Aruwakkalu to Puttalam INSEE Cement Train Sri Lanka | SAN | WDM-6 Locomotive

Поділитися
Вставка
  • Опубліковано 1 лют 2025

КОМЕНТАРІ • 12

  • @trainlovers1212
    @trainlovers1212 2 роки тому

    Great job 👍👍

  • @nikosjk1
    @nikosjk1 2 роки тому

    Nice video! How often do these trains operate, is there a specific schedule?

    • @roamwithchiraa
      @roamwithchiraa  2 роки тому +1

      Thank you ❤️ These trains do operate between two to four times per day. Usually in morning and evening. There is no specific schedule and it varies on there need of raw materials.

    • @nikosjk1
      @nikosjk1 2 роки тому

      @@roamwithchiraa Thank you for the info! Would love to photograph this operation next time I am in Sri Lanka.

    • @roamwithchiraa
      @roamwithchiraa  2 роки тому +1

      When needed contact Puttalam railway station for operation times for that day +94322265271

  • @ashenruchinthane7033
    @ashenruchinthane7033 2 роки тому

  • @dragonbrosgaming4922
    @dragonbrosgaming4922 2 роки тому

    Why don't these engines use to pull passenger train

    • @roamwithchiraa
      @roamwithchiraa  2 роки тому

      There are more efficient engines than these for passenger trains. These are mainly shunting engines and the SAN is too much long.

  • @sachintharaka744
    @sachintharaka744 2 роки тому