This process is very very dangerous after long perion. Creep is more here and doesn't have use development bond length that's why this process is not suitable for construction.
This type of construction doesn't last long. It cracks and also the chicken mesh gets rusted. Then after it starts to fall and become dangerous. I had it removed within 5-7 years.
This process is very very dangerous after long perion. Creep is more here and doesn't have use development bond length that's why this process is not suitable for construction.
Kya kaha samjh nahi aya?
@@Blspeek-agthat is Engineering term and details actual reason
I was searching for this video from the last 4-5 months. Thank god it found today
👍
Plaster only cement or sand mixing
I have been searching for this finally found it
🙏 welcome
How much length front slab..? How much drop length..?
Front Slab_8ft
Drop 2ft
Wow good
Sir jali me cement water laga jata he kya ya koi or Mila jata he sand
Why!!!!!! Good job
This type of construction doesn't last long. It cracks and also the chicken mesh gets rusted. Then after it starts to fall and become dangerous. I had it removed within 5-7 years.
Nice technique. What is the rate per square feet?
Very nice post 👌👍🙂👌👍👍
perfect technique
Hai friends
Show the final output video
Coming soon
Camera 📸 Mam ☺️
Amazing job sir
work is no good 😮😮😮
In long term this gets cracks
rong idea
No good
No good performance
बस एक गलती हुवी है इसमें
Btao konsi