРІ •