Розмір відео: 1280 X 720853 X 480640 X 360
Показувати елементи керування програвачем
Автоматичне відтворення
Автоповтор
Great job 👍👍
Thank you ❤️
Nice video! How often do these trains operate, is there a specific schedule?
Thank you ❤️ These trains do operate between two to four times per day. Usually in morning and evening. There is no specific schedule and it varies on there need of raw materials.
@@roamwithchiraa Thank you for the info! Would love to photograph this operation next time I am in Sri Lanka.
When needed contact Puttalam railway station for operation times for that day +94322265271
❤
Why don't these engines use to pull passenger train
There are more efficient engines than these for passenger trains. These are mainly shunting engines and the SAN is too much long.
Great job 👍👍
Thank you ❤️
Nice video! How often do these trains operate, is there a specific schedule?
Thank you ❤️ These trains do operate between two to four times per day. Usually in morning and evening. There is no specific schedule and it varies on there need of raw materials.
@@roamwithchiraa Thank you for the info! Would love to photograph this operation next time I am in Sri Lanka.
When needed contact Puttalam railway station for operation times for that day +94322265271
❤
Thank you ❤️
Why don't these engines use to pull passenger train
There are more efficient engines than these for passenger trains. These are mainly shunting engines and the SAN is too much long.
❤
Thank you ❤️