3.5km OSISIOMA EKEAKPARA NNPC INDUSTRIAL ROAD WITH CEMENT CONCRETE PAVEMENT.

Поділитися
Вставка
  • Опубліковано 24 сер 2024
  • #govalexotti #asaridokubo #aba #abialive #abiastate #beyonce #biafra #channelstv #tinubu #igboamaka

КОМЕНТАРІ • 37

  • @victoruchenna7239
    @victoruchenna7239 2 місяці тому +1

    Nice job 👍. This is the best, Cement is the best idea for this road 🛣️.

  • @teetee2812
    @teetee2812 2 місяці тому +4

    Thank you for doing a great job, giving Abia the positive visibility it deserves…

  • @BLOOMINGMOTHERCAREGLOBAL-sh7ms
    @BLOOMINGMOTHERCAREGLOBAL-sh7ms 2 місяці тому +1

    Kepukepu you're doing a great job. Well done. ❤

  • @uchechukwukatv344
    @uchechukwukatv344 2 місяці тому +2

    Kepu nice work God bless our governor, please try and see that urata road is too bad people there are suffering

  • @yudeudy7896
    @yudeudy7896 2 місяці тому +4

    No doubt the quality of the construction is very good, but such high quality road needs standard drainage, please let them reconstruct the drainage and the road is a very busy road with big trucks, let them build walkways for pedestrians

  • @adamssolomon2919
    @adamssolomon2919 2 місяці тому +2

    Nice one dont need to wait for federal govt i like this do the road and collect your money from federal after and nice one from ministry of works abia state they are trying

  • @user-xm8ew8cv8o
    @user-xm8ew8cv8o 2 місяці тому

    Thank you gov c otti on your efforts to bring back Old aba glory

  • @christopherchinedu-vz1bq
    @christopherchinedu-vz1bq 2 місяці тому +1

    The quality of the road is standard, i hope they widen the drainages to contain the flooding.

  • @fredrickchibuzor882
    @fredrickchibuzor882 2 місяці тому

    This road needs expansion pls.. and needs to be handled by julius Berger

  • @teetee2812
    @teetee2812 2 місяці тому +4

    Thanks!

    • @kepukepuTv
      @kepukepuTv  2 місяці тому +2

      Thank you so much boss for gifting me

  • @afrounite
    @afrounite 2 місяці тому +1

    That company lacks the equipment to handle that projec nah

  • @fredrickchibuzor882
    @fredrickchibuzor882 2 місяці тому +2

    This road supposed to be handled by julius Berger, not this rubbish company

  • @fredrickchibuzor882
    @fredrickchibuzor882 2 місяці тому +1

    Seems u said big trucks are operating in this road, Alex Otti supposed to call julius Berger to fix this road

  • @Rigital123
    @Rigital123 2 місяці тому

    I will, recommend that the contract removes the road median and take on the entire road during the construction after which, the road median can be fixed.

  • @jayf.k2497
    @jayf.k2497 2 місяці тому

    Why are they not using concrete vibrator ???? Concrete vibrator can do that way better and faster

  • @fredrickchibuzor882
    @fredrickchibuzor882 2 місяці тому +1

    My people this work here is very very poor and local.. this road needs expansion

  • @chidistar312
    @chidistar312 2 місяці тому

    Try to go to Newmarket road the road is very bad there

  • @henryuwa5151
    @henryuwa5151 2 місяці тому

    That road is poorly built. Why don't the use concrete vibratory. The road won't last

  • @emekadiokpa6714
    @emekadiokpa6714 2 місяці тому

    The drainage is too small

    • @mishkarushnie6840
      @mishkarushnie6840 2 місяці тому

      Flooding is not really a major obstacule here the topograghy is thats why they chose the cement concrete base line

  • @fidelisfidels5450
    @fidelisfidels5450 2 місяці тому

    Very poor construction company,the work is too local.

    • @mishkarushnie6840
      @mishkarushnie6840 2 місяці тому +1

      If JB is contracted you will be first to complain pretending to believe and trust locally owned companies , now its direct labour you re nicknaming them already , lets pray for its completion before our arm chair analysis ,

    • @fidelisfidels5450
      @fidelisfidels5450 2 місяці тому

      @@mishkarushnie6840 how can you compare JB with dis local company, this ppls can be able to finish dat road,they will run away very soon.

    • @godwinfelix4488
      @godwinfelix4488 2 місяці тому +3

      What I hate is that people who don't know anything are the ones to condnme things.

    • @mishkarushnie6840
      @mishkarushnie6840 2 місяці тому

      @@fidelisfidels5450 mr please go through the write up agian , if i guess started that article which is a conditional expression , whats your fear their not looking competent or their looking dubious ???

    • @templekanu6740
      @templekanu6740 2 місяці тому

      If you are rightly educated, tou will know that local achievement is the most important achievement for any people. You need local construction, local military power, local everything. Ebonyi was transformed by local construction.

  • @fredrickchibuzor882
    @fredrickchibuzor882 2 місяці тому

    My man this work isn’t neat at all

  • @maziugochukwu6167
    @maziugochukwu6167 2 місяці тому

    The process, the construction looks so poorly done.

  • @IKENNADANIEL-de1uo
    @IKENNADANIEL-de1uo 2 місяці тому

    I don't know 😢😢who brought the idea of using cement to build roads this is the worst kind of road construction it won't last as long as is cement

    • @yudeudy7896
      @yudeudy7896 2 місяці тому +1

      It will be Asphalted

    • @adamssolomon2919
      @adamssolomon2919 2 місяці тому

      Cement and then you ashalt is best it last longer roads can be done by cement its stronger than you just asphalt the best thing is to wait till is done I guess the governor wants to see how good the ministry of works are they have done some works in some streets so doing this federal road and remember this is federal road so the govt will get there money and maybe government said hoe much they can pay so the governor used this to get the desired result they will deliver ok.

    • @jayf.k2497
      @jayf.k2497 2 місяці тому

      What are you saying ???